To validate the design rationality of the power coupler for the RFQ cavity and minimize cavity contamination,we designed a low-loss offline conditioning cavity and conducted high-power testing.This offline cavity feat...To validate the design rationality of the power coupler for the RFQ cavity and minimize cavity contamination,we designed a low-loss offline conditioning cavity and conducted high-power testing.This offline cavity features two coupling ports and two tuners,operating at a frequency of 162.5 MHz with a tuning range of 3.2 MHz.Adjusting the installation angle of the coupling ring and the insertion depth of the tuner helps minimize cavity losses.We performed electromagnetic structural and multiphysics simulations,revealing a minimal theoretical power loss of 4.3%.However,when the cavity frequency varied by110 kHz,theoretical power losses increased to10%,necessitating constant tuner adjustments during conditioning.Multiphysics simulations indicated that increased cavity temperature did not affect frequency variation.Upon completion of the offline high-power conditioning platform,we measured the transmission performance,revealing a power loss of 6.3%,exceeding the theoretical calculation.Conditioning utilized efficient automatic range scanning and standing wave resonant methods.To fully condition the power coupler,a 15°phase difference between two standing wave points in the condition-ing system was necessary.Notably,the maximum continuous wave power surpassed 20 kW,exceeding the expected target.展开更多
The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input...The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input power up to approximately 7 kW.The first batch of 20 sets of 1.3 GHz coupler prototypes was fabricated from three domestic manufacturers for the SHINE project.To better characterize the radio frequency conditioning phenomena for validating the performance of power couplers,a room temperature test stand was designed,constructed,and commissioned for the SHINE 1.3 GHz power couplers.In addition,a horizontal test cryostat was built to test the 1.3 GHz superconducting cavities,fundamental power couplers,tuners,and other components as a set.The results of these tests indicate that the 1.3 GHz couplers are capable of handling up to 14 kW continuous waves.Herein,the main aspects of the radio frequency design and construction of the test stand,along with the test results of the high-power conditioning of the 1.3 GHz couplers,are described.展开更多
The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free El...The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free Electron Laser(E-XFEL)project,the 3.9 GHz cryomodules in the SHINE project will operate in the continuous wave regime with higher radio frequency average power for both cavities and couplers.We propose a 3.9 GHz fundamental power coupler with an adjustable antenna length,for satisfying the SHINE project requirements.Here,we describe the 3.9 GHz fundamental power coupler's design considerations and power requirements for various operating modes of the SHINE Linac.We also present the results of the radio frequency simulation and optimization,including the studies on multipacting and thermal analysis of the proposed 3.9 GHz coupler.展开更多
In this study,a phenomenological model of the radio frequency(RF)behavior of a superconducting cavity fundamental power coupler is proposed by analyzing the simulation results of a transient beam-loading process in an...In this study,a phenomenological model of the radio frequency(RF)behavior of a superconducting cavity fundamental power coupler is proposed by analyzing the simulation results of a transient beam-loading process in an extremely overcoupled superconducting cavity.Using this phenomenological model,the calculation of the transient reflected power from a superconducting cavity under beam loading can be mathematically simplified to algebraic operations without solving the differential equation governing the transient beam-loading process,while maintaining the calculation accuracy.Moreover,this phenomenological model can facilitate an intuitive understanding of the significant surge in the time evolution of reflected power from a superconducting cavity in certain beam-loading processes.The validity of this phenomenological model was carefully examined in various beam-loading processes and cavity conditions,and the method based on this phenomenological model was utilized in the transient RF analysis of the superconducting cavity system of the CAFe Linac,achieving satisfactory results.展开更多
5-cell elliptical cavities have been selected for the main linac of the China Accelerator Driven subcritical System (C-ADS) in the medium energy section. According to the design, each cavity should be driven with ra...5-cell elliptical cavities have been selected for the main linac of the China Accelerator Driven subcritical System (C-ADS) in the medium energy section. According to the design, each cavity should be driven with radio frequency (RF) energy up to 150 kW by a fundamental power coupler (FPC). As the cavities work with high quality factor and high accelerating gradient, the coupler should keep the cavity from contamination in the assembly procedure. To fulfil the requirements, a single-window coaxial type coupler was designed with the capabilities of handling high RF power, class 10 clean room assembly, and heat load control. This paper presents the coupler design and gives details of RF design, heat load optimization and thermal analysis as well as multipacting simulations. In addition, a primary high power test has been performed and is described in this paper.展开更多
The advance of Inducive Power Transfer (IPT) system is capable to transfer large power across an air gap of sufficient distance, but the power level and charging area of receiver are limited by the magnetic coupler of...The advance of Inducive Power Transfer (IPT) system is capable to transfer large power across an air gap of sufficient distance, but the power level and charging area of receiver are limited by the magnetic coupler of IPT system. This paper analyses the correlative factors which effect maximum output power (Pm), it reveals Pm is inversely proportional with magnetic flux of power receiving coils. New ferrite array structure is proposed as the basic part of magnetic coupler that focusing on enhancing the equilibrium of magnetic flux distribution at charging area and increasing power transfer distance. The method of winding on ferrite array is quite flexible and the power transmission distance can be increased by changing the mode of ferrite array windings while magnetic field uniform is reduced, users can chose the suitable mode of winding for different IPT system. Finally the validity of theory analysis is tested by a 3D finite element modeling tool.展开更多
The performance of the optical fiber coupler prepared with fused biconical taper method is determined by the quality of fused stretching. Besides, the stable high-temperature heat source is the essential guarantee for...The performance of the optical fiber coupler prepared with fused biconical taper method is determined by the quality of fused stretching. Besides, the stable high-temperature heat source is the essential guarantee for fused stretching process to go smoothly. The way of using AC (alternating current) arc as the heat source is proposed in this article. In addition, the paper also introduces high-frequency high-voltage power supply with the characteristics of constant current and restricted voltage, which is composed of preceding voltage regulation part and following inverter.展开更多
基金supported by the Chinese initiative accelerator driven subcritical system and the hundred talents plan of the Chinese Academy of Sciences(No.E129841Y).
文摘To validate the design rationality of the power coupler for the RFQ cavity and minimize cavity contamination,we designed a low-loss offline conditioning cavity and conducted high-power testing.This offline cavity features two coupling ports and two tuners,operating at a frequency of 162.5 MHz with a tuning range of 3.2 MHz.Adjusting the installation angle of the coupling ring and the insertion depth of the tuner helps minimize cavity losses.We performed electromagnetic structural and multiphysics simulations,revealing a minimal theoretical power loss of 4.3%.However,when the cavity frequency varied by110 kHz,theoretical power losses increased to10%,necessitating constant tuner adjustments during conditioning.Multiphysics simulations indicated that increased cavity temperature did not affect frequency variation.Upon completion of the offline high-power conditioning platform,we measured the transmission performance,revealing a power loss of 6.3%,exceeding the theoretical calculation.Conditioning utilized efficient automatic range scanning and standing wave resonant methods.To fully condition the power coupler,a 15°phase difference between two standing wave points in the condition-ing system was necessary.Notably,the maximum continuous wave power surpassed 20 kW,exceeding the expected target.
基金supported by Shanghai Municipal Science and Technology Major Project(No.2017SHZDZX02)。
文摘The Shanghai High Repetition Rate XFEL and Extreme Light Facility(SHINE)project will use 6001.3 GHz fundamental power couplers,which are modified based on TTF-Ⅲ power couplers,for continuous-wave operation with input power up to approximately 7 kW.The first batch of 20 sets of 1.3 GHz coupler prototypes was fabricated from three domestic manufacturers for the SHINE project.To better characterize the radio frequency conditioning phenomena for validating the performance of power couplers,a room temperature test stand was designed,constructed,and commissioned for the SHINE 1.3 GHz power couplers.In addition,a horizontal test cryostat was built to test the 1.3 GHz superconducting cavities,fundamental power couplers,tuners,and other components as a set.The results of these tests indicate that the 1.3 GHz couplers are capable of handling up to 14 kW continuous waves.Herein,the main aspects of the radio frequency design and construction of the test stand,along with the test results of the high-power conditioning of the 1.3 GHz couplers,are described.
基金supported by Shanghai Municipal Science and Technology Major Project(No.2017SHZDZX02)。
文摘The third harmonic superconducting cryomodule is being designed for the Shanghai High repetition rate XFEL and Extreme light facility(SHINE)project,which is under construction.In contrast to the European X-ray Free Electron Laser(E-XFEL)project,the 3.9 GHz cryomodules in the SHINE project will operate in the continuous wave regime with higher radio frequency average power for both cavities and couplers.We propose a 3.9 GHz fundamental power coupler with an adjustable antenna length,for satisfying the SHINE project requirements.Here,we describe the 3.9 GHz fundamental power coupler's design considerations and power requirements for various operating modes of the SHINE Linac.We also present the results of the radio frequency simulation and optimization,including the studies on multipacting and thermal analysis of the proposed 3.9 GHz coupler.
基金supported by the CAS“Light of West China”Program (No.29Y936020)National Natural Science Foundation of China (No.12105331)Strategic Priority Research Program of the Chinese Academy of Sciences (No.XDB34010102)。
文摘In this study,a phenomenological model of the radio frequency(RF)behavior of a superconducting cavity fundamental power coupler is proposed by analyzing the simulation results of a transient beam-loading process in an extremely overcoupled superconducting cavity.Using this phenomenological model,the calculation of the transient reflected power from a superconducting cavity under beam loading can be mathematically simplified to algebraic operations without solving the differential equation governing the transient beam-loading process,while maintaining the calculation accuracy.Moreover,this phenomenological model can facilitate an intuitive understanding of the significant surge in the time evolution of reflected power from a superconducting cavity in certain beam-loading processes.The validity of this phenomenological model was carefully examined in various beam-loading processes and cavity conditions,and the method based on this phenomenological model was utilized in the transient RF analysis of the superconducting cavity system of the CAFe Linac,achieving satisfactory results.
基金Supported by China ADS Project(XDA03020000)National Natural Science Foundation of China(11475203)
文摘5-cell elliptical cavities have been selected for the main linac of the China Accelerator Driven subcritical System (C-ADS) in the medium energy section. According to the design, each cavity should be driven with radio frequency (RF) energy up to 150 kW by a fundamental power coupler (FPC). As the cavities work with high quality factor and high accelerating gradient, the coupler should keep the cavity from contamination in the assembly procedure. To fulfil the requirements, a single-window coaxial type coupler was designed with the capabilities of handling high RF power, class 10 clean room assembly, and heat load control. This paper presents the coupler design and gives details of RF design, heat load optimization and thermal analysis as well as multipacting simulations. In addition, a primary high power test has been performed and is described in this paper.
文摘The advance of Inducive Power Transfer (IPT) system is capable to transfer large power across an air gap of sufficient distance, but the power level and charging area of receiver are limited by the magnetic coupler of IPT system. This paper analyses the correlative factors which effect maximum output power (Pm), it reveals Pm is inversely proportional with magnetic flux of power receiving coils. New ferrite array structure is proposed as the basic part of magnetic coupler that focusing on enhancing the equilibrium of magnetic flux distribution at charging area and increasing power transfer distance. The method of winding on ferrite array is quite flexible and the power transmission distance can be increased by changing the mode of ferrite array windings while magnetic field uniform is reduced, users can chose the suitable mode of winding for different IPT system. Finally the validity of theory analysis is tested by a 3D finite element modeling tool.
文摘The performance of the optical fiber coupler prepared with fused biconical taper method is determined by the quality of fused stretching. Besides, the stable high-temperature heat source is the essential guarantee for fused stretching process to go smoothly. The way of using AC (alternating current) arc as the heat source is proposed in this article. In addition, the paper also introduces high-frequency high-voltage power supply with the characteristics of constant current and restricted voltage, which is composed of preceding voltage regulation part and following inverter.