期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Air-drying Models for New-built Offshore Gas Pipelines 被引量:4
1
作者 Cao Xuewen Wang Liyang Lin Zonghu 《Petroleum Science》 SCIE CAS CSCD 2005年第4期56-61,共6页
Drying (conditioning) is an important procedure to prevent hydrate formation during gas pipeline gas-up and to protect pipelines against corrosion. The air-drying method is preferred in offshore gas pipelines pre-co... Drying (conditioning) is an important procedure to prevent hydrate formation during gas pipeline gas-up and to protect pipelines against corrosion. The air-drying method is preferred in offshore gas pipelines pre-commissioning. The air-drying process of gas pipelines commonly includes two steps, air purging and soak test. The mass conservation and the phase equilibrium theory are applied to setting up the mathematical models of air purging, which can be used to simulate dry airflow rate and drying time. Fick diffusion law is applied to setting up the mathematical model of soak test, which can predict the water vapor concentration distribution. The results calculated from the purging model and the soak test model are in good agreement with the experimental data in the DF 1-1 offshore production pipeline conditioning. The models are verified to be available for the air-drying project design of offshore gas pipelines. Some proposals for airdrying engineering and operational procedures are put forward by analyzing the air-drying process of DFI-1 gasexporting pipelines. 展开更多
关键词 Offshore pipeline pre-commissioning air-purging soak test mechanism model
下载PDF
浅谈沙特Kayan聚碳酸酯项目工艺管道的预试运
2
作者 丁心淮 《科技创新导报》 2012年第27期118-119,共2页
以沙特Kayan 26万吨/年聚碳酸酯项目的工艺管道预试运工作为例,从预试运的方法、准备工作、基本原则、验收方法和隐患排除情况等方面来总结经验,为类似装置的工艺管道预试运工作提供借鉴和指导。
关键词 聚碳酸酯(Polycarbonate) 管道(Piping) 预试运(pre-commissioning)
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部