期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Practicality of power load management system in Chongqing City verified
1
《Electricity》 1996年第3期45-45,共1页
Began from early 1992, Chongqing Power Supply Bureau had spent 3 and half years to build up a power load management system consisting of I master station, 6 relay stations, 1280 terminals and the distributed monitorin... Began from early 1992, Chongqing Power Supply Bureau had spent 3 and half years to build up a power load management system consisting of I master station, 6 relay stations, 1280 terminals and the distributed monitoring device. This system distributes in the hilly and mountainous areas where geographically complicated and the load widely scatters, it can supervise about 72% load and curtail more than 15% load 展开更多
关键词 load Practicality of power load management system in Chongqing City verified
下载PDF
Study on green power supply modes for heavy load in Remote Areas
2
作者 Yu Li Yixi Cuomu +4 位作者 Yiming Gao Guoqin Lv Weiwei Lin Sirui Li Changchun Zhou 《Global Energy Interconnection》 EI CSCD 2024年第4期475-485,共11页
In this study,the present situation and characteristics of power supply in remote areas are summarized.By studying the cases of power supply projects in remote areas,the experience is analyzed and described,and the ap... In this study,the present situation and characteristics of power supply in remote areas are summarized.By studying the cases of power supply projects in remote areas,the experience is analyzed and described,and the applicability of related technologies,such as grid-forming storage and power load management,is studied,including grid-connection technologies,such as grid-forming converters and power load management.On this basis,three power-supply modes were proposed.The application scenarios and advantages of the three modes were compared and analyzed.Based on the local development situation,the temporal sequences of the three schemes are described,and a case study was conducted.The study of the heavy-load power supply mode in remote areas contributes to solving the problem of heavy-load green power consumption in remote areas and promoting the further development of renewable energy. 展开更多
关键词 Remote area Renewable energy Grid-forming storage power load management power supply mode
下载PDF
Animal Behavior in a Fully Automatically Controlled Dairy Farm
3
作者 Anja Graiff Renate Luise Dorfler +2 位作者 Manfred Hold Jorn Stumpenhausen Heinz Bernhardt 《Journal of Agricultural Science and Technology(A)》 2015年第1期61-67,共7页
As there are increasing numbers of small farms in Germany, it is necessary for them, to keep the workload as small as possible by enhancing the use of automatism. Important as those energetic-technical capabilities an... As there are increasing numbers of small farms in Germany, it is necessary for them, to keep the workload as small as possible by enhancing the use of automatism. Important as those energetic-technical capabilities and features in a modem dairy farm are, the final decision when using automatic machinery depends on the animal itself and its behavior. As a result, all animal-physiological criteria, animal protection and animal welfare have to be taken into consideration. Therefore tests have been done to investigate dairy cattle behavior on suddenly occurring energy failures, fluctuations or postponements due to a load management. The experiments have been taken in four different stables. In each stable, 12 "focus cows" have been selected. Their daily stress response was measured by a heart rate monitor and faecal cortisol metabolites. Video observation showed modifications in behavior, escape or avoidance reactions; pedometers recorded the movement activity. These scientific experiments will demonstrate cattle behavior in situations driven by a power load management, but no statistically significant effects on the usual daily routine are being expected. 展开更多
关键词 Cattle behavior CORTISOL heart rate variability power load management smart grid Germany.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部