期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
The China's First Exported Nuclear Power Plant Began Trial Operation in Pakistan
1
《Electricity》 2000年第2期57-57,共1页
关键词 The China’s First Exported Nuclear Power plant Began Trial operation in Pakistan
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
2
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power plant went into commercial operation
下载PDF
China’s Nuclear Power Plants in Operation
3
《Beijing Review》 2011年第14期28-29,共2页
Qinshan Plant Phase I Located in Haiyan,Zhejiang Province,Qinshan Nuclear Power Plant Phase I is t he first 300-megawatt pressurized water reactor (PWR) nuclear power plant independently designed,constructed,operated ... Qinshan Plant Phase I Located in Haiyan,Zhejiang Province,Qinshan Nuclear Power Plant Phase I is t he first 300-megawatt pressurized water reactor (PWR) nuclear power plant independently designed,constructed,operated and managed by China.The plant came into commercial operation in April 1994. 展开更多
关键词 PWR China’s Nuclear Power plants in operation
原文传递
Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
4
作者 Zheng Yonglian (Diector ,Power under Yongxia Area Management Committee ,Henan)Wang Jiawer (Yongxia Mining Area Management Committee ,Henan) 《China Coal》 1997年第S1期34-35,共2页
In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid c... In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid connection, electricity price for gridconnection, installed capacity generation setselection as well as self- protection of coalindustry. It is regarded that under marketeconomy as long as the benefits of the threesectors of coal, electricity and the local arecomprehensively considered, a suitable waycan be arrived for conl industry to operate electricity business. 展开更多
关键词 Synchronous Construction and operation of Coal Mine and Power plant in Mining Area
原文传递
Research and experiment of a novel flower transplanting device using hybrid-driven mechanism 被引量:4
5
作者 Xiong Zhao Xiaoshu Zhang +2 位作者 Qingpei Wu Li Dai Jianneng Chen 《International Journal of Agricultural and Biological Engineering》 SCIE EI CAS 2020年第2期92-100,共9页
Aiming at decreasing the component complexity and cost of flower transplanting machine,an integrated transplanting method for picking and planting flower seedlings was proposed,and a hybrid-driven five-bar parallel me... Aiming at decreasing the component complexity and cost of flower transplanting machine,an integrated transplanting method for picking and planting flower seedlings was proposed,and a hybrid-driven five-bar parallel mechanism was designed.A“beak-shaped”trajectory was designed for integrated transplanting requirements,and meantime,either the posture requirements of transplanting claw were determined.Based on the transplanting trajectory of the mechanism,a corresponding mathematical model for solving the link parameters was established,and then the five-bar mechanism was divided into two bar groups,optimization was conducted in two steps based on genetic algorithm and NSGA-II algorithm.Consequently,the optimal solution of the hybrid-driven five-bar parallel mechanism for flower seedling transplanting was obtained.Compared with similar designs,the trajectory displacement of the proposed mechanism is larger in the condition of smaller link size,which indicates that the mechanism can effectively decrease the machine size.The real-time controllable motor angular acceleration fluctuation is smaller and the commutation times are less,which has the advantage of reducing the difficulty of the mechanism control system.Subsequently,the correctness of the design method is verified by kinematics simulation.Finally,the synchronous linkage motion control methods of the two motors were designed,a transplanting experiment of the prototype was carried out,the picking success rate had reached 90%-93.4%and transplanting success rate was 80.5%-86.9%during experiment,which showed that the integrated operation of picking and planting flower seedlings can be realized by the proposed mechanism. 展开更多
关键词 hybrid-driven mechanism mechanism optimization integrated operation of picking and planting synchronous linkage motion control
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部