高效率、高可靠性LED驱动器IC领域的业界领导者Power Integrations公司今日推出LYTSwitch?-6系列安全隔离型LED驱动器IC,为智能照明应用再添新选择。新IC可提供65 W无闪烁输出,效率可高达94%,并且待机功率低至15 m W,同时提供支持两级...高效率、高可靠性LED驱动器IC领域的业界领导者Power Integrations公司今日推出LYTSwitch?-6系列安全隔离型LED驱动器IC,为智能照明应用再添新选择。新IC可提供65 W无闪烁输出,效率可高达94%,并且待机功率低至15 m W,同时提供支持两级或单级PFC的配置选项。LYTSwitch-6 IC针对家用和商用照明以及薄型天花板凹槽灯应用而设计。展开更多
Denmark’ goal of being independent of fossil energy sources in 2050 puts forward great demands on all energy subsystems (electricity, heat, gas and transport, etc.) to be operated in a holistic manner. The Danish exp...Denmark’ goal of being independent of fossil energy sources in 2050 puts forward great demands on all energy subsystems (electricity, heat, gas and transport, etc.) to be operated in a holistic manner. The Danish experience and challenges of wind power integration and the development of district heating systems are summarized in this paper. How to optimally use the cross-sectoral flexibility by intelligent control (model predictive control-based) of the key coupling components in an integrated heat and power system including electrical heat pumps in the demand side, and thermal storage applications in buildings is investigated.展开更多
Power Integration公司的LinkSwitch-TNZ系列组合了功率转换和无损耗AC零交叉信号,用于系统时钟和计时功能.采用高度集成的LinkSwitch-TNZ系列比分立器件实现更加灵活,节省元件数量40%或更多.每个器件集成了725V功率MOSFET,振荡器,用于...Power Integration公司的LinkSwitch-TNZ系列组合了功率转换和无损耗AC零交叉信号,用于系统时钟和计时功能.采用高度集成的LinkSwitch-TNZ系列比分立器件实现更加灵活,节省元件数量40%或更多.每个器件集成了725V功率MOSFET,振荡器,用于自偏压的高昂压电流源,频率抖动,快速(逐个周期)电流限制,滞后的热关断,输出和输入过压保护电路.LinkSwitch-TNZ集成电路待机时的功耗小于100mA,能满足世界各地无负载和待机调节要求.MOSFET限流模式可通过BYPASS引脚电容数值来选择.大电流限制提供最大限度连续输出电流而采用非常低成本和小面积表面贴装电感.器件具有全套保护特性.展开更多
This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(...This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(ASEAN)Power Grid.This study focuses on modeling and evaluating the dynamic performance of the interconnected system,considering the high penetration of renewable sources.Power flow,small signal stability,and transient stability analyses were conducted to assess the ability of the proposed linked power system models to withstand small and large disturbances,utilizing the Power Systems Analysis Toolbox(PSAT)software in MATLAB.All components used in the model are documented in the PSAT library.Currently,there is a lack of publicly available studies regarding the implementation of this specific system.Additionally,the study investigates the behavior of a system with a high penetration of renewable energy sources.Based on the findings,this study concludes that a system is generally stable when interconnection is realized,given its appropriate location and dynamic component parameters.Furthermore,the critical eigenvalues of the system also exhibited improvement as the renewable energy sources were augmented.展开更多
An approach to smoothing the fluctuations of largescale wind power is investigated using vehicle-to-grid(V2G)systems.First,an energy management and optimization system is designed and modeled.By using the wavelet pack...An approach to smoothing the fluctuations of largescale wind power is investigated using vehicle-to-grid(V2G)systems.First,an energy management and optimization system is designed and modeled.By using the wavelet packet decomposition method,the target grid-connected wind power,the required electric vehicle(EV)power,and supercapacitor power are determined.The energy management model for EVs is then developed by introducing a knapsack problem that can evaluate the needs of an EV fleet.Furthermore,an optimized dispatch strategy for EVs and wind power is developed by using a dynamic programming method.A case study demonstrates that the energy management and optimization method for V2G systems achieves noticeable performance improvements over benchmark techniques.展开更多
Power integration based on 4 H-SiC is a very promising technology for high-frequency and high-temperature power electronics applications. However, the fabrication processes used in Si BiCMOS technology is not applicab...Power integration based on 4 H-SiC is a very promising technology for high-frequency and high-temperature power electronics applications. However, the fabrication processes used in Si BiCMOS technology is not applicable in 4 H-SiC at present, and few studies on the monolithic power integration of the SiC signal devices and power devices have been reported. In this paper, we propose a novel lateral BJT structure, which is suitable for monolithically integrating with the vertical power BJT on the same epitaxial wafer at the cost of one additional mask. The signal BJT’s static and dynamic characteristics are comprehensively investigated by TCAD simulation.Simulation results show that the common-emitter current gains of the 4 H-SiC signal BJT are 133 and 52 at room temperature and 300 ℃, respectively. Its implementation in an inverter shows that its switching time is about200 ns.展开更多
In this paper,high-power LED with many integrated chips is used as thermal resistance analysis research object, and we do thermal resistance testing technology research on it. We put forward the thermocouple point con...In this paper,high-power LED with many integrated chips is used as thermal resistance analysis research object, and we do thermal resistance testing technology research on it. We put forward the thermocouple point contact test method. According to the principle that LED forward voltage changes with temperature,LED heat sink to surface temperature distribution is studied directly in the test,and then we analyze the thermal resistance of high-power LED with many integrated chips when its secondary packaging is introduced. This method makes the measurement of thermal resistance of LED more rapid and convenient. It provides an effective assessment method for the analysis of high power LED device design and engineering application.展开更多
With abundant wind resources and high pressure imposed on en-vironmental protection, wind power development has a promising future. Butdue to intermittent nature, wind power can bring into full play only if being con-...With abundant wind resources and high pressure imposed on en-vironmental protection, wind power development has a promising future. Butdue to intermittent nature, wind power can bring into full play only if being con-nected into power grid to ensure its supply reliability and continuity, aswell as operational economy. However, technical and market barriers haveprevented wind power from integrating into power grid. To foster wind powerdevelopment, these barriers should be removed by both government incentivepolicies and sophisticated technologies.展开更多
High performance can be obtained for the integrated power electronics module(IPEM) by using a three-dimensional packaging structure instead of a planar structure. A three- dimensional packaged half bridge-IPEM (HB-...High performance can be obtained for the integrated power electronics module(IPEM) by using a three-dimensional packaging structure instead of a planar structure. A three- dimensional packaged half bridge-IPEM (HB-IPEM), consisting of two chip scale packaged MOSFETs and the corresponding gate driver and protection circuits, is fabricated at the laboratory. The reliability of the IPEM is controlled from the shape design of solder joints and the control of assembly process parameters. The parasitic parameters are extracted using Agilent 4395A impedance analyzer for building the parasitic parameter model of the HB- IPEM. A 12 V/3 A output synchronous rectifier Buck converter using the HB-IPEM is built to test the electrical performance of the HB-IPEM. Low voltage spikes on two MOSFETs illustrate that the three-dimensional package of the HB-IPEM can decrease parasitic inductance. Temperature distribution simulation results of the HB-IPEM using FLOTHERM are given. Heat dissipation of the solder joints makes the peak junction temperature of the chip drop obviously. The package realizes three-dimensional heat dissipation and has better thermal management.展开更多
The installed capacity of a large scale wind power plant will be up to a number of hundreds MW, and the wind power is transmitted to load centers through long distance transmission lines with 220 kV, 500 kV, or 750 kV...The installed capacity of a large scale wind power plant will be up to a number of hundreds MW, and the wind power is transmitted to load centers through long distance transmission lines with 220 kV, 500 kV, or 750 kV. Therefore, it is necessary not only considering the power transmission line between a wind power plant and the first connection node of the power network, but also the power network among the group of those wind power plants in a wind power base, the integration network from the base to the existed grids, as well as the distribution and consumption of the wind power generation by loads. Meanwhile, the impact of wind power stochastic fluctuation on power systems must be studied. In recent years, wind power prediction technology has been studied by the utilities and wind power plants. As a matter of fact, some European countries have used this prediction technology as a tool in national power dispatch centers and wind power companies.展开更多
This paper proposes a method to evaluate the reliability of power system with different capacities of wind power while considering carbon tax. The proposed method is a hybrid approach which combines Frequency and Dura...This paper proposes a method to evaluate the reliability of power system with different capacities of wind power while considering carbon tax. The proposed method is a hybrid approach which combines Frequency and Duration (F&D) method and Monte Carlo Simulation (MCS) method. MCS method is used to achieve a model to simulate the random status of power system. Also, the proposed method is applied on the IEEE 14-bus test system to investigate the effects of integrating different capacities of wind energy to the reliability of power system with considering carbon tax.展开更多
In this paper the author describes the current development of tbe 10-GW wind power base in Jiuquan, Gansu Province. The.future planning of the wind power base and the relevant power grid are also introduced based on t...In this paper the author describes the current development of tbe 10-GW wind power base in Jiuquan, Gansu Province. The.future planning of the wind power base and the relevant power grid are also introduced based on the assessment on the wind resources and the wind power operation with the grid.展开更多
Electric power is widely used as the main energy source of ship integrated power system(SIPS), which contains power network and electric power network. SIPS network reconfiguration is a non-linear large-scale problem....Electric power is widely used as the main energy source of ship integrated power system(SIPS), which contains power network and electric power network. SIPS network reconfiguration is a non-linear large-scale problem. The reconfiguration solution influences the safety and stable operation of the power system. According to the operational characteristics of SIPS, a simplified model of power network and a mathematical model for network reconfiguration are established. Based on these models, a multi-agent and ant colony optimization(MAACO) is proposed to solve the problem of network reconfiguration. The simulations are carried out to demonstrate that the optimization method can reconstruct the integrated power system network accurately and efficiently.展开更多
基金Danish Agency for Science, Technology and Innovation (No. 6144-00037)Danish InnovationFunding (No. 5185-00005A)
文摘Denmark’ goal of being independent of fossil energy sources in 2050 puts forward great demands on all energy subsystems (electricity, heat, gas and transport, etc.) to be operated in a holistic manner. The Danish experience and challenges of wind power integration and the development of district heating systems are summarized in this paper. How to optimally use the cross-sectoral flexibility by intelligent control (model predictive control-based) of the key coupling components in an integrated heat and power system including electrical heat pumps in the demand side, and thermal storage applications in buildings is investigated.
文摘This study presents a comprehensive impact analysis of the rotor angle stability of a proposed international connection between the Philippines and Sabah,Malaysia,as part of the Association of Southeast Asian Nations(ASEAN)Power Grid.This study focuses on modeling and evaluating the dynamic performance of the interconnected system,considering the high penetration of renewable sources.Power flow,small signal stability,and transient stability analyses were conducted to assess the ability of the proposed linked power system models to withstand small and large disturbances,utilizing the Power Systems Analysis Toolbox(PSAT)software in MATLAB.All components used in the model are documented in the PSAT library.Currently,there is a lack of publicly available studies regarding the implementation of this specific system.Additionally,the study investigates the behavior of a system with a high penetration of renewable energy sources.Based on the findings,this study concludes that a system is generally stable when interconnection is realized,given its appropriate location and dynamic component parameters.Furthermore,the critical eigenvalues of the system also exhibited improvement as the renewable energy sources were augmented.
文摘An approach to smoothing the fluctuations of largescale wind power is investigated using vehicle-to-grid(V2G)systems.First,an energy management and optimization system is designed and modeled.By using the wavelet packet decomposition method,the target grid-connected wind power,the required electric vehicle(EV)power,and supercapacitor power are determined.The energy management model for EVs is then developed by introducing a knapsack problem that can evaluate the needs of an EV fleet.Furthermore,an optimized dispatch strategy for EVs and wind power is developed by using a dynamic programming method.A case study demonstrates that the energy management and optimization method for V2G systems achieves noticeable performance improvements over benchmark techniques.
基金Project supported by the National Natural Science Foundation of China(No.51577054)
文摘Power integration based on 4 H-SiC is a very promising technology for high-frequency and high-temperature power electronics applications. However, the fabrication processes used in Si BiCMOS technology is not applicable in 4 H-SiC at present, and few studies on the monolithic power integration of the SiC signal devices and power devices have been reported. In this paper, we propose a novel lateral BJT structure, which is suitable for monolithically integrating with the vertical power BJT on the same epitaxial wafer at the cost of one additional mask. The signal BJT’s static and dynamic characteristics are comprehensively investigated by TCAD simulation.Simulation results show that the common-emitter current gains of the 4 H-SiC signal BJT are 133 and 52 at room temperature and 300 ℃, respectively. Its implementation in an inverter shows that its switching time is about200 ns.
基金Sponsored by the Heilongjiang Provincial Project(Grant No.12511121)the Harbin City Innovation Talent Project(Grant No.2011RFXXG019)the National Science and Technology Support Project(Grant No.2012BAH28F02)
文摘In this paper,high-power LED with many integrated chips is used as thermal resistance analysis research object, and we do thermal resistance testing technology research on it. We put forward the thermocouple point contact test method. According to the principle that LED forward voltage changes with temperature,LED heat sink to surface temperature distribution is studied directly in the test,and then we analyze the thermal resistance of high-power LED with many integrated chips when its secondary packaging is introduced. This method makes the measurement of thermal resistance of LED more rapid and convenient. It provides an effective assessment method for the analysis of high power LED device design and engineering application.
文摘With abundant wind resources and high pressure imposed on en-vironmental protection, wind power development has a promising future. Butdue to intermittent nature, wind power can bring into full play only if being con-nected into power grid to ensure its supply reliability and continuity, aswell as operational economy. However, technical and market barriers haveprevented wind power from integrating into power grid. To foster wind powerdevelopment, these barriers should be removed by both government incentivepolicies and sophisticated technologies.
基金Fok Ying Tung Education Foundation(No.91058)the Natural Science Foundation of High Education Institutions of Jiangsu Province(No.08KJD470004)Qing Lan Project of Jiangsu Province of 2008
文摘High performance can be obtained for the integrated power electronics module(IPEM) by using a three-dimensional packaging structure instead of a planar structure. A three- dimensional packaged half bridge-IPEM (HB-IPEM), consisting of two chip scale packaged MOSFETs and the corresponding gate driver and protection circuits, is fabricated at the laboratory. The reliability of the IPEM is controlled from the shape design of solder joints and the control of assembly process parameters. The parasitic parameters are extracted using Agilent 4395A impedance analyzer for building the parasitic parameter model of the HB- IPEM. A 12 V/3 A output synchronous rectifier Buck converter using the HB-IPEM is built to test the electrical performance of the HB-IPEM. Low voltage spikes on two MOSFETs illustrate that the three-dimensional package of the HB-IPEM can decrease parasitic inductance. Temperature distribution simulation results of the HB-IPEM using FLOTHERM are given. Heat dissipation of the solder joints makes the peak junction temperature of the chip drop obviously. The package realizes three-dimensional heat dissipation and has better thermal management.
文摘The installed capacity of a large scale wind power plant will be up to a number of hundreds MW, and the wind power is transmitted to load centers through long distance transmission lines with 220 kV, 500 kV, or 750 kV. Therefore, it is necessary not only considering the power transmission line between a wind power plant and the first connection node of the power network, but also the power network among the group of those wind power plants in a wind power base, the integration network from the base to the existed grids, as well as the distribution and consumption of the wind power generation by loads. Meanwhile, the impact of wind power stochastic fluctuation on power systems must be studied. In recent years, wind power prediction technology has been studied by the utilities and wind power plants. As a matter of fact, some European countries have used this prediction technology as a tool in national power dispatch centers and wind power companies.
文摘This paper proposes a method to evaluate the reliability of power system with different capacities of wind power while considering carbon tax. The proposed method is a hybrid approach which combines Frequency and Duration (F&D) method and Monte Carlo Simulation (MCS) method. MCS method is used to achieve a model to simulate the random status of power system. Also, the proposed method is applied on the IEEE 14-bus test system to investigate the effects of integrating different capacities of wind energy to the reliability of power system with considering carbon tax.
文摘In this paper the author describes the current development of tbe 10-GW wind power base in Jiuquan, Gansu Province. The.future planning of the wind power base and the relevant power grid are also introduced based on the assessment on the wind resources and the wind power operation with the grid.
基金supported by the National Natural Science Foundation of China (4177402141974005)。
文摘Electric power is widely used as the main energy source of ship integrated power system(SIPS), which contains power network and electric power network. SIPS network reconfiguration is a non-linear large-scale problem. The reconfiguration solution influences the safety and stable operation of the power system. According to the operational characteristics of SIPS, a simplified model of power network and a mathematical model for network reconfiguration are established. Based on these models, a multi-agent and ant colony optimization(MAACO) is proposed to solve the problem of network reconfiguration. The simulations are carried out to demonstrate that the optimization method can reconstruct the integrated power system network accurately and efficiently.