At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during t...At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during the "14^(th) Five-Year Plan" period is very important. In this paper,the plan environmental impact assessment of power grid in the Development Plan for Power Grid in Nanjing during the "13^(th) Five-Year Plan" Period is studied to further discuss the ideas,evaluation system and content framework of plan environmental impact assessment of power grid.展开更多
The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Enviro...Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R. China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time. In order to promote the implementation of "The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiently and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currently to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.展开更多
On the basis of experimental works of planning environmental impact assessment, works of planning environmental impact assessment such as each of the city's special planning and development zone planning were compreh...On the basis of experimental works of planning environmental impact assessment, works of planning environmental impact assessment such as each of the city's special planning and development zone planning were comprehensively promoted in Wuhan City, which effectively promoted the adjustment of Wuhan industrial structure, the rational layout of functions and the efficient utilization of resources, and laid a solid foundation for Wuhan City to be the supporting point for the rise of central China. Here, the work carried out in Wuhan was reviewed, combined with the new requirements of the current ecological civilization construction in Wuhan City, and the framework, the key technical points and the important focuses of the carrying out of the tracking evaluation of planning environmental impact assessment were proposed.展开更多
Strategic environmental assessment (SEA) in China has developed rapidly since it was introduced into China in the 1990s. Chinese government promulgated the Environmental Impact Assessment Law of China (hereinafter ref...Strategic environmental assessment (SEA) in China has developed rapidly since it was introduced into China in the 1990s. Chinese government promulgated the Environmental Impact Assessment Law of China (hereinafter referred to as the EIA Law) in 2002. In this law, it is stipulated clearly that regional and sector plans should be assessed. Through investigating materials and analyzing literatures, this article analyses the practical and academic study achievements of SEA in China that have been achieved since the EIA Law was implemented, probes into the current situation of the main level of SEA in China-plan EIA, then summarizes the development characteristics, and eventually, puts forward the development trends of SEA in China. The research conclusions can offer the foundations for comprehending systematically the progress of SEA in China.展开更多
Environmental problems like haze have brought great pressure to current environmental protection management. On the one hand, plan EIA should be promoted further in all industries; on the other hand, the current achie...Environmental problems like haze have brought great pressure to current environmental protection management. On the one hand, plan EIA should be promoted further in all industries; on the other hand, the current achievements and methods of plan EIA should be summarized and innovated. And the EIA supervision and project access can be improved further through the coordination between plan EIA and project EIA. In this study, from the three levels of plan EIA policy framework, five problems of plan EIA in power sector were analyzed according to the current situation of plan EIA in power sector. Based on the present achievements, five macroscopic suggestions were proposed from the view of innovation accord- ing to the new environmental protection situation and requirements at present.展开更多
Starting from the historical evolution of China s regional coordinated development policy and practice,three stages of"enlightenment stage","development stage"and"maturity stage",as well ...Starting from the historical evolution of China s regional coordinated development policy and practice,three stages of"enlightenment stage","development stage"and"maturity stage",as well as the connotation,characteristics and content of implementing regional coordinated development strategy were analyzed.On this basis,from different aspects of industrial distribution,pollutant characteristics and regional environmental protection policy,the existing ecological and environmental protection problems in China s regional coordinated development in the new era were analyzed,and some suggestions for the next step were put forward.It is necessary to follow the"four ones"concept from the overall point of view,implement"three lines and one list"from the perspective of the width of the access red line,strengthen"joint prevention and control"from the perspective of the depth of regional regulation,deepen the"planning environmental impact assessment"from the perspective of the breadth of industrial distribution,and promote the"green-way model"from the perspective of ecological low carbon.展开更多
文摘At present,the plan environmental impact assessment of power transmission and transformation grid is relatively mature. How to further improve the quality of plan environmental impact assessment of power grid during the "14^(th) Five-Year Plan" period is very important. In this paper,the plan environmental impact assessment of power grid in the Development Plan for Power Grid in Nanjing during the "13^(th) Five-Year Plan" Period is studied to further discuss the ideas,evaluation system and content framework of plan environmental impact assessment of power grid.
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
文摘Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R. China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time. In order to promote the implementation of "The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiently and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currently to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.
文摘On the basis of experimental works of planning environmental impact assessment, works of planning environmental impact assessment such as each of the city's special planning and development zone planning were comprehensively promoted in Wuhan City, which effectively promoted the adjustment of Wuhan industrial structure, the rational layout of functions and the efficient utilization of resources, and laid a solid foundation for Wuhan City to be the supporting point for the rise of central China. Here, the work carried out in Wuhan was reviewed, combined with the new requirements of the current ecological civilization construction in Wuhan City, and the framework, the key technical points and the important focuses of the carrying out of the tracking evaluation of planning environmental impact assessment were proposed.
基金the support of Youth Foundation of Study on Discipline Development,Harbin University (Grant No.HXKQ200812)
文摘Strategic environmental assessment (SEA) in China has developed rapidly since it was introduced into China in the 1990s. Chinese government promulgated the Environmental Impact Assessment Law of China (hereinafter referred to as the EIA Law) in 2002. In this law, it is stipulated clearly that regional and sector plans should be assessed. Through investigating materials and analyzing literatures, this article analyses the practical and academic study achievements of SEA in China that have been achieved since the EIA Law was implemented, probes into the current situation of the main level of SEA in China-plan EIA, then summarizes the development characteristics, and eventually, puts forward the development trends of SEA in China. The research conclusions can offer the foundations for comprehending systematically the progress of SEA in China.
基金Supported by the Scientific Research Project of Environmental Protection Public Welfare Industry (201509021)
文摘Environmental problems like haze have brought great pressure to current environmental protection management. On the one hand, plan EIA should be promoted further in all industries; on the other hand, the current achievements and methods of plan EIA should be summarized and innovated. And the EIA supervision and project access can be improved further through the coordination between plan EIA and project EIA. In this study, from the three levels of plan EIA policy framework, five problems of plan EIA in power sector were analyzed according to the current situation of plan EIA in power sector. Based on the present achievements, five macroscopic suggestions were proposed from the view of innovation accord- ing to the new environmental protection situation and requirements at present.
基金Supported by Special Project for Prevention and Control of Air Pollution from Fixed Sources of Ministry of Ecology and Environment,China(2020A060).
文摘Starting from the historical evolution of China s regional coordinated development policy and practice,three stages of"enlightenment stage","development stage"and"maturity stage",as well as the connotation,characteristics and content of implementing regional coordinated development strategy were analyzed.On this basis,from different aspects of industrial distribution,pollutant characteristics and regional environmental protection policy,the existing ecological and environmental protection problems in China s regional coordinated development in the new era were analyzed,and some suggestions for the next step were put forward.It is necessary to follow the"four ones"concept from the overall point of view,implement"three lines and one list"from the perspective of the width of the access red line,strengthen"joint prevention and control"from the perspective of the depth of regional regulation,deepen the"planning environmental impact assessment"from the perspective of the breadth of industrial distribution,and promote the"green-way model"from the perspective of ecological low carbon.