Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods fo...Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods for the choice of mining area optimum planning schemes by use of combining technic analysis with system simulation and system optimization.The main contents are as follows: the prediction of technic and economic indexes in the developing process of existing mining areas and new mining area, including computer simulation analysis of maximum possibility of output growth in a working mine, the effect of technic progress on productive development, and grey predictive model of the change of technic and economic indexes; the dynamic simulation model of the mining area system, including five subsystem models; mining area output, investment, economic benefit, number of workers and staff of a mining area, mining area population, and ecologic environmental dynamic change under different schemes;the 0--1 programming, the goal programming and the analytic hierarchy process for contrast analysis optimization of mining area planning schemes.展开更多
蚁群算法拥有良好的全局性、自组织性、鲁棒性,但传统蚁群算法存在许多不足之处。为此,针对算法在路径规划问题中的缺陷,在传统蚁群算法的状态转移公式中,引入目标点距离因素和引导素,加快算法收敛性和改善局部最优缺陷。在带时间窗的...蚁群算法拥有良好的全局性、自组织性、鲁棒性,但传统蚁群算法存在许多不足之处。为此,针对算法在路径规划问题中的缺陷,在传统蚁群算法的状态转移公式中,引入目标点距离因素和引导素,加快算法收敛性和改善局部最优缺陷。在带时间窗的车辆路径问题(vehicle routing problem with time windows,VRPTW)上,融合蚁群算法和遗传算法,并将顾客时间窗宽度以及机器人等待时间加入蚁群算法状态转移公式中,以及将蚁群算法的解作为遗传算法的初始种群,提高遗传算法的初始解质量,然后进行编码,设置违反时间窗约束和载重量的惩罚函数和适应度函数,在传统遗传算法的交叉、变异操作后加入了破坏-修复基因的操作来优化每一代新解的质量,在Solomon Benchmark算例上进行仿真,对比算法改进前后的最优解,验证算法可行性。最后在餐厅送餐问题中把带有障碍物的仿真环境路径规划问题和VRPTW问题结合,使用改进后的算法解决餐厅环境下送餐机器人对顾客服务配送问题。展开更多
This article deals with the case of the failure-censored constant-stress partially accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The ma...This article deals with the case of the failure-censored constant-stress partially accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The maximum likelihood (ML) method is used to estimate the parameters of the CSPALT model. The performance of ML estimators is investigated via their mean square error. Also, the average confidence interval length (IL) and the associated co- verage probability (CP) are obtained. Moreover, optimum CSPALT plans that determine the optimal proportion of the test units al- located to each stress are developed. Such optimum test plans minimize the generalized asymptotic variance (GAV) of the ML estimators of the model parameters. For illustration, Monte Carlo simulation studies are given and a real life example is provided.展开更多
For planning optimum multiple stresses accelerated life test plans, a commonly followed guiding principle is that all parameters of the life-stress relationship should be estimated, and the number of the stress level ...For planning optimum multiple stresses accelerated life test plans, a commonly followed guiding principle is that all parameters of the life-stress relationship should be estimated, and the number of the stress level combinations must be no less than the number of parameters of the life-stress relationship. However, the general objective of an accelerated life test(ALT) is to assess thep-th quantile of the product life distribution under normal stress. For this objective,estimating all model parameters is not necessary, and this will increase the cost of test. Based on the theoretical conclusion that the stress level combinations of the optimum multiple stresses ALT plan locate on a straight line through the origin of coordinate, it is proposed that a design idea of planning the optimum multiple stresses ALT plan through transforming the problem of designing an optimum multiple stresses ALT plan to designing an optimum single stress ALT plan. Moreover, a method of planning the optimum multiple stresses ALT plan which can avoid estimating all model parameters is established. An example shows that, the proposed plan which only has two stress level combinations could achieve an accuracy no less than the traditional plan, and save the test time and cost on one stress level combination at least; when the actual product life is less than the design value, even the deviation of the model initial parameters value is up to 20%, the variance of the estimation of thep-th quantile of the proposed plan is still smaller than the traditional plans approximately 25%. A design method is provided for planning the optimum multiple stresses ALT which uses the statistical optimum degenerate test plan as the optimum multiple stresses accelerated life test plan.展开更多
文摘Being aimed at the vital decisive problems to be solved during.making long-term planning and overall planning of the development of coal mining areas of China, this paper presents comprehensive theories and methods for the choice of mining area optimum planning schemes by use of combining technic analysis with system simulation and system optimization.The main contents are as follows: the prediction of technic and economic indexes in the developing process of existing mining areas and new mining area, including computer simulation analysis of maximum possibility of output growth in a working mine, the effect of technic progress on productive development, and grey predictive model of the change of technic and economic indexes; the dynamic simulation model of the mining area system, including five subsystem models; mining area output, investment, economic benefit, number of workers and staff of a mining area, mining area population, and ecologic environmental dynamic change under different schemes;the 0--1 programming, the goal programming and the analytic hierarchy process for contrast analysis optimization of mining area planning schemes.
文摘蚁群算法拥有良好的全局性、自组织性、鲁棒性,但传统蚁群算法存在许多不足之处。为此,针对算法在路径规划问题中的缺陷,在传统蚁群算法的状态转移公式中,引入目标点距离因素和引导素,加快算法收敛性和改善局部最优缺陷。在带时间窗的车辆路径问题(vehicle routing problem with time windows,VRPTW)上,融合蚁群算法和遗传算法,并将顾客时间窗宽度以及机器人等待时间加入蚁群算法状态转移公式中,以及将蚁群算法的解作为遗传算法的初始种群,提高遗传算法的初始解质量,然后进行编码,设置违反时间窗约束和载重量的惩罚函数和适应度函数,在传统遗传算法的交叉、变异操作后加入了破坏-修复基因的操作来优化每一代新解的质量,在Solomon Benchmark算例上进行仿真,对比算法改进前后的最优解,验证算法可行性。最后在餐厅送餐问题中把带有障碍物的仿真环境路径规划问题和VRPTW问题结合,使用改进后的算法解决餐厅环境下送餐机器人对顾客服务配送问题。
基金supported by the King Saud University,Deanship of Scientific Research and College of Science Research Center
文摘This article deals with the case of the failure-censored constant-stress partially accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The maximum likelihood (ML) method is used to estimate the parameters of the CSPALT model. The performance of ML estimators is investigated via their mean square error. Also, the average confidence interval length (IL) and the associated co- verage probability (CP) are obtained. Moreover, optimum CSPALT plans that determine the optimal proportion of the test units al- located to each stress are developed. Such optimum test plans minimize the generalized asymptotic variance (GAV) of the ML estimators of the model parameters. For illustration, Monte Carlo simulation studies are given and a real life example is provided.
基金Supported by National Natural Science Foundation of China (Grant Nos.50935002,51075370,51105341,51275480,51305402)Zhejiang Provincial Natural Science Foundation of China (Grant No.Y1100777)+1 种基金Zhejiang Provincial Key Science and Technology Innovation Team (Grant No.2010R50005)Key Program of Science and Technology of Sichuan Provincial Education Department,China (Grant No.14ZA0005)
文摘For planning optimum multiple stresses accelerated life test plans, a commonly followed guiding principle is that all parameters of the life-stress relationship should be estimated, and the number of the stress level combinations must be no less than the number of parameters of the life-stress relationship. However, the general objective of an accelerated life test(ALT) is to assess thep-th quantile of the product life distribution under normal stress. For this objective,estimating all model parameters is not necessary, and this will increase the cost of test. Based on the theoretical conclusion that the stress level combinations of the optimum multiple stresses ALT plan locate on a straight line through the origin of coordinate, it is proposed that a design idea of planning the optimum multiple stresses ALT plan through transforming the problem of designing an optimum multiple stresses ALT plan to designing an optimum single stress ALT plan. Moreover, a method of planning the optimum multiple stresses ALT plan which can avoid estimating all model parameters is established. An example shows that, the proposed plan which only has two stress level combinations could achieve an accuracy no less than the traditional plan, and save the test time and cost on one stress level combination at least; when the actual product life is less than the design value, even the deviation of the model initial parameters value is up to 20%, the variance of the estimation of thep-th quantile of the proposed plan is still smaller than the traditional plans approximately 25%. A design method is provided for planning the optimum multiple stresses ALT which uses the statistical optimum degenerate test plan as the optimum multiple stresses accelerated life test plan.