Light transmission data collected from June to July 1987 and from February to March 1997 by the R/V Kexue 1 in the East China Sea were used to analyze its distribution characteristics and its relation to the sediment ...Light transmission data collected from June to July 1987 and from February to March 1997 by the R/V Kexue 1 in the East China Sea were used to analyze its distribution characteristics and its relation to the sediment transport in this sea. Some results obtained were: (1) The Taiwan Warm Current flowing northwards seemed to be a barrier preventing suspended matter discharged from the Changjiang River Estuary from continuously moving southeastward and causing the suspended matter to flow along a path near 123°30′E in summer and 123°00′E in winter. (2) Suspended matter in the area adjacent to the Changjiang River Estuary could not be transported southward along the coast in summer due to opposing offshore currents including the Taiwan Warm Current flowing northward and the Changjiang Diluted Water turning northeastward. (3) The thermocline and temperature front bar suspended matter from crossing through.展开更多
On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The n...On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The north-channel projects for sending power from west to east started to construct this time include three transmission and substation projects and four power source projects. This paper makes a brief introduction to the seven projects.展开更多
To implement the CPC CentralCommittee’s strategy of slanting theeconomic construction to the Midand West of China and to further promote thedevelopment and cooperation of economyand trade between the East and West, t...To implement the CPC CentralCommittee’s strategy of slanting theeconomic construction to the Midand West of China and to further promote thedevelopment and cooperation of economyand trade between the East and West, theEast-West Business and Trade Talks wereheld by the China Council for the Promotionof International Trade (CCPIT). At theconference, Mr. Cui Zhenghua, vice governorof Gansu Province and concurrently chairmanof the Gansu Subcouncil of the CCPIT,delivered a speech on the economiccooperation and development between theEast and West of China.展开更多
Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and e...Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and electrical product of the Ministry of Machinery Industry as well. It has been awarded the honor of first grade factory in the competition for key and major project construction in Shanghai year by year,展开更多
The clearing price and bidding price in electricity market are two key indicators to measure whether it is reasonable or not. Based on the grey incidence analysis, this paper studies the correlation coefficient betwee...The clearing price and bidding price in electricity market are two key indicators to measure whether it is reasonable or not. Based on the grey incidence analysis, this paper studies the correlation coefficient between the clearing price and bidding price with the generation cost, the supervision and rules of the market, the supply and demand situation, the behavior of market members over the same period, which is based on the actual data of the trans-provincial centralized trading market of East China Power Grid. The results show that the factors affecting the clearing price and bidding price from largest to smallest are generation cost, supervision and rules of the market, the supply and demand situation, the behavior of market members. The conclusion is that the trans-provincial trading platform of East China Power Grid is a reasonable regional market which can discover the market cost, and regulate the market supply and demand balance, and promote healthy competition.展开更多
Based on the current situation of urbanization development in West China, this paper analyses main factors responsible for sluggish urbanization in West China as follows: impact of environment factor, impact of popula...Based on the current situation of urbanization development in West China, this paper analyses main factors responsible for sluggish urbanization in West China as follows: impact of environment factor, impact of population quality and quantity, lagging of public product service, stagnancy of technological development, backwardness of slow growth, and rigidity of system building. And then this paper analyses the restriction mechanism of urbanization in West China: at the superficial level, the constraints of urbanization in West China arise from the shortage of capital; at the profound level, the backward culture contributes to the constraints of urbanization in West China. The thread of resolving restriction mechanism of urbanization in West China is put forward from system, economy and culture. On the basis of this thread, we construct the power system for the development of urbanization in West China. The power system for urbanization in West China should be propelled by "four forces", namely, pull of external forces, cohesive strength of regional market environment, expansion power inside countryside, traction of industrial structure adjustment. Innovation is the engine of impetus for urbanization in West China; spatial clustering and modernization of industry is the major driving force for urbanization; the government behaviour, driving of foreign investment, great projects and other forces are supplementary power. Via the main power, we should take the market as medium to achieve the role of power in promoting urbanization.展开更多
The 2019 China-Europe Seminar on Human Rights hosted by the China Society for Human Rights Studies and Austria-China Friendship Association was successfully held in Austria on June 21,2019.Through this conference,Chin...The 2019 China-Europe Seminar on Human Rights hosted by the China Society for Human Rights Studies and Austria-China Friendship Association was successfully held in Austria on June 21,2019.Through this conference,China,as an important representative of Eastern countries of human rights,demonstrated its fruitful theoretical and practical human rights achievements to European countries.The conference also witnessed lively communication and exchanges on human rights values and the human rights discourse system between China and the West,during which scholars of the East and the West discussed the universality and particularity of human rights,and the evolution of human rights under different historical and cultural values.The conference advocated that the concept of a community with a shared future for human beings proposed by China should be incorporated into human rights governance of sovereign states and the international community.The convergence and integration of the human rights concepts of the East and the West will inevitably lead human rights practices of the East and the West to embark on a new journey.展开更多
Objective The Early Permian mafic-ultramafic intrusions (298- 270 Ma, Mao et al., 2008), which are widely distributed in different tectonic domains in North Xinjiang, host magmatic sulfide ore deposits, making Nort...Objective The Early Permian mafic-ultramafic intrusions (298- 270 Ma, Mao et al., 2008), which are widely distributed in different tectonic domains in North Xinjiang, host magmatic sulfide ore deposits, making North Xinjiang the second most important region for Ni resources in China. The bulk of Cu-Ni ore deposits in East Tianshan, making up a large portion of Ni resources in North Xinjiang, were concentrated in the east of East Tianshan (the Huangshan- Jing'erquan region) (Feng Yanqing, et al., 2017), while no any analogue was discovered in the west of East Tianshan until the Lubei Cu-Ni (Co) ore deposit (90°21'E, 42°10rN) was identified by Xinjiang Geological Survey in 2014. The Lubei Cu-Ni (Co) ore deposit is a medium- to large- sized deposit with Ni and Cu grades in the range 0.2%- 7.76% and 0.2%-2.30%, respectively. This work has initiated the prospection for a large-sized Cu-Ni ore deposit in the west of East Tianshan.展开更多
In this paper a novel cost function based on the relationship between operation cost of unit and generation load rate is employed in an agent-based model of Trans-provincial Centralized Bidding Trading Market of East ...In this paper a novel cost function based on the relationship between operation cost of unit and generation load rate is employed in an agent-based model of Trans-provincial Centralized Bidding Trading Market of East China Grid. Simulation results are compared to real data to prove that the model is correct. Further analysis on simulation results point out the way to achieve an all-win game for power market members: generation companies improve their average load rates of the units by selling their electricity in the market, which makes units' cost drop and settlement price stay lower than benchmark price. Consequently electricity-demand provinces saved expenses, and units increase their profits. In conclusion, the trans-provincial electricity market of East China Power Grid is a successive case which improves the efficiency of the electricity industry by market-oriented measures.展开更多
This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper co...This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies.展开更多
文摘Light transmission data collected from June to July 1987 and from February to March 1997 by the R/V Kexue 1 in the East China Sea were used to analyze its distribution characteristics and its relation to the sediment transport in this sea. Some results obtained were: (1) The Taiwan Warm Current flowing northwards seemed to be a barrier preventing suspended matter discharged from the Changjiang River Estuary from continuously moving southeastward and causing the suspended matter to flow along a path near 123°30′E in summer and 123°00′E in winter. (2) Suspended matter in the area adjacent to the Changjiang River Estuary could not be transported southward along the coast in summer due to opposing offshore currents including the Taiwan Warm Current flowing northward and the Changjiang Diluted Water turning northeastward. (3) The thermocline and temperature front bar suspended matter from crossing through.
文摘On August 20, 2002, the construction-starting ceremonies of the north-channel projects for sending power from west to east were solemnly held at one main meeting place and five sub-meeting places simultaneously. The north-channel projects for sending power from west to east started to construct this time include three transmission and substation projects and four power source projects. This paper makes a brief introduction to the seven projects.
文摘To implement the CPC CentralCommittee’s strategy of slanting theeconomic construction to the Midand West of China and to further promote thedevelopment and cooperation of economyand trade between the East and West, theEast-West Business and Trade Talks wereheld by the China Council for the Promotionof International Trade (CCPIT). At theconference, Mr. Cui Zhenghua, vice governorof Gansu Province and concurrently chairmanof the Gansu Subcouncil of the CCPIT,delivered a speech on the economiccooperation and development between theEast and West of China.
文摘Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and electrical product of the Ministry of Machinery Industry as well. It has been awarded the honor of first grade factory in the competition for key and major project construction in Shanghai year by year,
文摘The clearing price and bidding price in electricity market are two key indicators to measure whether it is reasonable or not. Based on the grey incidence analysis, this paper studies the correlation coefficient between the clearing price and bidding price with the generation cost, the supervision and rules of the market, the supply and demand situation, the behavior of market members over the same period, which is based on the actual data of the trans-provincial centralized trading market of East China Power Grid. The results show that the factors affecting the clearing price and bidding price from largest to smallest are generation cost, supervision and rules of the market, the supply and demand situation, the behavior of market members. The conclusion is that the trans-provincial trading platform of East China Power Grid is a reasonable regional market which can discover the market cost, and regulate the market supply and demand balance, and promote healthy competition.
基金Supported by the National Natural Science Foundation (51178372)
文摘Based on the current situation of urbanization development in West China, this paper analyses main factors responsible for sluggish urbanization in West China as follows: impact of environment factor, impact of population quality and quantity, lagging of public product service, stagnancy of technological development, backwardness of slow growth, and rigidity of system building. And then this paper analyses the restriction mechanism of urbanization in West China: at the superficial level, the constraints of urbanization in West China arise from the shortage of capital; at the profound level, the backward culture contributes to the constraints of urbanization in West China. The thread of resolving restriction mechanism of urbanization in West China is put forward from system, economy and culture. On the basis of this thread, we construct the power system for the development of urbanization in West China. The power system for urbanization in West China should be propelled by "four forces", namely, pull of external forces, cohesive strength of regional market environment, expansion power inside countryside, traction of industrial structure adjustment. Innovation is the engine of impetus for urbanization in West China; spatial clustering and modernization of industry is the major driving force for urbanization; the government behaviour, driving of foreign investment, great projects and other forces are supplementary power. Via the main power, we should take the market as medium to achieve the role of power in promoting urbanization.
文摘The 2019 China-Europe Seminar on Human Rights hosted by the China Society for Human Rights Studies and Austria-China Friendship Association was successfully held in Austria on June 21,2019.Through this conference,China,as an important representative of Eastern countries of human rights,demonstrated its fruitful theoretical and practical human rights achievements to European countries.The conference also witnessed lively communication and exchanges on human rights values and the human rights discourse system between China and the West,during which scholars of the East and the West discussed the universality and particularity of human rights,and the evolution of human rights under different historical and cultural values.The conference advocated that the concept of a community with a shared future for human beings proposed by China should be incorporated into human rights governance of sovereign states and the international community.The convergence and integration of the human rights concepts of the East and the West will inevitably lead human rights practices of the East and the West to embark on a new journey.
基金supported by the Geological Survey of China(grant No.DD20160007)
文摘Objective The Early Permian mafic-ultramafic intrusions (298- 270 Ma, Mao et al., 2008), which are widely distributed in different tectonic domains in North Xinjiang, host magmatic sulfide ore deposits, making North Xinjiang the second most important region for Ni resources in China. The bulk of Cu-Ni ore deposits in East Tianshan, making up a large portion of Ni resources in North Xinjiang, were concentrated in the east of East Tianshan (the Huangshan- Jing'erquan region) (Feng Yanqing, et al., 2017), while no any analogue was discovered in the west of East Tianshan until the Lubei Cu-Ni (Co) ore deposit (90°21'E, 42°10rN) was identified by Xinjiang Geological Survey in 2014. The Lubei Cu-Ni (Co) ore deposit is a medium- to large- sized deposit with Ni and Cu grades in the range 0.2%- 7.76% and 0.2%-2.30%, respectively. This work has initiated the prospection for a large-sized Cu-Ni ore deposit in the west of East Tianshan.
文摘In this paper a novel cost function based on the relationship between operation cost of unit and generation load rate is employed in an agent-based model of Trans-provincial Centralized Bidding Trading Market of East China Grid. Simulation results are compared to real data to prove that the model is correct. Further analysis on simulation results point out the way to achieve an all-win game for power market members: generation companies improve their average load rates of the units by selling their electricity in the market, which makes units' cost drop and settlement price stay lower than benchmark price. Consequently electricity-demand provinces saved expenses, and units increase their profits. In conclusion, the trans-provincial electricity market of East China Power Grid is a successive case which improves the efficiency of the electricity industry by market-oriented measures.
文摘This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies.