Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their oper...Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers.展开更多
On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of ...On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,展开更多
In recent years, the use of terrestrial laser scanning (TLS) technique in engineering surveys is gaining an increasing interest due to the advantages of non-contact, rapidity, high accuracy, and large scale. Million...In recent years, the use of terrestrial laser scanning (TLS) technique in engineering surveys is gaining an increasing interest due to the advantages of non-contact, rapidity, high accuracy, and large scale. Millions of accurate 3D points (mm level accuracy) can be delivered by this technique with a high point density in a short time (up to 1 million points per second), which makes it a poten- tial technique for large scale applications in engineering environments such as tunnels, bridges, and heritage buildings. Tunnels, in particular those with long lengths, create great challenges for surveyors to obtain the satisfactory scanned data. This paper presents a short history of TLS techniques used for tunnels. A general overview of TLS techniques is given, followed by a review of several applications of TLS for tunnels. These applications are classified as: detecting geological features of drilling tun- nels, monitoring the geometry of tunnels during excavation, making deformation measurements, and extracting features. The review emphasizes how TLS techniques can be used to measure various aspects of tunnels. It is clear that TLS techniques are not yet a common tool for tunnel investigations, but there is still a huge potential to excavate.展开更多
This paper addresses the problem of accuracy characterization and measurement point planning for 3-D workpiece localization in the presence of part surface errors and measurement errors. Two frame-invariant functions ...This paper addresses the problem of accuracy characterization and measurement point planning for 3-D workpiece localization in the presence of part surface errors and measurement errors. Two frame-invariant functions of the infinitesimal rigid body displacement are defined to quantify the localization accuracy required by manufacturing processes. Then, two kinds of frame-invariant indices are derived to characterize the sensitivities of the accuracy measures to the sampling errors at the measurement points. With a dense set of discrete points on the workpiece datum surfaces pre-defined as candidates for measurement, planning of probing points for accurate recovery of part location is modeled as a combinatorial problem focusing on minimizing the accuracy sensitivity index. Based on an interchange rule, a greedy algorithm is developed to efficiently find a near-optimal solution. It is also shown that if the number of the measurement points is sufficiently large, there is no need to optimize their positions. Example confirms the validity of the presented indices and algorithm. Keywords localization - fixture - accuracy - uncertainty assessment - measurement planning - optimal design - heuristic algorithm展开更多
基金Project Supported by National Development and Reform Commission(No.[2006]2709)
文摘Thyristor valve is one of the key equipments for ultra high voltage direct current(UHVDC) power transmission projects.Before being installed on site,they need to be tested in a laboratory in order to verify their operational performance to satisfy the technical specification of project related.Test facilities for operational tests of thyristor valves are supposed to enable to undertake more severe electrical stresses than those being applied in the thyristor valves under test(test objects).On the other hand,the stresses applied into the test objects are neither higher nor lower than specified by the specification,because inappropriate stresses applied would result in incorrect evaluation of performance on the test objects,more seriously,would cuase the damage of test objects with expensive cost losing.Generally,the process of operational tests is complicated and performed in a complex synthetic test circuit(hereafter as STC),where there are a lot of sensors used for measuring,monitoring and protection on line to ensure that the test circuit functions in good condition.Therefore,the measuring systems embedded play a core role in STC,acting like "eyes".Based on the first project of building up a STC in China,experience of planning measuring systems is summarized so as to be referenced by related engineers.
文摘On May 8,2017,the Measures for Management of Land Use Master Plan was released for enforcement by the Ministry of Land and Resources.The Measures clearly points out that a land use master plan is an essential part of the national spatial planning system and an important basis for implementing land use modes control and management,
基金financially supported by Special Fund for Basic Scientific Research of Central Colleges ( No. 2013G2241019 )Shaanxi Province Science & Technology Fund ( No . 2013KW03 )Xi'an City Science & Technology Fund ( No . CX1252 ( 8 ) )
文摘In recent years, the use of terrestrial laser scanning (TLS) technique in engineering surveys is gaining an increasing interest due to the advantages of non-contact, rapidity, high accuracy, and large scale. Millions of accurate 3D points (mm level accuracy) can be delivered by this technique with a high point density in a short time (up to 1 million points per second), which makes it a poten- tial technique for large scale applications in engineering environments such as tunnels, bridges, and heritage buildings. Tunnels, in particular those with long lengths, create great challenges for surveyors to obtain the satisfactory scanned data. This paper presents a short history of TLS techniques used for tunnels. A general overview of TLS techniques is given, followed by a review of several applications of TLS for tunnels. These applications are classified as: detecting geological features of drilling tun- nels, monitoring the geometry of tunnels during excavation, making deformation measurements, and extracting features. The review emphasizes how TLS techniques can be used to measure various aspects of tunnels. It is clear that TLS techniques are not yet a common tool for tunnel investigations, but there is still a huge potential to excavate.
基金the National Natural Science Foundation of China (Grant Nos. 50205018 , 50390063)the Key Basic Research Program of Shanghai Government (Grant No. 04JCI4050) the State Key Laboratory for Manufacturing System Engineering.
文摘This paper addresses the problem of accuracy characterization and measurement point planning for 3-D workpiece localization in the presence of part surface errors and measurement errors. Two frame-invariant functions of the infinitesimal rigid body displacement are defined to quantify the localization accuracy required by manufacturing processes. Then, two kinds of frame-invariant indices are derived to characterize the sensitivities of the accuracy measures to the sampling errors at the measurement points. With a dense set of discrete points on the workpiece datum surfaces pre-defined as candidates for measurement, planning of probing points for accurate recovery of part location is modeled as a combinatorial problem focusing on minimizing the accuracy sensitivity index. Based on an interchange rule, a greedy algorithm is developed to efficiently find a near-optimal solution. It is also shown that if the number of the measurement points is sufficiently large, there is no need to optimize their positions. Example confirms the validity of the presented indices and algorithm. Keywords localization - fixture - accuracy - uncertainty assessment - measurement planning - optimal design - heuristic algorithm