This paper expounds the existent problems in the method and parameter of economic evaluation on construction project, which distributed by the State Planning Commission. By using technical economics principles, the au...This paper expounds the existent problems in the method and parameter of economic evaluation on construction project, which distributed by the State Planning Commission. By using technical economics principles, the author analyzes the problems and finds out the reasonable, simple, practical methods to solve the mutually exclusive schemes problems.展开更多
In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of pr...In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM + and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.展开更多
There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project(HPP)in the lower reaches of the Congo River.Based on topographic and hydrological data of the basin,the e...There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project(HPP)in the lower reaches of the Congo River.Based on topographic and hydrological data of the basin,the exploitation plan for the lower reaches of the Congo River is herein studied.The preliminary proposal involves exploitation using three-cascade hydropower stations.The Grand Inga HPP is the core of the mega hydropower base.The full supply level(FSL)of the reservoir,installed capacity,and regulation performance of the Grand Inga HPP are studied in detail.The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared,in addition to their effects on the overall development of the hydropower base.Moreover,the installed capacity is optimized based on the load characteristics.Based on simulation of cascade hydropower operation and comprehensive analysis,the project scale and implementation sequence is proposed.The influence of hydropower on socio-economic development,energy supply,and emission reduction is analyzed.Finally,the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed.展开更多
文摘This paper expounds the existent problems in the method and parameter of economic evaluation on construction project, which distributed by the State Planning Commission. By using technical economics principles, the author analyzes the problems and finds out the reasonable, simple, practical methods to solve the mutually exclusive schemes problems.
文摘In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM + and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.
基金supported by the State Grid Corporation of China Science and Technology Project(Title:Study on Method and Evaluation Principle for the Cross-Continent Power Transmission Planning)。
文摘There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project(HPP)in the lower reaches of the Congo River.Based on topographic and hydrological data of the basin,the exploitation plan for the lower reaches of the Congo River is herein studied.The preliminary proposal involves exploitation using three-cascade hydropower stations.The Grand Inga HPP is the core of the mega hydropower base.The full supply level(FSL)of the reservoir,installed capacity,and regulation performance of the Grand Inga HPP are studied in detail.The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared,in addition to their effects on the overall development of the hydropower base.Moreover,the installed capacity is optimized based on the load characteristics.Based on simulation of cascade hydropower operation and comprehensive analysis,the project scale and implementation sequence is proposed.The influence of hydropower on socio-economic development,energy supply,and emission reduction is analyzed.Finally,the optimal exploitation scheme of the mega hydropower base for the lower reaches of the Congo River is proposed.