This study conducted temporary plugging and diversion fracturing(TPDF)experiments using a true triaxial fracturing simulation system within a laboratory setting that replicated a lab-based horizontal well completion w...This study conducted temporary plugging and diversion fracturing(TPDF)experiments using a true triaxial fracturing simulation system within a laboratory setting that replicated a lab-based horizontal well completion with multi-cluster sand jetting perforation.The effects of temporary plugging agent(TPA)particle size,TPA concentration,single-cluster perforation number and cluster number on plugging pressure,multi-fracture diversion pattern and distribution of TPAs were investigated.A combination of TPAs with small particle sizes within the fracture and large particle sizes within the segment is conducive to increasing the plugging pressure and promoting the diversion of multi-fractures.The addition of fibers can quickly achieve ultra-high pressure,but it may lead to longitudinal fractures extending along the wellbore.The temporary plugging peak pressure increases with an increase in the concentration of the TPA,reaching a peak at a certain concentration,and further increases do not significantly improve the temporary plugging peak pressure.The breaking pressure and temporary plugging peak pressure show a decreasing trend with an increase in single-cluster perforation number.A lower number of single-cluster perforations is beneficial for increasing the breaking pressure and temporary plugging peak pressure,and it has a more significant control on the propagation of multi-cluster fractures.A lower number of clusters is not conducive to increasing the total number and complexity of artificial fractures,while a higher number of clusters makes it difficult to achieve effective plugging.The TPAs within the fracture is mainly concentrated in the complex fracture areas,especially at the intersections of fractures.Meanwhile,the TPAs within the segment are primarily distributed near the perforation cluster apertures which initiated complex fractures.展开更多
The finite element method has been applied to simulate the dynamics of a water plugging string in a complex horizontal well of a low-permeability oilfield.The force associated with the pipe string and the packer has b...The finite element method has been applied to simulate the dynamics of a water plugging string in a complex horizontal well of a low-permeability oilfield.The force associated with the pipe string and the packer has been determined under the sucking action of the oil well pump.Such analysis has been conducted for a real drilling well,taking into account the process of lifting,lowering,unblocking and water plugging.Comparison between field measured data and simulation data indicates that the model is reliable and accurate.The packer creep effect under different pressure differences has also been investigated in the framework of the same model.展开更多
The coiled tubing plugging has become the main means of plugging in gas Wells in Xinjiang. These Wells are deep and have high pressure, which can easily affect the fatigue life of the operating coiled tubing. In order...The coiled tubing plugging has become the main means of plugging in gas Wells in Xinjiang. These Wells are deep and have high pressure, which can easily affect the fatigue life of the operating coiled tubing. In order to improve the life of coiled tubing in high-pressure gas Wells, this paper studies the plugging conditions of coiled tubing in high-pressure ultra-deep Wells. Firstly, the cross section deformation of coiled tubing under high internal pressure is analyzed. Secondly, the factors influencing the fatigue life of coiled tubing and the influence of surface damage on the fatigue life of coiled tubing were studied. Finally, the mechanism of furrow damage caused by coiled tubing and the main measures to reduce furrow damage are analyzed. The following suggestions are made to improve the life of coiled tubing: select the right material and the right size coiled tubing;Use appropriate measures to prevent premature coiled tubing failure and reduce operating costs.展开更多
Thermo-responsive nanocomposites have recently emerged as potential nanoplugging agents for shale stabilization in high-temperature water-based drilling fluids(WBDFs). However, their inhibitory properties have not bee...Thermo-responsive nanocomposites have recently emerged as potential nanoplugging agents for shale stabilization in high-temperature water-based drilling fluids(WBDFs). However, their inhibitory properties have not been very effective in high-temperature drilling operations. Thermo-responsive Janus nanocomposites are expected to strongly interact with clay particles from the inward hemisphere of nanomaterials, which drive the establishment of a tighter hydrophobic membrane over the shale surface at the outward hemisphere under geothermal conditions for shale stabilization. This work combines the synergistic benefits of thermo-responsive and zwitterionic nanomaterials to synchronously enhance the chemical inhibitions and plugging performances in shale under harsh conditions. A novel thermoresponsive Janus nanosilica(TRJS) exhibiting zwitterionic character was synthesized, characterized,and assessed as shale stabilizer for WBDFs at high temperatures. Compared to pristine nanosilica(Si NP)and symmetrical thermo-responsive nanosilica(TRS), TRJS exhibited anti-polyelectrolyte behaviour, in which electrolyte ions screened the electrostatic attraction between the charged particles, potentially stabilizing nanomaterial in hostile shaly environments(i.e., up to saturated brine or API brine). Macroscopically, TRJS exhibited higher chemical inhibition than Si NP and TRS in brine, prompting a better capability to control pressure penetration. TRJS adsorbed onto the clay surface via chemisorption and hydrogen bonding, and the interactions became substantial in brine, according to the results of electrophoretic mobility, surface wettability, and X-ray diffraction. Thus, contributing to the firm trapping of TRJS into the nanopore structure of the shale, triggering the formation of a tight hydrophobic membrane over the shale surface from the outward hemisphere. The addition of TRJS into WBDF had no deleterious effect on fluid properties after hot-treatment at 190℃, implying that TRJS could find potential use as a shale stabilizer in WBDFs in hostile environments.展开更多
Pipeline isolation plugging robot (PIPR) is an important tool in pipeline maintenance operation. During the plugging process, the violent vibration will occur by the flow field, which can cause serious damage to the p...Pipeline isolation plugging robot (PIPR) is an important tool in pipeline maintenance operation. During the plugging process, the violent vibration will occur by the flow field, which can cause serious damage to the pipeline and PIPR. In this paper, we propose a dynamic regulating strategy to reduce the plugging-induced vibration by regulating the spoiler angle and plugging velocity. Firstly, the dynamic plugging simulation and experiment are performed to study the flow field changes during dynamic plugging. And the pressure difference is proposed to evaluate the degree of flow field vibration. Secondly, the mathematical models of pressure difference with plugging states and spoiler angles are established based on the extreme learning machine (ELM) optimized by improved sparrow search algorithm (ISSA). Finally, a modified Q-learning algorithm based on simulated annealing is applied to determine the optimal strategy for the spoiler angle and plugging velocity in real time. The results show that the proposed method can reduce the plugging-induced vibration by 19.9% and 32.7% on average, compared with single-regulating methods. This study can effectively ensure the stability of the plugging process.展开更多
Fault fractures usually have large openings and considerable extension. Accordingly, cross-linked gel materials aregenerally considered more suitable plugging agents than water-based gels because the latter often unde...Fault fractures usually have large openings and considerable extension. Accordingly, cross-linked gel materials aregenerally considered more suitable plugging agents than water-based gels because the latter often undergo contaminationvia formation water, which prevents them from being effective over long times. Hence, in this study, aset of oil-based composite gels based on waste grease and epoxy resin has been developed. These materials havebeen observed to possess high compressive strength and resistance to the aforementioned contamination, therebyleading to notable increase in plugging success rate. The compressive strength, thickening time, and resistance toformation water pollution of these gels have been evaluated indoors. The results show that the compressivestrength of the gel can reach 11 MPa;additionally, the related gelation time can be controlled to be more than3 h, thereby providing a safe construction time;Invasion of formation water has a small effect on the gel strengthand does not shorten the thickening time. All considered performance indicators of the oil-based gel confirm itssuitability as a plugging agent for fault fractures.展开更多
Intra-stage multi-cluster temporary plugging and diverting fracturing(ITPF)is one of the fastest-growing techniques to obtain uniform reservoir stimulation in shale gas reservoirs.However,propagation geometries of mul...Intra-stage multi-cluster temporary plugging and diverting fracturing(ITPF)is one of the fastest-growing techniques to obtain uniform reservoir stimulation in shale gas reservoirs.However,propagation geometries of multiple fractures during ITPF are not clear due that the existing numerical models cannot capture the effects of perforation plugging.In this paper,a new three-dimensional FEM based on CZM was developed to investigate multiple planar fracture propagation considering perforation plugging during ITPF.Meanwhile,the fluid pipe element and its subroutine were first developed to realize the flux partitioning before or after perforation plugging.The results showed that the perforation plugging changed the original distribution of the number of perforations in each fracture,thus changing the flux partitioning after perforation plugging,which could eliminate the effect of stress interference between multiple fractures and promote a uniform fluid distribution.The standard deviation of fluid distribution in the perforation plugging case was only 8.48%of that in the non-diversion case.Furthermore,critical plugging parameters have been investigated quantitatively.Specifically,injecting more diverters will create a higher fluid pressure rise in the wellbore,which will increase the risk of wellbore integrity.Comprehensively considering pressure rise and fluid distribution,the number of diverters should be 50%of the total number of perforations(N_(pt)),whose standard deviation of fluid distribution of multiple fractures was lower than those in the cases of injecting 10%N_(pt),30%N_(pt)and 70%N_(pt).The diverters should be injected at an appropriate timing,i.e.40%or 50%of the total fracturing time(tft),whose standard deviation of the fluid distribution was only about 20%of standard deviations in the cases of injecting at20%tftor 70%tft.A single injection with all diverters can maintain high bottom-hole pressure for a longer period and promote a more uniform fluid distribution.The standard deviation of the fluid distribution in the case of a single injection was 43.62%-55.41%of the other cases with multiple injection times.This study provides a meaningful perspective and some optimal plugging parameters on the field design during IPTF.展开更多
Series of experiments were performed to simulate the invasion of formation sand into and the plugging process of gravel-pack at different viscosities and flowing rates of fluid.Two types of formation sands with the me...Series of experiments were performed to simulate the invasion of formation sand into and the plugging process of gravel-pack at different viscosities and flowing rates of fluid.Two types of formation sands with the medium size of 0.10 mm and 0.16 mm and the quartz sand and ceramsite of 0.6-1.2 mm were used in the experiments.A new viscosity-velocity index(the product of fluid viscosity and velocity)was put forward to characterize the influencing mechanism and law of physical property and flow condition of formation fluid on gravel-pack plugging,and a new method to optimize the production rate of wells controlling sand production with gravel-packing was proposed.The results show that the permeability of formation sand invaded zone and final permeability of plugged gravel-pack have negative correlations with viscosity and flow velocity of fluid,the higher the flow velocity and viscosity,the lower the permeability of formation sand invaded zone and final permeability of plugged gravel-pack will be.The flow velocity and viscosity of fluid are key factors affecting plugging degree of the gravel zone.The viscosity-velocity index(v-v index)can reflect the flow characteristics of fluid very well and make it easier to analyze the plugging mechanism of gravel zone.For different combinations of fluid viscosity and flow velocity,if the v-v index is the same or close,their impact on the final gravel permeability would be the same or close.With the increase of the v-v index,the permeability of plugged gravel zone decreases first,then the reduction rate slows down till the permeability stabilizes.By optimizing production and increasing production step by step,the optimal working scheme for sand-control well can reduce the damage to gravel-pack zone permeability caused by sand-carrying fluid effectively,and increase well productivity and extend the sand control life.展开更多
A high-quality plug of the abandoned wellbore is considered an essential technical aspect of the oil and gas well abandonment technology system. This paper presents a method of active mechanical excitation to enhance ...A high-quality plug of the abandoned wellbore is considered an essential technical aspect of the oil and gas well abandonment technology system. This paper presents a method of active mechanical excitation to enhance the quality of wellbore plug barriers. An indoor simulation platform is developed, and the effects of different combinations of vibration frequency, amplitude and duration on the properties of the wellbore plug cement material are investigated. It is observed that the optimal combination of excitation parameters occurs at a vibration frequency of 15 Hz, a vibration time of 6 min, and a vibration amplitude of 3 mm. Compared with the condition without the vibration process, the cementing strength, compressive strength, and tensile strength of wellbore cement plug with the optimal mechanical vibration process could increase by 51%, 38% and 20%, respectively, while the porosity decreases by 5%. As determined by scanning electron microscopy of the set cement's microstructure, mechanical vibration effectively eliminates internal porosity and improves the set cement's density. The optimal excitation parameters obtained from the test can guide the design of the vibration plugging tool. The designed vibration plugging tool is simulated in the near field. The cement plug cementation quality tester tests the vibrating and non-vibrating samples, and the cementation ratio is calculated. The test results show that the average cementation ratio of vibrating samples is 0.89375, and that of non-vibrating samples is 0.70625, and the cementation quality is improved by 27%. It is concluded that it not only provides essential data for the design of mechanical vibration plug apparatus, on-site vibration plugs, and the development of operational specifications for vibration plugs, but also provides solid engineering guidance.展开更多
Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experim...Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experimentally analyzed under the conditions of different carrier fluid displacements and viscosities. The results show that the greater the carrier fluid viscosity and displacement, the more difficult it is to form a plugging layer, and that the larger the size and concentration of the temporary plugging particle, the less difficult it is to form a plugging layer. When the ratio of particle size to fracture width is 0.45, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle and the viscosity of the carrier fluid, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 20 kg/m^(3)or the viscosity of the carrier fluid is greater than 3 mPa·s. When the ratio of particle size to fracture width is 0.60, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 10 kg/m^(3). When the ratio of particle size to fracture width is 0.75, the formation of the plugging layer is basically not affected by other parameters, and a stable plugging layer can form within the experimental conditions. The formation process of plugging layer includes two stages and four modes. The main controlling factors affecting the formation mode are the ratio of particle size to fracture width, carrier fluid displacement and carrier fluid viscosity.展开更多
In this paper,a viscoelasticity-plastic damage constitutive equation for naturally fractured shale is deduced,coupling nonlinear tensile-shear mixed fracture mode.Dynamic perforation-erosion on fluid re-distribution a...In this paper,a viscoelasticity-plastic damage constitutive equation for naturally fractured shale is deduced,coupling nonlinear tensile-shear mixed fracture mode.Dynamic perforation-erosion on fluid re-distribution among multi-clusters are considered as well.DFN-FEM(discrete fracture network combined with finite element method)was developed to simulate the multi-cluster complex fractures propagation within temporary plugging fracturing(TPF).Numerical results are matched with field injection and micro-seismic monitoring data.Based on geomechanical characteristics of Weiyuan deep shale gas reservoir in Sichuan Basin,SW China,a multi-cluster complex fractures propagation model is built for TPF.To study complex fractures propagation and the permeability-enhanced region evolution,intersecting and competition mechanisms between the fractures before and after TPF treatment are revealed.Simulation results show that:fracture from middle cluster is restricted by the fractures from side-clusters,and side-clusters plugging is benefit for multi fractures propagation in uniformity;optimized TPF timing should be delayed within a higher density or strike of natural fractures;Within a reservoir-featured natural fractures distribution,optimized TPF timing for most clustered method is 2/3 of total fluid injection time as the optimal plugging time under different clustering modes.展开更多
The effective plugging of artificial fractures is key to the success of temporary plugging and diverting fracturing technology,which is one of the most promising ways to improve the heat recovery efficiency of hot dry...The effective plugging of artificial fractures is key to the success of temporary plugging and diverting fracturing technology,which is one of the most promising ways to improve the heat recovery efficiency of hot dry rock.At present,how temporary plugging agents plug artificial fractures under high temperature remains unclear.In this paper,by establishing an improved experimental system for the evaluation of temporary plugging performance at high temperature,we clarified the effects of high temperature,injection rate,and fracture width on the pressure response and plugging efficiency of the fracture.The results revealed that the temporary plugging process of artificial fractures in hot dry rock can be divided into four main stages:the initial stage of temporary plugging,the bridging stage of the particles,the plugging formation stage,and the high-pressure dense plugging stage.As the temperature increases,the distribution distance of the temporary plugging agent,the number of pressure fluctuations,and the time required for crack plugging increases.Particularly,when the temperature increases by 100℃,the complete plugging time increases by 90.7%.展开更多
In this paper, to solve the problems of low water absorption and weak pressure bearing capacity of current plugging materials, acrylic acid (AA), acrylamide (AM), and sodium allyl sulfonate (SAS) are used as monomers,...In this paper, to solve the problems of low water absorption and weak pressure bearing capacity of current plugging materials, acrylic acid (AA), acrylamide (AM), and sodium allyl sulfonate (SAS) are used as monomers, and soluble starch is used as grafting. Material, the use of free radical aqueous solution method to synthesize the plugging agent SWL-1 with good water absorption and strong salt resistance. The monomer ratio is set as n (AA):n (AM):n (SAS) = 5:2:1, the experimental synthesis temperature is 70°C, and the orthogonal experiment is used to determine the experimental synthesis conditions as AA neutralization degree 80%, The amount of initiator is 0.60%, the amount of crosslinking agent is 0.50%, the ratio of monomer to starch is 7:1, and the amount of calcium carbonate is 13%. The comprehensive evaluation of the performance of the plugging agent SWL-1 shows that the water absorption performance at 60°C is the best 268.78 g/g, and the water absorption performance in 8% NaCl, 0.9% CaCl<sub>2</sub> and composite brine is 21.5 g/g, 12.5 g/g and 24.9 g/g, indicating good resistance to sodium and calcium, the water retention rate is still higher than 30% after 15 days at 160°C. The sand bed plugging test found that the maximum pressure of SWL-1 was 7 MPa, and the crack plugging test found that when the crack width was 1 mm, 2 mm, and 3 mm, the maximum compressive strength of SWL-1 was 10 MPa. The acid solubility test showed that the maximum pressure was 10 MPa. The highest rate is 86.38%.展开更多
After steam discharge in heavy oil reservoirs,the distribution of temperature,pressure,and permeability in different wells becomes irregular.Flow channels can easily be produced,which affect the sweep efficiency of th...After steam discharge in heavy oil reservoirs,the distribution of temperature,pressure,and permeability in different wells becomes irregular.Flow channels can easily be produced,which affect the sweep efficiency of the oil displacement.Previous studies have shown that the salting-out plugging method can effectively block these channels in high-temperature reservoirs,improve the suction profile,and increase oil production.In the present study,the optimal dosage of the plugging agent is determined taking into account connection transmissibility and inter-well volumes.Together with the connectivity model,a water flooding simulation model is introduced.Moreover,a non-gradient stochastic disturbance algorithm is used to obtain the optimal plugging agent dosage,which provides the basis for the high-temperature salting-out plugging agent adjustment in the field.展开更多
As an independent sand control unit or a common protective shell of a high-quality screen,the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and g...As an independent sand control unit or a common protective shell of a high-quality screen,the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and gas well.However,most screens only consider the influence of the internal sand retaining medium parameters in the sand control performance design while ignoring the influence of the plugging of the punching screen on the overall sand retaining performance of the screen.To explore the clogging mechanism of the punching screen,this paper established the clogging mechanism calculation model of a single punching screen sand control unit by using the computational fluid mechanics-discrete element method(CFD-DEM)combined method.According to the combined motion of particles and fluids,the influence of the internal flow state on particle motion and accumulation was analyzed.The results showed that(1)the clogging process of the punching sand control unit is divided into three stages:initial clogging,aggravation of clogging and stability of clogging.In the initial stage of blockage,coarse particles form a loose bridge structure,and blockage often occurs preferentially at the streamline gathering place below chamfering inside the sand control unit.In the stage of blockage intensification,the particle mass develops into a relatively complete sand bridge,which develops from both ends of the opening to the center of the opening.In the stable plugging stage,the sand deposits show a“fan shape”and form a“V-shaped”gully inside the punching slot element.(2)Under a certain reservoir particle-size distribution,The slit length and opening height have a large influence on the permeability and blockage rate,while the slit width size has little influence on the permeability and blockage rate.The microscopic clogging mechanism and its law of the punching screen prevention unit are proposed in this study,which has some field guidance significance for the design of punching screen and sand prevention selection.展开更多
At high cycles of steam huff&puff,oil distribution in reservoirs becomes stronger heterogeneity due to steam channeling.Thermal solidification agent can be used to solve this problem.Its solution is a lowviscosity...At high cycles of steam huff&puff,oil distribution in reservoirs becomes stronger heterogeneity due to steam channeling.Thermal solidification agent can be used to solve this problem.Its solution is a lowviscosity liquid at normal temperature,but it can be solidified above 80℃.The plugging degree is up to 99%at 250℃.The sweep efficiency reaches 59.2%,which is 7.3%higher than pure steam injection.In addition,simultaneous injection of viscosity reducer and/or nitrogen foams can further enhance oil recovery.The mechanism of this technology depends on its strong plugging ability,which changes the flowing pattern of steam to effectively mobilize remaining oil.Viscosity reducer and nitrogen foams further expand the sweep range and extends the effective period.Therefore,thermal solidification agent can plug steam channeling paths and adjust steam flowing direction to significantly enhance oil recovery at high cycles of steam huff&puff.展开更多
Due to the uneven seabed and heaving of soil during pumping,incomplete soil plugs may occur during the installation of bucket foundations,and the impacts on the bearing capacities of bucket foundations need to be eval...Due to the uneven seabed and heaving of soil during pumping,incomplete soil plugs may occur during the installation of bucket foundations,and the impacts on the bearing capacities of bucket foundations need to be evaluated.In this paper,the contact ratio(the ratio of the top diameter of the soil plug to the diameter of the bucket)and the soil plug ratio(the ratio of the soil heave height to the skirt height)are defined to describe the shape and size of the incomplete soil plug.Then,finite element models are established to investigate the bearing capacities of bucket foundations with incomplete soil plugs and the influences of the contact ratios,and the soil plug ratios on the bearing capacities are analyzed.The results show that the vertical bearing capacity of bucket foundations in homogeneous soil continuously improves with the increase of the contact ratio.However,in normally consolidated soil,the vertical bearing capacity barely changes when the contact ratio is smaller than 0.75,while the bearing capacity suddenly increases when the contact ratio increases to 1 due to the change of failure mode.The contact ratio hardly affects the horizontal bearing capacity of bucket foundations.Moreover,the moment bearing capacity improves with the increase of the contact ratio for small aspect ratios,but hardly varies with increasing contact ratio for aspect ratios larger than 0.5.Consequently,the reduction coefficient method is proposed based on this analysis to calculate the bearing capacities of bucket foundations considering the influence of incomplete soil plugs.The comparison results show that the proposed reduction coefficient method can be used to evaluate the influences of incomplete soil plug on the bearing capacities of bucket foundations.展开更多
Conformance control and water plugging are a widely used EOR method in mature oilfields.However,majority of conformance control and water plugging agents are unavoidable dehydrated situation in high-temperature and hi...Conformance control and water plugging are a widely used EOR method in mature oilfields.However,majority of conformance control and water plugging agents are unavoidable dehydrated situation in high-temperature and high-salinity low permeability reservoirs.Consequently,a novel conformance control system HPF-Co gel,based on high-temperature stabilizer(CoCl_(2)·H_(2)O,CCH)is developed.The HPF-Co bulk gel has better performances with high temperature(120℃)and high salinity(1×10^(5)mg/L).According to Sydansk coding system,the gel strength of HPF-Co with CCH is increased to code G.The dehydration rate of HPF-Co gel is 32.0%after aging for 150 d at 120℃,showing excellent thermal stability.The rheological properties of HPF gel and HPF-Co gel are also studied.The results show that the storage modulus(G′)of HPF-Co gel is always greater than that of HPF gel.The effect of CCH on the microstructure of the gel is studied.The results show that the HPF-Co gel with CCH has a denser gel network,and the diameter of the three-dimensional network skeleton is 1.5-3.5μm.After 90 d of aging,HPF-Co gel still has a good three-dimensional structure.Infrared spectroscopy results show that CCH forms coordination bonds with N and O atoms in the gel amide group,which can suppress the vibration of cross-linked sites and improve the stability at high temperature.Fractured core plugging test determines the optimized polymer gel injection strategy and injection velocity with HPF-Co bulk gel system,plugging rate exceeding 98%.Moreover,the results of subsequent waterflooding recovery can be improved by 17%.展开更多
Plugging agent treatment and acid stimulation have completely different mechanisms for improving injection profiles. In this paper, a hybrid procedure is introduced to reduce the damage of the plugging agent to low a...Plugging agent treatment and acid stimulation have completely different mechanisms for improving injection profiles. In this paper, a hybrid procedure is introduced to reduce the damage of the plugging agent to low and medium permeability zones and the penetration radius of acid into high permeability zones. The procedure is: First inject plugging agent to block high permeability zones, and then inject acid to remove plugging agent damage from the low and medium permeability zones and stimulate them. To perform this procedure successfully, three kinds of plugging agents, namely strong strength plugging agent for the wells with fractures or high permeability streaks, weak gel for those with thick layer in which serious heterogeneity exists, temporary plugging agent for those in which the absorption ability of high permeability zones needs maintaining, were screened out for use in different reservoirs. Several acid systems were evaluated to be compatible with the three kinds of plugging agents. The objectives of this paper are:(1)To show the screen results about the compatible plugging agent and acid; 2 To show how to optimize the operation process;(3)To tell some experience gained ( ) from the oilfield applications of this technique. From Jan. 2001 to Dec. 2002, 46 operations using this procedure were carried out in Weicheng and Mazhai Oilfields of SINOPEC. Results show that the average benefit/cost ratio is over 3.5. Experience acquired from these applications was summarized in the paper.展开更多
Plugging and abandonment(P&A)is a crucial step of the well life cycle.Regardless of how long one stretches the productive life of a well,P&A operations will have to be carried out eventually.The current panora...Plugging and abandonment(P&A)is a crucial step of the well life cycle.Regardless of how long one stretches the productive life of a well,P&A operations will have to be carried out eventually.The current panorama of our industry includes many wells to be plugged and abandoned,with steep requirements to abide by both regulations and societal pressure.In this context,we must guarantee that no leakage occurs with an eternal perspective in mind.Cement has been the prime material for this task,but recent studies have indicated the potential of degradation over time-especially in corrosive environments-and the creation of leaking paths due to its shrinkage.This has opened up a path toward the usage of alternative materials.One of the emerging candidates is bismuth,a metal with the unique characteristic of expanding when solidified.Such a trait could improve the overall sealability of wellbores and especially during P&A.This article discusses the current status of bismuth sealing technologies,introducing the basics of bismuth,the ongoing efforts to qualify it as a barrier material,its potential applications,and the challenges that still need to be overcome.The latest research indicates promising results in terms of its usage as a barrier element.展开更多
基金Supported by the National Natural Science Foundation of China(51974332).
文摘This study conducted temporary plugging and diversion fracturing(TPDF)experiments using a true triaxial fracturing simulation system within a laboratory setting that replicated a lab-based horizontal well completion with multi-cluster sand jetting perforation.The effects of temporary plugging agent(TPA)particle size,TPA concentration,single-cluster perforation number and cluster number on plugging pressure,multi-fracture diversion pattern and distribution of TPAs were investigated.A combination of TPAs with small particle sizes within the fracture and large particle sizes within the segment is conducive to increasing the plugging pressure and promoting the diversion of multi-fractures.The addition of fibers can quickly achieve ultra-high pressure,but it may lead to longitudinal fractures extending along the wellbore.The temporary plugging peak pressure increases with an increase in the concentration of the TPA,reaching a peak at a certain concentration,and further increases do not significantly improve the temporary plugging peak pressure.The breaking pressure and temporary plugging peak pressure show a decreasing trend with an increase in single-cluster perforation number.A lower number of single-cluster perforations is beneficial for increasing the breaking pressure and temporary plugging peak pressure,and it has a more significant control on the propagation of multi-cluster fractures.A lower number of clusters is not conducive to increasing the total number and complexity of artificial fractures,while a higher number of clusters makes it difficult to achieve effective plugging.The TPAs within the fracture is mainly concentrated in the complex fracture areas,especially at the intersections of fractures.Meanwhile,the TPAs within the segment are primarily distributed near the perforation cluster apertures which initiated complex fractures.
文摘The finite element method has been applied to simulate the dynamics of a water plugging string in a complex horizontal well of a low-permeability oilfield.The force associated with the pipe string and the packer has been determined under the sucking action of the oil well pump.Such analysis has been conducted for a real drilling well,taking into account the process of lifting,lowering,unblocking and water plugging.Comparison between field measured data and simulation data indicates that the model is reliable and accurate.The packer creep effect under different pressure differences has also been investigated in the framework of the same model.
文摘The coiled tubing plugging has become the main means of plugging in gas Wells in Xinjiang. These Wells are deep and have high pressure, which can easily affect the fatigue life of the operating coiled tubing. In order to improve the life of coiled tubing in high-pressure gas Wells, this paper studies the plugging conditions of coiled tubing in high-pressure ultra-deep Wells. Firstly, the cross section deformation of coiled tubing under high internal pressure is analyzed. Secondly, the factors influencing the fatigue life of coiled tubing and the influence of surface damage on the fatigue life of coiled tubing were studied. Finally, the mechanism of furrow damage caused by coiled tubing and the main measures to reduce furrow damage are analyzed. The following suggestions are made to improve the life of coiled tubing: select the right material and the right size coiled tubing;Use appropriate measures to prevent premature coiled tubing failure and reduce operating costs.
基金financially supported by the National Natural Science Foundation of China(Grant No.52150410427)the Key Support Program for Foreign Experts of the Ministry of Science and Technology of the People's Republic of China(No.wgxz2022057)funding for post-doctoral work by the Department of Human Resources and Social Security of Hubei Province。
文摘Thermo-responsive nanocomposites have recently emerged as potential nanoplugging agents for shale stabilization in high-temperature water-based drilling fluids(WBDFs). However, their inhibitory properties have not been very effective in high-temperature drilling operations. Thermo-responsive Janus nanocomposites are expected to strongly interact with clay particles from the inward hemisphere of nanomaterials, which drive the establishment of a tighter hydrophobic membrane over the shale surface at the outward hemisphere under geothermal conditions for shale stabilization. This work combines the synergistic benefits of thermo-responsive and zwitterionic nanomaterials to synchronously enhance the chemical inhibitions and plugging performances in shale under harsh conditions. A novel thermoresponsive Janus nanosilica(TRJS) exhibiting zwitterionic character was synthesized, characterized,and assessed as shale stabilizer for WBDFs at high temperatures. Compared to pristine nanosilica(Si NP)and symmetrical thermo-responsive nanosilica(TRS), TRJS exhibited anti-polyelectrolyte behaviour, in which electrolyte ions screened the electrostatic attraction between the charged particles, potentially stabilizing nanomaterial in hostile shaly environments(i.e., up to saturated brine or API brine). Macroscopically, TRJS exhibited higher chemical inhibition than Si NP and TRS in brine, prompting a better capability to control pressure penetration. TRJS adsorbed onto the clay surface via chemisorption and hydrogen bonding, and the interactions became substantial in brine, according to the results of electrophoretic mobility, surface wettability, and X-ray diffraction. Thus, contributing to the firm trapping of TRJS into the nanopore structure of the shale, triggering the formation of a tight hydrophobic membrane over the shale surface from the outward hemisphere. The addition of TRJS into WBDF had no deleterious effect on fluid properties after hot-treatment at 190℃, implying that TRJS could find potential use as a shale stabilizer in WBDFs in hostile environments.
基金This work was financially supported by the National Natural Science Foundation of China(Grant No.51575528)the Science Foundation of China University of Petroleum,Beijing(No.2462022QEDX011).
文摘Pipeline isolation plugging robot (PIPR) is an important tool in pipeline maintenance operation. During the plugging process, the violent vibration will occur by the flow field, which can cause serious damage to the pipeline and PIPR. In this paper, we propose a dynamic regulating strategy to reduce the plugging-induced vibration by regulating the spoiler angle and plugging velocity. Firstly, the dynamic plugging simulation and experiment are performed to study the flow field changes during dynamic plugging. And the pressure difference is proposed to evaluate the degree of flow field vibration. Secondly, the mathematical models of pressure difference with plugging states and spoiler angles are established based on the extreme learning machine (ELM) optimized by improved sparrow search algorithm (ISSA). Finally, a modified Q-learning algorithm based on simulated annealing is applied to determine the optimal strategy for the spoiler angle and plugging velocity in real time. The results show that the proposed method can reduce the plugging-induced vibration by 19.9% and 32.7% on average, compared with single-regulating methods. This study can effectively ensure the stability of the plugging process.
基金“Research and Application of Key Techniques for Drilling and Completion of Bozhong 19-6 Condensate Gas Field Development-Phase I”sub topic 4“Research on Leakage Prevention and Plugging Techniques for Fault and Buried Hill Reservoirs”,a Project of China National Offshore Oil (China)Co.,Ltd. (Project No.YXKY-2020-TJ-03).
文摘Fault fractures usually have large openings and considerable extension. Accordingly, cross-linked gel materials aregenerally considered more suitable plugging agents than water-based gels because the latter often undergo contaminationvia formation water, which prevents them from being effective over long times. Hence, in this study, aset of oil-based composite gels based on waste grease and epoxy resin has been developed. These materials havebeen observed to possess high compressive strength and resistance to the aforementioned contamination, therebyleading to notable increase in plugging success rate. The compressive strength, thickening time, and resistance toformation water pollution of these gels have been evaluated indoors. The results show that the compressivestrength of the gel can reach 11 MPa;additionally, the related gelation time can be controlled to be more than3 h, thereby providing a safe construction time;Invasion of formation water has a small effect on the gel strengthand does not shorten the thickening time. All considered performance indicators of the oil-based gel confirm itssuitability as a plugging agent for fault fractures.
基金financially supported by the National Natural Science Foundation of China(No.52174045,No.52104011)Natural Science Foundation of Xinjiang Uygur Autonomous Region(2022D01B77)。
文摘Intra-stage multi-cluster temporary plugging and diverting fracturing(ITPF)is one of the fastest-growing techniques to obtain uniform reservoir stimulation in shale gas reservoirs.However,propagation geometries of multiple fractures during ITPF are not clear due that the existing numerical models cannot capture the effects of perforation plugging.In this paper,a new three-dimensional FEM based on CZM was developed to investigate multiple planar fracture propagation considering perforation plugging during ITPF.Meanwhile,the fluid pipe element and its subroutine were first developed to realize the flux partitioning before or after perforation plugging.The results showed that the perforation plugging changed the original distribution of the number of perforations in each fracture,thus changing the flux partitioning after perforation plugging,which could eliminate the effect of stress interference between multiple fractures and promote a uniform fluid distribution.The standard deviation of fluid distribution in the perforation plugging case was only 8.48%of that in the non-diversion case.Furthermore,critical plugging parameters have been investigated quantitatively.Specifically,injecting more diverters will create a higher fluid pressure rise in the wellbore,which will increase the risk of wellbore integrity.Comprehensively considering pressure rise and fluid distribution,the number of diverters should be 50%of the total number of perforations(N_(pt)),whose standard deviation of fluid distribution of multiple fractures was lower than those in the cases of injecting 10%N_(pt),30%N_(pt)and 70%N_(pt).The diverters should be injected at an appropriate timing,i.e.40%or 50%of the total fracturing time(tft),whose standard deviation of the fluid distribution was only about 20%of standard deviations in the cases of injecting at20%tftor 70%tft.A single injection with all diverters can maintain high bottom-hole pressure for a longer period and promote a more uniform fluid distribution.The standard deviation of the fluid distribution in the case of a single injection was 43.62%-55.41%of the other cases with multiple injection times.This study provides a meaningful perspective and some optimal plugging parameters on the field design during IPTF.
基金Supported by the National Natural Science Foundation of China(51774307).
文摘Series of experiments were performed to simulate the invasion of formation sand into and the plugging process of gravel-pack at different viscosities and flowing rates of fluid.Two types of formation sands with the medium size of 0.10 mm and 0.16 mm and the quartz sand and ceramsite of 0.6-1.2 mm were used in the experiments.A new viscosity-velocity index(the product of fluid viscosity and velocity)was put forward to characterize the influencing mechanism and law of physical property and flow condition of formation fluid on gravel-pack plugging,and a new method to optimize the production rate of wells controlling sand production with gravel-packing was proposed.The results show that the permeability of formation sand invaded zone and final permeability of plugged gravel-pack have negative correlations with viscosity and flow velocity of fluid,the higher the flow velocity and viscosity,the lower the permeability of formation sand invaded zone and final permeability of plugged gravel-pack will be.The flow velocity and viscosity of fluid are key factors affecting plugging degree of the gravel zone.The viscosity-velocity index(v-v index)can reflect the flow characteristics of fluid very well and make it easier to analyze the plugging mechanism of gravel zone.For different combinations of fluid viscosity and flow velocity,if the v-v index is the same or close,their impact on the final gravel permeability would be the same or close.With the increase of the v-v index,the permeability of plugged gravel zone decreases first,then the reduction rate slows down till the permeability stabilizes.By optimizing production and increasing production step by step,the optimal working scheme for sand-control well can reduce the damage to gravel-pack zone permeability caused by sand-carrying fluid effectively,and increase well productivity and extend the sand control life.
基金The authors wish to acknowledge the Open Foundation of Cooperative Innovation Center of Unconventional Oil and Gas,Yangtze University(Ministry of Education&Hubei Province),(Item No.UOGBX2022-04,UOG2022-26,UOGBX2022-05)the National Natural Science Foundation of China"New method and control mechanism of surface rotary steering drilling"(Item No.51974035,U1262108,U1762214)the key R&D program of Hubei Province"Development and application of multi-dimensional power integrated drilling tools for intelligent drilling"(Item No.2020BAB055)for the financial support to this paper。
文摘A high-quality plug of the abandoned wellbore is considered an essential technical aspect of the oil and gas well abandonment technology system. This paper presents a method of active mechanical excitation to enhance the quality of wellbore plug barriers. An indoor simulation platform is developed, and the effects of different combinations of vibration frequency, amplitude and duration on the properties of the wellbore plug cement material are investigated. It is observed that the optimal combination of excitation parameters occurs at a vibration frequency of 15 Hz, a vibration time of 6 min, and a vibration amplitude of 3 mm. Compared with the condition without the vibration process, the cementing strength, compressive strength, and tensile strength of wellbore cement plug with the optimal mechanical vibration process could increase by 51%, 38% and 20%, respectively, while the porosity decreases by 5%. As determined by scanning electron microscopy of the set cement's microstructure, mechanical vibration effectively eliminates internal porosity and improves the set cement's density. The optimal excitation parameters obtained from the test can guide the design of the vibration plugging tool. The designed vibration plugging tool is simulated in the near field. The cement plug cementation quality tester tests the vibrating and non-vibrating samples, and the cementation ratio is calculated. The test results show that the average cementation ratio of vibrating samples is 0.89375, and that of non-vibrating samples is 0.70625, and the cementation quality is improved by 27%. It is concluded that it not only provides essential data for the design of mechanical vibration plug apparatus, on-site vibration plugs, and the development of operational specifications for vibration plugs, but also provides solid engineering guidance.
基金Supported by National Natural Science Foundation of China (U21A20105)Science and Technology Innovation Fund of PetroChina (2020D-5007-0208)。
文摘Using the visualized experimental device of temporary plugging in hydraulic fractures, the plugging behaviors of temporary plugging particles with different sizes and concentrations in hydraulic fractures were experimentally analyzed under the conditions of different carrier fluid displacements and viscosities. The results show that the greater the carrier fluid viscosity and displacement, the more difficult it is to form a plugging layer, and that the larger the size and concentration of the temporary plugging particle, the less difficult it is to form a plugging layer. When the ratio of particle size to fracture width is 0.45, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle and the viscosity of the carrier fluid, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 20 kg/m^(3)or the viscosity of the carrier fluid is greater than 3 mPa·s. When the ratio of particle size to fracture width is 0.60, the formation of the plugging layer is mainly controlled by the mass concentration of the temporary plugging particle, and a stable plugging layer cannot form if the mass concentration of the temporary plugging particle is less than 10 kg/m^(3). When the ratio of particle size to fracture width is 0.75, the formation of the plugging layer is basically not affected by other parameters, and a stable plugging layer can form within the experimental conditions. The formation process of plugging layer includes two stages and four modes. The main controlling factors affecting the formation mode are the ratio of particle size to fracture width, carrier fluid displacement and carrier fluid viscosity.
基金Supported by the National Natural Science Foundation of China(52192622,52204005,U20A20265)Sichuan Outstanding Young Scientific and Technological Talents Project(2022JDJQ0007).
文摘In this paper,a viscoelasticity-plastic damage constitutive equation for naturally fractured shale is deduced,coupling nonlinear tensile-shear mixed fracture mode.Dynamic perforation-erosion on fluid re-distribution among multi-clusters are considered as well.DFN-FEM(discrete fracture network combined with finite element method)was developed to simulate the multi-cluster complex fractures propagation within temporary plugging fracturing(TPF).Numerical results are matched with field injection and micro-seismic monitoring data.Based on geomechanical characteristics of Weiyuan deep shale gas reservoir in Sichuan Basin,SW China,a multi-cluster complex fractures propagation model is built for TPF.To study complex fractures propagation and the permeability-enhanced region evolution,intersecting and competition mechanisms between the fractures before and after TPF treatment are revealed.Simulation results show that:fracture from middle cluster is restricted by the fractures from side-clusters,and side-clusters plugging is benefit for multi fractures propagation in uniformity;optimized TPF timing should be delayed within a higher density or strike of natural fractures;Within a reservoir-featured natural fractures distribution,optimized TPF timing for most clustered method is 2/3 of total fluid injection time as the optimal plugging time under different clustering modes.
基金supported financially by the Beijing Natural Science Foundation Project(No.3222030)the National Natural Science Foundation of China(No.51936001,No.52274002 and No.52192622)+1 种基金the PetroChina Science and Technology Innovation Foundation Project(2021DQ02–0201)Award Cultivation Foundation from Beijing Institute of Petrochemical Technology(No.BIPTACF-002).
文摘The effective plugging of artificial fractures is key to the success of temporary plugging and diverting fracturing technology,which is one of the most promising ways to improve the heat recovery efficiency of hot dry rock.At present,how temporary plugging agents plug artificial fractures under high temperature remains unclear.In this paper,by establishing an improved experimental system for the evaluation of temporary plugging performance at high temperature,we clarified the effects of high temperature,injection rate,and fracture width on the pressure response and plugging efficiency of the fracture.The results revealed that the temporary plugging process of artificial fractures in hot dry rock can be divided into four main stages:the initial stage of temporary plugging,the bridging stage of the particles,the plugging formation stage,and the high-pressure dense plugging stage.As the temperature increases,the distribution distance of the temporary plugging agent,the number of pressure fluctuations,and the time required for crack plugging increases.Particularly,when the temperature increases by 100℃,the complete plugging time increases by 90.7%.
文摘In this paper, to solve the problems of low water absorption and weak pressure bearing capacity of current plugging materials, acrylic acid (AA), acrylamide (AM), and sodium allyl sulfonate (SAS) are used as monomers, and soluble starch is used as grafting. Material, the use of free radical aqueous solution method to synthesize the plugging agent SWL-1 with good water absorption and strong salt resistance. The monomer ratio is set as n (AA):n (AM):n (SAS) = 5:2:1, the experimental synthesis temperature is 70°C, and the orthogonal experiment is used to determine the experimental synthesis conditions as AA neutralization degree 80%, The amount of initiator is 0.60%, the amount of crosslinking agent is 0.50%, the ratio of monomer to starch is 7:1, and the amount of calcium carbonate is 13%. The comprehensive evaluation of the performance of the plugging agent SWL-1 shows that the water absorption performance at 60°C is the best 268.78 g/g, and the water absorption performance in 8% NaCl, 0.9% CaCl<sub>2</sub> and composite brine is 21.5 g/g, 12.5 g/g and 24.9 g/g, indicating good resistance to sodium and calcium, the water retention rate is still higher than 30% after 15 days at 160°C. The sand bed plugging test found that the maximum pressure of SWL-1 was 7 MPa, and the crack plugging test found that when the crack width was 1 mm, 2 mm, and 3 mm, the maximum compressive strength of SWL-1 was 10 MPa. The acid solubility test showed that the maximum pressure was 10 MPa. The highest rate is 86.38%.
基金supported by China Postdoctoral Science Foundation(No.2021M702304)Shandong Provincial Natural Science Foundation Youth Fund(No.ZR2021QE260).
文摘After steam discharge in heavy oil reservoirs,the distribution of temperature,pressure,and permeability in different wells becomes irregular.Flow channels can easily be produced,which affect the sweep efficiency of the oil displacement.Previous studies have shown that the salting-out plugging method can effectively block these channels in high-temperature reservoirs,improve the suction profile,and increase oil production.In the present study,the optimal dosage of the plugging agent is determined taking into account connection transmissibility and inter-well volumes.Together with the connectivity model,a water flooding simulation model is introduced.Moreover,a non-gradient stochastic disturbance algorithm is used to obtain the optimal plugging agent dosage,which provides the basis for the high-temperature salting-out plugging agent adjustment in the field.
文摘As an independent sand control unit or a common protective shell of a high-quality screen,the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and gas well.However,most screens only consider the influence of the internal sand retaining medium parameters in the sand control performance design while ignoring the influence of the plugging of the punching screen on the overall sand retaining performance of the screen.To explore the clogging mechanism of the punching screen,this paper established the clogging mechanism calculation model of a single punching screen sand control unit by using the computational fluid mechanics-discrete element method(CFD-DEM)combined method.According to the combined motion of particles and fluids,the influence of the internal flow state on particle motion and accumulation was analyzed.The results showed that(1)the clogging process of the punching sand control unit is divided into three stages:initial clogging,aggravation of clogging and stability of clogging.In the initial stage of blockage,coarse particles form a loose bridge structure,and blockage often occurs preferentially at the streamline gathering place below chamfering inside the sand control unit.In the stage of blockage intensification,the particle mass develops into a relatively complete sand bridge,which develops from both ends of the opening to the center of the opening.In the stable plugging stage,the sand deposits show a“fan shape”and form a“V-shaped”gully inside the punching slot element.(2)Under a certain reservoir particle-size distribution,The slit length and opening height have a large influence on the permeability and blockage rate,while the slit width size has little influence on the permeability and blockage rate.The microscopic clogging mechanism and its law of the punching screen prevention unit are proposed in this study,which has some field guidance significance for the design of punching screen and sand prevention selection.
基金supported by National Natural Science Foundation of China(52074321)Natural Science Foundation of Beijing Municipality,China(3192026)。
文摘At high cycles of steam huff&puff,oil distribution in reservoirs becomes stronger heterogeneity due to steam channeling.Thermal solidification agent can be used to solve this problem.Its solution is a lowviscosity liquid at normal temperature,but it can be solidified above 80℃.The plugging degree is up to 99%at 250℃.The sweep efficiency reaches 59.2%,which is 7.3%higher than pure steam injection.In addition,simultaneous injection of viscosity reducer and/or nitrogen foams can further enhance oil recovery.The mechanism of this technology depends on its strong plugging ability,which changes the flowing pattern of steam to effectively mobilize remaining oil.Viscosity reducer and nitrogen foams further expand the sweep range and extends the effective period.Therefore,thermal solidification agent can plug steam channeling paths and adjust steam flowing direction to significantly enhance oil recovery at high cycles of steam huff&puff.
基金financially supported by the National Science Fund for Distinguished Young Scholars of China(Grant No.51825904)the Research on the Form,Design Method and Weathering Resistance of Key Components of Novel Floating Support Structures for Offshore Photovoltaics(Grant No.2022YFB4200701).
文摘Due to the uneven seabed and heaving of soil during pumping,incomplete soil plugs may occur during the installation of bucket foundations,and the impacts on the bearing capacities of bucket foundations need to be evaluated.In this paper,the contact ratio(the ratio of the top diameter of the soil plug to the diameter of the bucket)and the soil plug ratio(the ratio of the soil heave height to the skirt height)are defined to describe the shape and size of the incomplete soil plug.Then,finite element models are established to investigate the bearing capacities of bucket foundations with incomplete soil plugs and the influences of the contact ratios,and the soil plug ratios on the bearing capacities are analyzed.The results show that the vertical bearing capacity of bucket foundations in homogeneous soil continuously improves with the increase of the contact ratio.However,in normally consolidated soil,the vertical bearing capacity barely changes when the contact ratio is smaller than 0.75,while the bearing capacity suddenly increases when the contact ratio increases to 1 due to the change of failure mode.The contact ratio hardly affects the horizontal bearing capacity of bucket foundations.Moreover,the moment bearing capacity improves with the increase of the contact ratio for small aspect ratios,but hardly varies with increasing contact ratio for aspect ratios larger than 0.5.Consequently,the reduction coefficient method is proposed based on this analysis to calculate the bearing capacities of bucket foundations considering the influence of incomplete soil plugs.The comparison results show that the proposed reduction coefficient method can be used to evaluate the influences of incomplete soil plug on the bearing capacities of bucket foundations.
基金This work has been Sponsored by CNPC Innovation Found(Grant No.2021DQ02-0202)Besides,the authors gratefully appreciate the financial support of the Science Foundation of China University of Petroleum,Beijing(Grant No.2462020XKBH013)Financial supports from the National Natural Science Foundation of China(Grant No.52174046)is also significantly acknowledged.
文摘Conformance control and water plugging are a widely used EOR method in mature oilfields.However,majority of conformance control and water plugging agents are unavoidable dehydrated situation in high-temperature and high-salinity low permeability reservoirs.Consequently,a novel conformance control system HPF-Co gel,based on high-temperature stabilizer(CoCl_(2)·H_(2)O,CCH)is developed.The HPF-Co bulk gel has better performances with high temperature(120℃)and high salinity(1×10^(5)mg/L).According to Sydansk coding system,the gel strength of HPF-Co with CCH is increased to code G.The dehydration rate of HPF-Co gel is 32.0%after aging for 150 d at 120℃,showing excellent thermal stability.The rheological properties of HPF gel and HPF-Co gel are also studied.The results show that the storage modulus(G′)of HPF-Co gel is always greater than that of HPF gel.The effect of CCH on the microstructure of the gel is studied.The results show that the HPF-Co gel with CCH has a denser gel network,and the diameter of the three-dimensional network skeleton is 1.5-3.5μm.After 90 d of aging,HPF-Co gel still has a good three-dimensional structure.Infrared spectroscopy results show that CCH forms coordination bonds with N and O atoms in the gel amide group,which can suppress the vibration of cross-linked sites and improve the stability at high temperature.Fractured core plugging test determines the optimized polymer gel injection strategy and injection velocity with HPF-Co bulk gel system,plugging rate exceeding 98%.Moreover,the results of subsequent waterflooding recovery can be improved by 17%.
文摘Plugging agent treatment and acid stimulation have completely different mechanisms for improving injection profiles. In this paper, a hybrid procedure is introduced to reduce the damage of the plugging agent to low and medium permeability zones and the penetration radius of acid into high permeability zones. The procedure is: First inject plugging agent to block high permeability zones, and then inject acid to remove plugging agent damage from the low and medium permeability zones and stimulate them. To perform this procedure successfully, three kinds of plugging agents, namely strong strength plugging agent for the wells with fractures or high permeability streaks, weak gel for those with thick layer in which serious heterogeneity exists, temporary plugging agent for those in which the absorption ability of high permeability zones needs maintaining, were screened out for use in different reservoirs. Several acid systems were evaluated to be compatible with the three kinds of plugging agents. The objectives of this paper are:(1)To show the screen results about the compatible plugging agent and acid; 2 To show how to optimize the operation process;(3)To tell some experience gained ( ) from the oilfield applications of this technique. From Jan. 2001 to Dec. 2002, 46 operations using this procedure were carried out in Weicheng and Mazhai Oilfields of SINOPEC. Results show that the average benefit/cost ratio is over 3.5. Experience acquired from these applications was summarized in the paper.
基金funded by the Research Council of Norway.The authors acknowledge the Research Council of Norway(RCN)for financing the Center for Research-based Innovations“SWIPA-Center for Subsurface Well Integrity,Plugging and Abandonment”,RCN project no.309646,for which the work has been carried out.The center is also financed by the operating companies AkerBP,Equinor ASA,and Wintershall Dea Norway,and includes in addition more than 20 in-kind contributing industry partners.The R&D partners in SWIPA are SINTEF,NORCE,IFE,NTNU,and UiS.
文摘Plugging and abandonment(P&A)is a crucial step of the well life cycle.Regardless of how long one stretches the productive life of a well,P&A operations will have to be carried out eventually.The current panorama of our industry includes many wells to be plugged and abandoned,with steep requirements to abide by both regulations and societal pressure.In this context,we must guarantee that no leakage occurs with an eternal perspective in mind.Cement has been the prime material for this task,but recent studies have indicated the potential of degradation over time-especially in corrosive environments-and the creation of leaking paths due to its shrinkage.This has opened up a path toward the usage of alternative materials.One of the emerging candidates is bismuth,a metal with the unique characteristic of expanding when solidified.Such a trait could improve the overall sealability of wellbores and especially during P&A.This article discusses the current status of bismuth sealing technologies,introducing the basics of bismuth,the ongoing efforts to qualify it as a barrier material,its potential applications,and the challenges that still need to be overcome.The latest research indicates promising results in terms of its usage as a barrier element.