This paper uses CT to gain the energy directly from the high-voltage transmission line, to address the problem of power supply for monitoring system in high voltage side of transmission line. The draw-out power coil c...This paper uses CT to gain the energy directly from the high-voltage transmission line, to address the problem of power supply for monitoring system in high voltage side of transmission line. The draw-out power coil can induce voltage from the transmission line, using single-chip microcomputer to analog and output PMW wave to control the charging module, provides a stable 3.4 V DC voltage to the load, and solve the problem of easy saturating of core. The power supply based on this kind of draw-out power coil has undergone the overall testing, and it is verified-showing that it can properly work in a non-saturated status within the current range of 50 - 1000 A, and provide a stable output. The equipment also design protection circuit to improve the reliability to avid the impacts of the impulse current or short-circuit current. It effectively solves the problem of power supply for On-line Monitoring System of Transmission.展开更多
As weather radar stations require headroom environment to operate,they were mostly built on highlands which are usually unattended.The mains supply is relatively poor,and the risk of radar stoppages due to power outag...As weather radar stations require headroom environment to operate,they were mostly built on highlands which are usually unattended.The mains supply is relatively poor,and the risk of radar stoppages due to power outage is therefore ever-present.As such,the radar construction program is used to build a complementary security video monitoring system.By collecting monitoring images of the regulated power supply in real-time from power supply auto transfer systems in distribution rooms and radar transceiver rooms,using Spearman’s rank correlation coefficient to analyse pixel variation trends,and supplementing statistical analysis of pixel characteristics difference to eliminate misjudgments resulting from low image contrast in special scenarios,a software can be developed through C#.It has the function of automatically monitoring mains supply and alerting staff on duty to handle the power outage in a timely manner via text message so that any potential risk is neutralised before it can cause damage.This monitoring and auto-alerting approach is generally applicable to unattended rooms with large amounts of electronical equipment.展开更多
In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect ...In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect these faults immediately through single-point monitoring or collecting data after accidents.To coordinate the power quality data of both traction power supply systems(TPSSs)and high-speed trains(HSTs),a monitoring and assessing system is proposed to access the power quality issues on HSRs.By integrating train monitoring,traction substation monitoring and data center,this monitoring system not only realizes the real-time monitoring of operational behaviors for both TPSSs and HSTs,but also conducts a comprehensive assessment of operational quality for train-network systems.Based on a large number of monitoring data,the field measurements show that this real-time monitoring system is effective for monitoring and evaluating a traction-network system.展开更多
Based on the system of electric power supply for flexible manufacturing systems (FMS), a study has been carried out on the intelligent safety examination, monitoring and maintenance of its running environment. On the ...Based on the system of electric power supply for flexible manufacturing systems (FMS), a study has been carried out on the intelligent safety examination, monitoring and maintenance of its running environment. On the basis of the specific feature of the power supply network of an FMS, real time monitoring system of the power supply network and the fault diagnostic expert system for the power equipment have been designed. This system can diagnose not only definite fault phenomena, but also fuzzy, uncertain fault phenomena as well. Fault diagnostic knowledge base for the power equipment has been founded hierarchy architecture model and the method of fault tree analysis. Feasibility of this system has been proved by computer simulation.展开更多
The development process of high-voltage electric power equipment maintenance was introduced. It is pointed out that the trend of high-voltage electric power equipment maintenance is so called condition-based maintenan...The development process of high-voltage electric power equipment maintenance was introduced. It is pointed out that the trend of high-voltage electric power equipment maintenance is so called condition-based maintenance. With the development of computer technology and sensors, on-line monitoring of high-voltage electric power equipment has developed rapidly. By introducing the main principle of Schering bridge to measure tanδ, the way of on-line monitoring of high-voltage electric power equipment was explained. Difference methods of on-line monitoring of insulation parameters for 35 kV substation were discussed. Finally, the shortcomings as well as its tendency of on-line monitoring were analyzed.展开更多
Large numbers of basic transceiver stations,where the telecommunication room is one of the main components,comprise an important part of the telecommunication system.After earthquakes,considerable economic loss from t...Large numbers of basic transceiver stations,where the telecommunication room is one of the main components,comprise an important part of the telecommunication system.After earthquakes,considerable economic loss from telecommunication systems is often associated with seismic damage and functional loss of the telecommunication room.However,research related to this has been limited.In this study,shaking table tests were conducted for a full-scale typical telecommunication room,including a light-steel house and the necessary communication and power supply equipment.The tests not only focused on the seismic damage to all the structures but also considered the functions of the communication and power supply of the equipment.The interactions between these facilities and their effects on communication function were also investigated.Compared with the damage to structures,the interruption of the power supply due to earthquakes is a weak link.Finally,the damage indexes,together with their threshold values of different damage states for the communication and power supply equipment,were derived from the test results.The results of this research can contribute to the literature gaps regarding seismic performance studies of telecommunication rooms,and can serve as a valuable reference for future research on its seismic fragility and economic losses evaluation.展开更多
辐射环境监测是我国环境建设和生态文明建设中的重要内容,随之兴起的辐射环境监测自动站则成为辐射环境监测的重点。基于理论分析,明确辐射环境监测自动站的具体运行需求,建立在不间断供电的基础上,分析了不间断供电系统(Uninterruptabl...辐射环境监测是我国环境建设和生态文明建设中的重要内容,随之兴起的辐射环境监测自动站则成为辐射环境监测的重点。基于理论分析,明确辐射环境监测自动站的具体运行需求,建立在不间断供电的基础上,分析了不间断供电系统(Uninterruptable Power System,UPS)的具体配置方案与核心原理,结合具体的案例,明确了辐射环境监测自动站供电系统的运行逻辑与规划方案,并提出了多元化的维护政策,以保证辐射环境监测自动站的供电稳定运行。展开更多
文摘This paper uses CT to gain the energy directly from the high-voltage transmission line, to address the problem of power supply for monitoring system in high voltage side of transmission line. The draw-out power coil can induce voltage from the transmission line, using single-chip microcomputer to analog and output PMW wave to control the charging module, provides a stable 3.4 V DC voltage to the load, and solve the problem of easy saturating of core. The power supply based on this kind of draw-out power coil has undergone the overall testing, and it is verified-showing that it can properly work in a non-saturated status within the current range of 50 - 1000 A, and provide a stable output. The equipment also design protection circuit to improve the reliability to avid the impacts of the impulse current or short-circuit current. It effectively solves the problem of power supply for On-line Monitoring System of Transmission.
基金Supported by Science and Technology Open Research Fund Project of Guizhou Meteorological Bureau(KF[2009]08)。
文摘As weather radar stations require headroom environment to operate,they were mostly built on highlands which are usually unattended.The mains supply is relatively poor,and the risk of radar stoppages due to power outage is therefore ever-present.As such,the radar construction program is used to build a complementary security video monitoring system.By collecting monitoring images of the regulated power supply in real-time from power supply auto transfer systems in distribution rooms and radar transceiver rooms,using Spearman’s rank correlation coefficient to analyse pixel variation trends,and supplementing statistical analysis of pixel characteristics difference to eliminate misjudgments resulting from low image contrast in special scenarios,a software can be developed through C#.It has the function of automatically monitoring mains supply and alerting staff on duty to handle the power outage in a timely manner via text message so that any potential risk is neutralised before it can cause damage.This monitoring and auto-alerting approach is generally applicable to unattended rooms with large amounts of electronical equipment.
文摘In recent years,with the rapid development of high-speed railways(HSRs),power interruptions or disturbances in traction power supply systems have become increasingly dangerous.However,it is often impossible to detect these faults immediately through single-point monitoring or collecting data after accidents.To coordinate the power quality data of both traction power supply systems(TPSSs)and high-speed trains(HSTs),a monitoring and assessing system is proposed to access the power quality issues on HSRs.By integrating train monitoring,traction substation monitoring and data center,this monitoring system not only realizes the real-time monitoring of operational behaviors for both TPSSs and HSTs,but also conducts a comprehensive assessment of operational quality for train-network systems.Based on a large number of monitoring data,the field measurements show that this real-time monitoring system is effective for monitoring and evaluating a traction-network system.
文摘Based on the system of electric power supply for flexible manufacturing systems (FMS), a study has been carried out on the intelligent safety examination, monitoring and maintenance of its running environment. On the basis of the specific feature of the power supply network of an FMS, real time monitoring system of the power supply network and the fault diagnostic expert system for the power equipment have been designed. This system can diagnose not only definite fault phenomena, but also fuzzy, uncertain fault phenomena as well. Fault diagnostic knowledge base for the power equipment has been founded hierarchy architecture model and the method of fault tree analysis. Feasibility of this system has been proved by computer simulation.
文摘The development process of high-voltage electric power equipment maintenance was introduced. It is pointed out that the trend of high-voltage electric power equipment maintenance is so called condition-based maintenance. With the development of computer technology and sensors, on-line monitoring of high-voltage electric power equipment has developed rapidly. By introducing the main principle of Schering bridge to measure tanδ, the way of on-line monitoring of high-voltage electric power equipment was explained. Difference methods of on-line monitoring of insulation parameters for 35 kV substation were discussed. Finally, the shortcomings as well as its tendency of on-line monitoring were analyzed.
基金Key Project of the Key Laboratory of Earthquake Engineering and Engineering Vibration,China Earthquake Administration under Grant Nos.2020EEEVL0502 and 2019EEEVL0304。
文摘Large numbers of basic transceiver stations,where the telecommunication room is one of the main components,comprise an important part of the telecommunication system.After earthquakes,considerable economic loss from telecommunication systems is often associated with seismic damage and functional loss of the telecommunication room.However,research related to this has been limited.In this study,shaking table tests were conducted for a full-scale typical telecommunication room,including a light-steel house and the necessary communication and power supply equipment.The tests not only focused on the seismic damage to all the structures but also considered the functions of the communication and power supply of the equipment.The interactions between these facilities and their effects on communication function were also investigated.Compared with the damage to structures,the interruption of the power supply due to earthquakes is a weak link.Finally,the damage indexes,together with their threshold values of different damage states for the communication and power supply equipment,were derived from the test results.The results of this research can contribute to the literature gaps regarding seismic performance studies of telecommunication rooms,and can serve as a valuable reference for future research on its seismic fragility and economic losses evaluation.
文摘辐射环境监测是我国环境建设和生态文明建设中的重要内容,随之兴起的辐射环境监测自动站则成为辐射环境监测的重点。基于理论分析,明确辐射环境监测自动站的具体运行需求,建立在不间断供电的基础上,分析了不间断供电系统(Uninterruptable Power System,UPS)的具体配置方案与核心原理,结合具体的案例,明确了辐射环境监测自动站供电系统的运行逻辑与规划方案,并提出了多元化的维护政策,以保证辐射环境监测自动站的供电稳定运行。