An optimization mathematical model of the pile forces for piled breasting dolphins in the open sea under various loading conditions is presented. The optimum layout with the well distributed pile forces and the least ...An optimization mathematical model of the pile forces for piled breasting dolphins in the open sea under various loading conditions is presented. The optimum layout with the well distributed pile forces and the least number of piles is achieved by the multiplier penalty function method. Several engineering cases have been calculated and compared with the result of the conventional design method. It is shown that the number of piles can be reduced at least by 10%~20% and the piles' bearing state is improved greatly.展开更多
为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业...为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业工况和结构强度与结构稳定性等方面对导向架进行综合研究。经海试验证,优化的导向架的打桩精度与打桩高效性均满足技术指标要求,可大幅提高深海风机钢管桩基础安装作业速度和质量。展开更多
基金TheworkwassupportedbytheNationalFoundationofHighPerformanceComputation (No .9810 0 5 )
文摘An optimization mathematical model of the pile forces for piled breasting dolphins in the open sea under various loading conditions is presented. The optimum layout with the well distributed pile forces and the least number of piles is achieved by the multiplier penalty function method. Several engineering cases have been calculated and compared with the result of the conventional design method. It is shown that the number of piles can be reduced at least by 10%~20% and the piles' bearing state is improved greatly.
文摘为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业工况和结构强度与结构稳定性等方面对导向架进行综合研究。经海试验证,优化的导向架的打桩精度与打桩高效性均满足技术指标要求,可大幅提高深海风机钢管桩基础安装作业速度和质量。