In view of that the average electricity consumption per capita is still rather low in China, this paper putsforward ten focal problems in the 10th Five-year Power Plan, including optimized allocation of power sources ...In view of that the average electricity consumption per capita is still rather low in China, this paper putsforward ten focal problems in the 10th Five-year Power Plan, including optimized allocation of power sources and powernetworks, environmental protection in coal-fired power plants, as well as localization of power equipment, etc.展开更多
The countermeasures are the actions that should be taken, after the occurrence of a nuclear accident to protect the public against the associated risks. These actions may be represented by sheltering, evacuation, dist...The countermeasures are the actions that should be taken, after the occurrence of a nuclear accident to protect the public against the associated risks. These actions may be represented by sheltering, evacuation, distribution of stable iodine tablets and/or relocation. This study represents a comprehensive probabilistic study to investigate the role of the adoption of the countermeasures in case of a hypothetical accident of type LOCA for nuclear power plant of PWR (1000 Mw). The effective doses in different organs, short and long health effects, and the associated risks are calculated with and without countermeasures. In addition, the overall costs of the accident and the costs of countermeasures are estimated which represent our first trials to know how much the proposed accident cost. The results showed that, the area around the site requires early and late countermeasures action after the accident especially in the downwind sectors. For late countermeasures, the duration time of relocation ranged from about two to 10 years. The adoption of the countermeasures increases the costs of emergency plan by 40% but reduces the risk associated the accident.展开更多
Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulatio...Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.展开更多
a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-di...a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-digit figures,展开更多
Wind power has an increasing share of the Brazilian energy market and may represent 11.6% of total capacity by 2024. For large hydro-thermal systems having high-storage capacity, a complementarity between hydro and wi...Wind power has an increasing share of the Brazilian energy market and may represent 11.6% of total capacity by 2024. For large hydro-thermal systems having high-storage capacity, a complementarity between hydro and wind production could have important effects. The current optimization models are applied to dispatch power plants to meet the market demand and optimize the generation dispatches considering only hydroelectric and thermal power plants. The remaining sources, including wind power, small-hydroelectric plants and biomass plants, are excluded from the optimization model and are included deterministically. This work introduces a general methodology to represent the stochastic behavior of wind production aimed at the planning and operation of large interconnected power systems. In fact, considering the generation of the wind power source stochastically could show the complementarity between the hydro and wind power production, reducing the energy price in the spot market with the reduction of thermal power dispatches. In addition to that, with a reduction in wind power and a simultaneous dry-season occurrence, this model, is able to show the need of thermal power plants dispatches as well as the reduction of the risk of energy shortages.展开更多
Transmission network expansion planning (TNEP) is a challenging issue especially in new restructured electricity mar-kets environment. TNEP can be incorporated with reactive power planning in which the operating condi...Transmission network expansion planning (TNEP) is a challenging issue especially in new restructured electricity mar-kets environment. TNEP can be incorporated with reactive power planning in which the operating conditions will be satisfied. In this paper a combinatorial mathematical model has been presented to solve transmission expansion and reactive power planning problem (TEPRPP) simultaneously. The proposed model is a non-convex problem having a mixed integer nonlinear nature where the number of candidate solutions to be evaluated increases exponentially according to the system size. The objective function of TEPRPP comprises the new circuits’ investment and production costs as well as load curtailment penalty payments. A real genetic algorithm (RGA) aimed to obtaining a significant quality solution to handle such a complicated problem has been employed. An interior point method (IPM) is applied to solve the proposed concurrent optimization problem in the solution steps of TEPRPP model. This paper proposes a new methodology for the best location as well as the capacity of VAr sources;it is tested on two well-known systems;the Garver and IEEE 24-bus systems. The obtained results show the capability and the viability of the proposed TEPRPP model incorporating operating conditions.展开更多
This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of i...This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.展开更多
In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configura...In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.展开更多
Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves lar...Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves large variability,uncertainty,and low-capacity credit.This gives rise to significant challenges for power system planning.Currently,many solutions are proposed to address the issue of operational flexibility inadequacy,including flexibility retrofit of thermal units,inter-regional transmission,electricity energy storage,and demand response(DR).Evidently,the performance and the cost of various solutions are different.It is relevant to explore the optimal portfolio to satisfy the flexibility requirement for a renewable dominated system and the role of each flexibility source.In this study,the value of diverse DR flexibilities was examined and a stochastic investment planning model considering DR is proposed.Two types of DRs,namely interrupted DR and transferred DR,were modeled.Chronological load and renewable generation curves with 8760 hours within a whole year were reduced to 4 weekly scenarios to accelerate the optimization.Clustered unit commitment constraints for accommodating variability of renewables were incorporated.Case studies based on IEEE RTS-96 system are reported to demonstrate the effectiveness of the proposed method and the DR potential to avoid energy storage investment.展开更多
The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,...The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.展开更多
The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 20...The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.展开更多
A generation company(GENCO)which has a conventional power plant(CPP)intends to add an energy storage system(ESS)beside the CPP to increase its flexibility and profitability.For this purpose,a new model is proposed for...A generation company(GENCO)which has a conventional power plant(CPP)intends to add an energy storage system(ESS)beside the CPP to increase its flexibility and profitability.For this purpose,a new model is proposed for coordinated operation planning of the CPP and ESS in energy and spinning reserve markets in the presence of a bilateral contract.The proposed model is based on the stochastic price based unit commitment(PBUC)and price based storage commitment(PBSC).The uncertainties of the energy and spinning reserve prices and delivery requests in the spinning reserve market are modeled via scenarios based upon historical data.The proposed model maximizes the profitability of the ESS beside the CPP and encourages the GENCO to invest the ESS.ESS technology options to use beside the CPP are determined by economic assessments.Numerical results show that utilization of ESSs improves the technical operation of CPPs,as well as GENCOs’profitability.展开更多
The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated i...The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated in the vast desert to the southeast of Urumqi, capital city of Xinjiang, the farm has bountiful wind energy resources, with wind speeds as high as 38 metres per second. First built with the help of Danish Government loans in 1992, the farm now provides electricity for local people, especially those in remote areas which are not connected to a power grid. The farm is now seeking both domestic and overseas cooperation for technological improvements and expansion, according展开更多
文摘In view of that the average electricity consumption per capita is still rather low in China, this paper putsforward ten focal problems in the 10th Five-year Power Plan, including optimized allocation of power sources and powernetworks, environmental protection in coal-fired power plants, as well as localization of power equipment, etc.
文摘The countermeasures are the actions that should be taken, after the occurrence of a nuclear accident to protect the public against the associated risks. These actions may be represented by sheltering, evacuation, distribution of stable iodine tablets and/or relocation. This study represents a comprehensive probabilistic study to investigate the role of the adoption of the countermeasures in case of a hypothetical accident of type LOCA for nuclear power plant of PWR (1000 Mw). The effective doses in different organs, short and long health effects, and the associated risks are calculated with and without countermeasures. In addition, the overall costs of the accident and the costs of countermeasures are estimated which represent our first trials to know how much the proposed accident cost. The results showed that, the area around the site requires early and late countermeasures action after the accident especially in the downwind sectors. For late countermeasures, the duration time of relocation ranged from about two to 10 years. The adoption of the countermeasures increases the costs of emergency plan by 40% but reduces the risk associated the accident.
基金Science and Technology Projects of State Grid Corporation of China(No.SGGSKY00FJJS1800140)。
文摘Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.
文摘a poster child for drought and famine to one of the fastest-growing economies in the world. However. this East African nation's energy production has not been on par with its rapid economic growth, often in double-digit figures,
文摘Wind power has an increasing share of the Brazilian energy market and may represent 11.6% of total capacity by 2024. For large hydro-thermal systems having high-storage capacity, a complementarity between hydro and wind production could have important effects. The current optimization models are applied to dispatch power plants to meet the market demand and optimize the generation dispatches considering only hydroelectric and thermal power plants. The remaining sources, including wind power, small-hydroelectric plants and biomass plants, are excluded from the optimization model and are included deterministically. This work introduces a general methodology to represent the stochastic behavior of wind production aimed at the planning and operation of large interconnected power systems. In fact, considering the generation of the wind power source stochastically could show the complementarity between the hydro and wind power production, reducing the energy price in the spot market with the reduction of thermal power dispatches. In addition to that, with a reduction in wind power and a simultaneous dry-season occurrence, this model, is able to show the need of thermal power plants dispatches as well as the reduction of the risk of energy shortages.
文摘Transmission network expansion planning (TNEP) is a challenging issue especially in new restructured electricity mar-kets environment. TNEP can be incorporated with reactive power planning in which the operating conditions will be satisfied. In this paper a combinatorial mathematical model has been presented to solve transmission expansion and reactive power planning problem (TEPRPP) simultaneously. The proposed model is a non-convex problem having a mixed integer nonlinear nature where the number of candidate solutions to be evaluated increases exponentially according to the system size. The objective function of TEPRPP comprises the new circuits’ investment and production costs as well as load curtailment penalty payments. A real genetic algorithm (RGA) aimed to obtaining a significant quality solution to handle such a complicated problem has been employed. An interior point method (IPM) is applied to solve the proposed concurrent optimization problem in the solution steps of TEPRPP model. This paper proposes a new methodology for the best location as well as the capacity of VAr sources;it is tested on two well-known systems;the Garver and IEEE 24-bus systems. The obtained results show the capability and the viability of the proposed TEPRPP model incorporating operating conditions.
文摘This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.
文摘In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.
基金jointly supported by Youth Program of National Natural Science Foundation of China(No.51907100)Technical Program of Global Energy Interconnection Group Co.,Ltd(No.1100/2020-75001B)
文摘Electric system planning with high variable renewable energy(VRE)penetration levels has attracted great attention world-wide.Electricity production of VRE highly depends on the weather conditions and thus involves large variability,uncertainty,and low-capacity credit.This gives rise to significant challenges for power system planning.Currently,many solutions are proposed to address the issue of operational flexibility inadequacy,including flexibility retrofit of thermal units,inter-regional transmission,electricity energy storage,and demand response(DR).Evidently,the performance and the cost of various solutions are different.It is relevant to explore the optimal portfolio to satisfy the flexibility requirement for a renewable dominated system and the role of each flexibility source.In this study,the value of diverse DR flexibilities was examined and a stochastic investment planning model considering DR is proposed.Two types of DRs,namely interrupted DR and transferred DR,were modeled.Chronological load and renewable generation curves with 8760 hours within a whole year were reduced to 4 weekly scenarios to accelerate the optimization.Clustered unit commitment constraints for accommodating variability of renewables were incorporated.Case studies based on IEEE RTS-96 system are reported to demonstrate the effectiveness of the proposed method and the DR potential to avoid energy storage investment.
文摘The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.
基金Supported by the National Key Technology R&D Program(2012BAC20B1003)the Key National Social Science Fund Project(12&ZD214)the Special Fund Project for the Scientific Research of the Environmental Protection Welfare Industry(201209001)
文摘The planning environmental impact assessment (EIA) of transmission and transformation power grid at levels of 500 and 220 kV had been finished completely in the 13 municipalities of Jiangsu Province by the end of 2012, which played important roles in guiding and planning the following transmission and transformation projects in environmental protection. In this paper, through the detail analysis on the objective and significance of the planning EIA of transmission and transformation power grid, legal basis and planning EIA practices, some suggestions and thinking about the planning EIA of transmission and transformation power grid were put forward.
文摘A generation company(GENCO)which has a conventional power plant(CPP)intends to add an energy storage system(ESS)beside the CPP to increase its flexibility and profitability.For this purpose,a new model is proposed for coordinated operation planning of the CPP and ESS in energy and spinning reserve markets in the presence of a bilateral contract.The proposed model is based on the stochastic price based unit commitment(PBUC)and price based storage commitment(PBSC).The uncertainties of the energy and spinning reserve prices and delivery requests in the spinning reserve market are modeled via scenarios based upon historical data.The proposed model maximizes the profitability of the ESS beside the CPP and encourages the GENCO to invest the ESS.ESS technology options to use beside the CPP are determined by economic assessments.Numerical results show that utilization of ESSs improves the technical operation of CPPs,as well as GENCOs’profitability.
文摘The Dabancheng Windpower Farm in Northwest China’s Xinjiang Uygur Autonomous Region, the largest of its kind in China, plans to increase its present generating capacity of 10 MW to 100 MW by the year 2000. Situated in the vast desert to the southeast of Urumqi, capital city of Xinjiang, the farm has bountiful wind energy resources, with wind speeds as high as 38 metres per second. First built with the help of Danish Government loans in 1992, the farm now provides electricity for local people, especially those in remote areas which are not connected to a power grid. The farm is now seeking both domestic and overseas cooperation for technological improvements and expansion, according