Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, ...Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, since the overall risk level of the highway design is unknown to the designers. This paper describes a method for the simultaneous consideration of traffic safety risks and the associated cost burden related to the appropriate planning and design of a mountainous highway. The method can be carried out in four steps: First, the highway design is represented by a new parametric framework to extract the key design variables that affect not only the life-cycle cost but also the operational safety. Second, the relationship between the life-cycle cost and the operational safety risk factors is established in the cost-estimation functions. Third, a fault tree analysis (FTA) is introduced to identify the traffic risk factors from the design variables. The safety performance of the design solutions is also assessed by the generalized linear-regression model. Fourth, a theory of acceptable risk analysis is introduced to the traffic safety assessment, and a computing algorithm is proposed to solve for a cost-efficient optimal solution within the range of acceptable risk, in order to help decision-makers. This approach was applied and examined in the Sichuan–Tibet Highway engineering project, which is located in a complex area with a large elevation gradient and a wide range of mountains. The experimental results show that the proposed approach significantly improved both the safety and cost performance of the project in the study area.展开更多
Owing to high costs and unnecessary inspections necessitated by the traditional inspection planning for ship structures, the risk-based inspection and repair planning should be investigated for the most cost-effective...Owing to high costs and unnecessary inspections necessitated by the traditional inspection planning for ship structures, the risk-based inspection and repair planning should be investigated for the most cost-effective inspection. This paper aims to propose a cost-benefit assessment model of risk-based inspection and repair planning for ship structures subjected to corrosion deterioration. Then, the benefit-cost ratio is taken to be an index for the selection of the optimal inspection and repair strategy. The planning problem is formulated as an optimization problem where the benefit-cost ratio for the expected lifetime is maximized with a constraint on the minimum acceptalbe reliability index. To account for the effect of corrosion model uncertainty on the cost-benefit assessment, two corrosion models, namgly, Paik' s model and Guedes Soares' model, are adopted for analysis. A numerical example is presented to illustrate the proposed method. Sensitivity studies are also providet. The results indicate that the proposed method of risk-based cost-benefit analysis can effectively integrate the economy with reliability of the inspection and repair planning. A balance can be achieved between the risk cost and total expected inspection and repair costs with the proposed method, which is very. effective in selecting the optimal inspection and repair strategy. It is pointed out that the corrosion model uncertainty and parametric uncertaintg have a significant impact on the cost-benefit assessment of inspection and repair planning.展开更多
The incentive effects and dynamic aspects of the inventory system were discussed in this paper. The wage policy was regarded as a factor to influence workers' thinking of their action. A multiple objective problem...The incentive effects and dynamic aspects of the inventory system were discussed in this paper. The wage policy was regarded as a factor to influence workers' thinking of their action. A multiple objective problem was constructed for the owners and the workers. At the same time, the planning stability is considered in the presented model. Since the process speed is decided by the dynamic demand of production or the interior system itself, two situations were discussed in this paper.展开更多
An increasing number of drivers are relying on digital map navigation systems in vehicles or mobile phones to select optimal driving routes in order to save time and improve safety. In the near future, digital map nav...An increasing number of drivers are relying on digital map navigation systems in vehicles or mobile phones to select optimal driving routes in order to save time and improve safety. In the near future, digital map navigation systems are expected to play more important roles in transportation systems. In order to extend current navigation systems to more applications, two fundamental problems must be resolved: the lane-level map model and lane-level route planning. This study proposes solutions to both problems. The current limitation of the lane-level map model is not its accuracy but its flexibility;this study proposes a novel seven-layer map structure, called as Tsinghua map model, which is able to support autonomous driving in a flexible and efficient way. For lane-level route planning, we propose a hierarchical route-searching algorithm to accelerate the planning process, even in the presence of complicated lane networks. In addition, we model the travel costs allocated for lane-level road networks by analyzing vehicle maneuvers in traversing lanes, changing lanes, and turning at intersections. Tests were performed on both a grid network and a real lane-level road network to demonstrate the validity and efficiency of the proposed algorithm.展开更多
This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we pr...This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we propose a mixed integer programming model solved by a Branch-Band and Heuristic Search method.Finally,the simulation result is given and analyzed.The planning method based on a mixed integer programming model can save 20 percentage of the overall planning cost,compared with the greedy algorithm.The relationship between the convergence network planning cost and frequency usage is also analyzed.The optimized planning result with the lowest cost can be acquired through the best frequency usage.展开更多
Various structures such as marine structures age over time. In order to always maintain safety conditions, maintenance processes including inspection and repair should be implemented on them. Corrosion and fatigue cra...Various structures such as marine structures age over time. In order to always maintain safety conditions, maintenance processes including inspection and repair should be implemented on them. Corrosion and fatigue cracks are two main factors that reduce the ultimate strength of the ship's hull girder over time and thus increase the probability and risk of failure. At the time of inspection,the structural conditions must be checked so that, if necessary, the required repairs can be done on it. The main objective of this paper is to provide optimized maintenance plans of the ship structure based on probabilistic concepts with regard to corrosion and fatigue cracks. Maintenance activities increase the operational costs of ships; therefore, it is advisable to inspect and repair in the optimal times. Optimal maintenance planning of the ship structure can be conducted by formulating and solving a multi-objective optimization problem. The use of risk as a structural performance indicator has become more common in recent years. The objective functions of the optimization problem include minimizing the structure's lifecycle maintenance costs, including inspection and repair costs, and also minimizing the maximum risk of structural failure during the ship's life. In the following,to achieve better responses, reliability index has been added to the problem as the third objective function. The multi-objective optimization problem is solved using genetic algorithms. The proposed risk-based approach is applied to the hull structure of a tanker ship.展开更多
According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its...According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development.展开更多
The sustainability of the healthcare system has been in question for several years. With rising healthcare costs, limited resources and an aging population, society needs to come up with innovative ideas to reduce hea...The sustainability of the healthcare system has been in question for several years. With rising healthcare costs, limited resources and an aging population, society needs to come up with innovative ideas to reduce healthcare spending. This paper attempts to illustrate how addressing goals of care can have a significant impact on healthcare costs.展开更多
Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water ...Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water quality models for the river and reservoir were built;and function of water bodies and environmental assimilative capacity were determined ;and then the planning for industrial pollution sources and concentrated sewage treatment were made respectively.展开更多
Solid Waste Management (SWM) system in Basrah has deteriorated recently to the point that only limited waste collection is undertaken in certain urban areas and disposal is largely to uncontrolled dump sites. In this ...Solid Waste Management (SWM) system in Basrah has deteriorated recently to the point that only limited waste collection is undertaken in certain urban areas and disposal is largely to uncontrolled dump sites. In this study, the technical, economical, and environmental aspects of three SWM scenarios were investigated aiming to compare the scenarios and select the most appropriate one for implementation. Scenario 1 was to consider waste disposal into a sanitary landfill. Scenario 2 added waste transportation to transfer station before disposal to a sanitary landfill. Scenario 3 considered waste sorting, recycling and composting followed by landfill disposal in an integrated treatment disposal facility. The current open dumping practice was considered as the baseline scenario. According to economic analysis, the benefits from the revenues of selling the produced recyclables and compost did not improve the ranking of scenario 3. However, scenario 3 has gained positive recognition due to the environmental benefits of waste recycling. Therefore, final recommendations were in favour of scenario 3, which has been approved by the UNICEF, as well. Currently the recommended scenario is under implementation in Basrah, Iraq.展开更多
To utilizing the characteristic of radar cross section (RCS) of the low detectable aircraft, a special path planning algorithm to eluding radars by the variable RCS is presented. The algorithm first gives the RCS ch...To utilizing the characteristic of radar cross section (RCS) of the low detectable aircraft, a special path planning algorithm to eluding radars by the variable RCS is presented. The algorithm first gives the RCS changing model of low detectable aircraft, then establishes a threat model of a ground-based air defense system according to the relations between RCS and the radar range coverage. By the new cost functions of the flight path, which consider both factors of the survival probability and the distance of total route, this path planning method is simulated based on the Dijkstra algorithm, and the planned route meets the flight capacity constraints. Simulation results show that using the effective path planning algorithm, the low detectable aircraft can give full play to its own advantage of stealth to achieve the purpose of silent penetration.展开更多
The problem of power system planning, due to its complexity and dimensionality, is one of the most challenging problems facing the electric power industry in developing as well as developed countries. In planning phas...The problem of power system planning, due to its complexity and dimensionality, is one of the most challenging problems facing the electric power industry in developing as well as developed countries. In planning phase, two of the most important decision-making parameters are the reliability and costs. The latter includes both system investment costs and outages costs. In this paper, these parameters are described and the interrelation between them is evaluated. Some previous approaches and developed techniques will he applied to a particular planning problem in a developing country and some aspects having a significant impact on the decision making process in the planning phase will be considered.展开更多
基金the National Natural Science Foundation of China (71732001, 51878311, and 51678265)the Research Project of the Chinese Academy of Engineering (2017-XZ-12).
文摘Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, since the overall risk level of the highway design is unknown to the designers. This paper describes a method for the simultaneous consideration of traffic safety risks and the associated cost burden related to the appropriate planning and design of a mountainous highway. The method can be carried out in four steps: First, the highway design is represented by a new parametric framework to extract the key design variables that affect not only the life-cycle cost but also the operational safety. Second, the relationship between the life-cycle cost and the operational safety risk factors is established in the cost-estimation functions. Third, a fault tree analysis (FTA) is introduced to identify the traffic risk factors from the design variables. The safety performance of the design solutions is also assessed by the generalized linear-regression model. Fourth, a theory of acceptable risk analysis is introduced to the traffic safety assessment, and a computing algorithm is proposed to solve for a cost-efficient optimal solution within the range of acceptable risk, in order to help decision-makers. This approach was applied and examined in the Sichuan–Tibet Highway engineering project, which is located in a complex area with a large elevation gradient and a wide range of mountains. The experimental results show that the proposed approach significantly improved both the safety and cost performance of the project in the study area.
文摘Owing to high costs and unnecessary inspections necessitated by the traditional inspection planning for ship structures, the risk-based inspection and repair planning should be investigated for the most cost-effective inspection. This paper aims to propose a cost-benefit assessment model of risk-based inspection and repair planning for ship structures subjected to corrosion deterioration. Then, the benefit-cost ratio is taken to be an index for the selection of the optimal inspection and repair strategy. The planning problem is formulated as an optimization problem where the benefit-cost ratio for the expected lifetime is maximized with a constraint on the minimum acceptalbe reliability index. To account for the effect of corrosion model uncertainty on the cost-benefit assessment, two corrosion models, namgly, Paik' s model and Guedes Soares' model, are adopted for analysis. A numerical example is presented to illustrate the proposed method. Sensitivity studies are also providet. The results indicate that the proposed method of risk-based cost-benefit analysis can effectively integrate the economy with reliability of the inspection and repair planning. A balance can be achieved between the risk cost and total expected inspection and repair costs with the proposed method, which is very. effective in selecting the optimal inspection and repair strategy. It is pointed out that the corrosion model uncertainty and parametric uncertaintg have a significant impact on the cost-benefit assessment of inspection and repair planning.
文摘The incentive effects and dynamic aspects of the inventory system were discussed in this paper. The wage policy was regarded as a factor to influence workers' thinking of their action. A multiple objective problem was constructed for the owners and the workers. At the same time, the planning stability is considered in the presented model. Since the process speed is decided by the dynamic demand of production or the interior system itself, two situations were discussed in this paper.
基金the National Key Research and Development Program of China (2018YFB0105000)the National Natural Science Foundation of China (61773234 and U1864203)+2 种基金the Project of Tsinghua University and Toyota Joint Research Center for AI Technology of Automated Vehicle (TT2018-02)the International Science and Technology Cooperation Program of China (2016YFE0102200)the software developed in the Beijing Municipal Science and Technology Program (D171100005117001 and Z181100005918001).
文摘An increasing number of drivers are relying on digital map navigation systems in vehicles or mobile phones to select optimal driving routes in order to save time and improve safety. In the near future, digital map navigation systems are expected to play more important roles in transportation systems. In order to extend current navigation systems to more applications, two fundamental problems must be resolved: the lane-level map model and lane-level route planning. This study proposes solutions to both problems. The current limitation of the lane-level map model is not its accuracy but its flexibility;this study proposes a novel seven-layer map structure, called as Tsinghua map model, which is able to support autonomous driving in a flexible and efficient way. For lane-level route planning, we propose a hierarchical route-searching algorithm to accelerate the planning process, even in the presence of complicated lane networks. In addition, we model the travel costs allocated for lane-level road networks by analyzing vehicle maneuvers in traversing lanes, changing lanes, and turning at intersections. Tests were performed on both a grid network and a real lane-level road network to demonstrate the validity and efficiency of the proposed algorithm.
基金supported by National High Technical Research and Development Program of China(863 program)under Grant No.2009AA01A345Fundamental Research Funds for the Central Universities under Grant No.BUPT2009RC0402
文摘This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we propose a mixed integer programming model solved by a Branch-Band and Heuristic Search method.Finally,the simulation result is given and analyzed.The planning method based on a mixed integer programming model can save 20 percentage of the overall planning cost,compared with the greedy algorithm.The relationship between the convergence network planning cost and frequency usage is also analyzed.The optimized planning result with the lowest cost can be acquired through the best frequency usage.
文摘Various structures such as marine structures age over time. In order to always maintain safety conditions, maintenance processes including inspection and repair should be implemented on them. Corrosion and fatigue cracks are two main factors that reduce the ultimate strength of the ship's hull girder over time and thus increase the probability and risk of failure. At the time of inspection,the structural conditions must be checked so that, if necessary, the required repairs can be done on it. The main objective of this paper is to provide optimized maintenance plans of the ship structure based on probabilistic concepts with regard to corrosion and fatigue cracks. Maintenance activities increase the operational costs of ships; therefore, it is advisable to inspect and repair in the optimal times. Optimal maintenance planning of the ship structure can be conducted by formulating and solving a multi-objective optimization problem. The use of risk as a structural performance indicator has become more common in recent years. The objective functions of the optimization problem include minimizing the structure's lifecycle maintenance costs, including inspection and repair costs, and also minimizing the maximum risk of structural failure during the ship's life. In the following,to achieve better responses, reliability index has been added to the problem as the third objective function. The multi-objective optimization problem is solved using genetic algorithms. The proposed risk-based approach is applied to the hull structure of a tanker ship.
文摘According to the particularity of the open pit, the main influencing factors of mining quantity about mineral resources have been summarized systematically in life cycle and the structured hierarchical relation of its influencing factors has been constructed. In the light of the production process of open pit, the functional relationships between investment, mining cost and mining quantity have been defined based on the process of mining and loading so that the relation of the life cycle cost and mining quantity can be set up. And what’s more, in order to obtain the maximum economic profit of mining enterprises in life cycle, the planning model of mining quantity has been established based on the life cycle cost. The rational distribution of mining quantity will have been found on the condition of obtaining optimal solution about the planning model so as to determine scientifically the production scale of mining enterprises from the point of view of the sustainable development.
文摘The sustainability of the healthcare system has been in question for several years. With rising healthcare costs, limited resources and an aging population, society needs to come up with innovative ideas to reduce healthcare spending. This paper attempts to illustrate how addressing goals of care can have a significant impact on healthcare costs.
文摘Water pollution control planning for the Taizi River watershed,a typical Chinese case study,is presented in this paper. Based on comprehensive analysis.water quality in the watershed was assessed and predicated;water quality models for the river and reservoir were built;and function of water bodies and environmental assimilative capacity were determined ;and then the planning for industrial pollution sources and concentrated sewage treatment were made respectively.
文摘Solid Waste Management (SWM) system in Basrah has deteriorated recently to the point that only limited waste collection is undertaken in certain urban areas and disposal is largely to uncontrolled dump sites. In this study, the technical, economical, and environmental aspects of three SWM scenarios were investigated aiming to compare the scenarios and select the most appropriate one for implementation. Scenario 1 was to consider waste disposal into a sanitary landfill. Scenario 2 added waste transportation to transfer station before disposal to a sanitary landfill. Scenario 3 considered waste sorting, recycling and composting followed by landfill disposal in an integrated treatment disposal facility. The current open dumping practice was considered as the baseline scenario. According to economic analysis, the benefits from the revenues of selling the produced recyclables and compost did not improve the ranking of scenario 3. However, scenario 3 has gained positive recognition due to the environmental benefits of waste recycling. Therefore, final recommendations were in favour of scenario 3, which has been approved by the UNICEF, as well. Currently the recommended scenario is under implementation in Basrah, Iraq.
文摘To utilizing the characteristic of radar cross section (RCS) of the low detectable aircraft, a special path planning algorithm to eluding radars by the variable RCS is presented. The algorithm first gives the RCS changing model of low detectable aircraft, then establishes a threat model of a ground-based air defense system according to the relations between RCS and the radar range coverage. By the new cost functions of the flight path, which consider both factors of the survival probability and the distance of total route, this path planning method is simulated based on the Dijkstra algorithm, and the planned route meets the flight capacity constraints. Simulation results show that using the effective path planning algorithm, the low detectable aircraft can give full play to its own advantage of stealth to achieve the purpose of silent penetration.
文摘The problem of power system planning, due to its complexity and dimensionality, is one of the most challenging problems facing the electric power industry in developing as well as developed countries. In planning phase, two of the most important decision-making parameters are the reliability and costs. The latter includes both system investment costs and outages costs. In this paper, these parameters are described and the interrelation between them is evaluated. Some previous approaches and developed techniques will he applied to a particular planning problem in a developing country and some aspects having a significant impact on the decision making process in the planning phase will be considered.