This paper comes up with a concept of synergetic advanced dispatch in order to deal with the ever-increasing uncertainty in power grid: Decision is made with respecting to AGC units and active load on the basis of syn...This paper comes up with a concept of synergetic advanced dispatch in order to deal with the ever-increasing uncertainty in power grid: Decision is made with respecting to AGC units and active load on the basis of synergetic unit combination such that active load’s advantages in regulation speed is put to full use in achieving efficient cooperation with renewable energy power. Meanwhile, factoring in allowable frequency variation range during decision-making may help to reduce AGC units’ regulation load and improve power grid's capacity of accommodating renewable energy power. Calculation example analysis suggested that the model and technique presented in this paper is capable of efficient coordination between active loads and renewable energy power, delivering friendly transition with day-ahead dispatch and AVC control.展开更多
The dispatching center of power-grid companies is also the data center of the power grid where gathers great amount of operating information. The valuable information contained in these data means a lot for power grid...The dispatching center of power-grid companies is also the data center of the power grid where gathers great amount of operating information. The valuable information contained in these data means a lot for power grid operating management, but at present there is no special method for the management of operating data resource. This paper introduces the operating analysis and data mining system for power grid dispatching. The technique of data warehousing online analytical processing has been used to manage and analysis the great capacity of data. This analysis system is based on the real-time data of the power grid to dig out the potential rule of the power grid operating. This system also provides a research platform for the dispatchers, help to improve the JIT (Just in Time) management of power system.展开更多
With the increasing integration of intermittent power sources (IPSs) into the power system, the uncertainty of IPSs requires solution and current dispatch system needs improvement. This paper aims to generate the opti...With the increasing integration of intermittent power sources (IPSs) into the power system, the uncertainty of IPSs requires solution and current dispatch system needs improvement. This paper aims to generate the optimal dispatch plan for day-ahead scheduling and real-time dispatch using the proposed model of characteristic optimal power flow (COPF). The integral time period represented by the median load point and the heavy and light load point with simplicity and accuracy. Simulation case studies on a 30-bus system </span><span style="font-family:Verdana;">are </span><span style="font-family:Verdana;">presented, which shows that COPF is an effective model to generate the optimal dispatch plan for power systems with high penetration of IPSs.展开更多
A new versatile optimization, the particle swarm optimization based on multi-agent system (MAPSO) is presented. The economic load dispatch (ELD) problem of power system can be solved by the algorithm. By competing and...A new versatile optimization, the particle swarm optimization based on multi-agent system (MAPSO) is presented. The economic load dispatch (ELD) problem of power system can be solved by the algorithm. By competing and cooperating with the randomly selected neighbors, and adjusting its global searching ability and local exploring ability, this algorithm achieves the goal of high convergence precision and speed. To verify the effectiveness of the proposed algorithm, this algorithm is tested by three different ELD cases, including 3, 13 and 40 units IEEE cases, and the experiment results are compared with those tested by other intelligent algorithms in the same cases. The compared results show that feasible solutions can be reached effectively, local optima can be avoided and faster solution can be applied with the proposed algorithm, the algorithm for ELD problem is versatile and efficient.展开更多
To utilize exist SCADA(Supervisory Control and Data Acqui si tion)/EMS (Energy Management System) fully and economize capital, Henan Electric Power Dispatching and Communication Center in China established a set of H...To utilize exist SCADA(Supervisory Control and Data Acqui si tion)/EMS (Energy Management System) fully and economize capital, Henan Electric Power Dispatching and Communication Center in China established a set of Henan Dispatcher Training Simulator (HNDTS) base on its exist SCADA/EMS. In order to i ntegrated with exist SCADA/EMS, the integration method and technique are propose d. Graph data integration discussed with emphasis. After integration implemented , HNDTS can share all data with SCADA/EMS and dispatchers can be trained in same environment as real work situation, in the same time it can avoid amout of work of maintenance engineers. Both advantages and disadvantages of integration are analyzed. In the end of paper, the requirement for future DTS is put forward bas e on the experience of author.展开更多
With the development of power systems, power grid within a control area becomes much more complicated due to increasing number of nodes and renewable energy interconnections. The role of power system control center is...With the development of power systems, power grid within a control area becomes much more complicated due to increasing number of nodes and renewable energy interconnections. The role of power system control center is more critical in maintaining system reliable and security operations. Latest developed information and communication technologies provide a platform to enhance the functions and performance of power system control center. Smart power dispatch concept will be the trend of future control center development. In this paper, we start from the human factors of control center design and propose operation indices to reduce the information presented to the system operator. The operation indices will be the important criteria in situation awareness of a power grid. Past, present, future and capability states of a power grid are also proposed to provide better visions to the operator of system conditions. The basic ideas of operation indices and operation states are discussed in the paper. In the end, the design factors for a power dispatch cockpit are discussed.展开更多
This paper presents the existing state anddevelopment planning of East China PowerSystem, which refers to load, power source,power network, system protection, dispatchautomation and system communication.
The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A roll...The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A rolling generation dispatch model based on ultra-short-term wind power forecast was proposed. In generation dispatch process, the model rolling correct not only the conventional units power output but also the power from wind farm, simultaneously. Second order Markov chain model was utilized to modify wind power prediction error state (WPPES) and update forecast results of wind power over the remaining dispatch periods. The prime-dual affine scaling interior point method was used to solve the proposed model that taken into account the constraints of multi-periods power balance, unit output adjustment, up spinning reserve and down spinning reserve.展开更多
文摘This paper comes up with a concept of synergetic advanced dispatch in order to deal with the ever-increasing uncertainty in power grid: Decision is made with respecting to AGC units and active load on the basis of synergetic unit combination such that active load’s advantages in regulation speed is put to full use in achieving efficient cooperation with renewable energy power. Meanwhile, factoring in allowable frequency variation range during decision-making may help to reduce AGC units’ regulation load and improve power grid's capacity of accommodating renewable energy power. Calculation example analysis suggested that the model and technique presented in this paper is capable of efficient coordination between active loads and renewable energy power, delivering friendly transition with day-ahead dispatch and AVC control.
文摘The dispatching center of power-grid companies is also the data center of the power grid where gathers great amount of operating information. The valuable information contained in these data means a lot for power grid operating management, but at present there is no special method for the management of operating data resource. This paper introduces the operating analysis and data mining system for power grid dispatching. The technique of data warehousing online analytical processing has been used to manage and analysis the great capacity of data. This analysis system is based on the real-time data of the power grid to dig out the potential rule of the power grid operating. This system also provides a research platform for the dispatchers, help to improve the JIT (Just in Time) management of power system.
文摘With the increasing integration of intermittent power sources (IPSs) into the power system, the uncertainty of IPSs requires solution and current dispatch system needs improvement. This paper aims to generate the optimal dispatch plan for day-ahead scheduling and real-time dispatch using the proposed model of characteristic optimal power flow (COPF). The integral time period represented by the median load point and the heavy and light load point with simplicity and accuracy. Simulation case studies on a 30-bus system </span><span style="font-family:Verdana;">are </span><span style="font-family:Verdana;">presented, which shows that COPF is an effective model to generate the optimal dispatch plan for power systems with high penetration of IPSs.
文摘A new versatile optimization, the particle swarm optimization based on multi-agent system (MAPSO) is presented. The economic load dispatch (ELD) problem of power system can be solved by the algorithm. By competing and cooperating with the randomly selected neighbors, and adjusting its global searching ability and local exploring ability, this algorithm achieves the goal of high convergence precision and speed. To verify the effectiveness of the proposed algorithm, this algorithm is tested by three different ELD cases, including 3, 13 and 40 units IEEE cases, and the experiment results are compared with those tested by other intelligent algorithms in the same cases. The compared results show that feasible solutions can be reached effectively, local optima can be avoided and faster solution can be applied with the proposed algorithm, the algorithm for ELD problem is versatile and efficient.
文摘To utilize exist SCADA(Supervisory Control and Data Acqui si tion)/EMS (Energy Management System) fully and economize capital, Henan Electric Power Dispatching and Communication Center in China established a set of Henan Dispatcher Training Simulator (HNDTS) base on its exist SCADA/EMS. In order to i ntegrated with exist SCADA/EMS, the integration method and technique are propose d. Graph data integration discussed with emphasis. After integration implemented , HNDTS can share all data with SCADA/EMS and dispatchers can be trained in same environment as real work situation, in the same time it can avoid amout of work of maintenance engineers. Both advantages and disadvantages of integration are analyzed. In the end of paper, the requirement for future DTS is put forward bas e on the experience of author.
文摘With the development of power systems, power grid within a control area becomes much more complicated due to increasing number of nodes and renewable energy interconnections. The role of power system control center is more critical in maintaining system reliable and security operations. Latest developed information and communication technologies provide a platform to enhance the functions and performance of power system control center. Smart power dispatch concept will be the trend of future control center development. In this paper, we start from the human factors of control center design and propose operation indices to reduce the information presented to the system operator. The operation indices will be the important criteria in situation awareness of a power grid. Past, present, future and capability states of a power grid are also proposed to provide better visions to the operator of system conditions. The basic ideas of operation indices and operation states are discussed in the paper. In the end, the design factors for a power dispatch cockpit are discussed.
文摘This paper presents the existing state anddevelopment planning of East China PowerSystem, which refers to load, power source,power network, system protection, dispatchautomation and system communication.
文摘The power systems economic and safety operation considering large-scale wind power penetration are now facing great challenges, which are based on reliable power supply and predictable load demands in the past. A rolling generation dispatch model based on ultra-short-term wind power forecast was proposed. In generation dispatch process, the model rolling correct not only the conventional units power output but also the power from wind farm, simultaneously. Second order Markov chain model was utilized to modify wind power prediction error state (WPPES) and update forecast results of wind power over the remaining dispatch periods. The prime-dual affine scaling interior point method was used to solve the proposed model that taken into account the constraints of multi-periods power balance, unit output adjustment, up spinning reserve and down spinning reserve.