In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d...In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.展开更多
As the controlled research of Dynamic Installation(DI)and Static Installation(SI),a new interference installation method was developed based on electromagnetic loading to enhance the mechanical properties of composite...As the controlled research of Dynamic Installation(DI)and Static Installation(SI),a new interference installation method was developed based on electromagnetic loading to enhance the mechanical properties of composite structures.Four different interference-fit sizes were considered,ranging from a net fit to 2.0%.The experiments were conducted to evaluate the installation resistance and the mechanical behavior of the joint under external loads.Meanwhile,an FFA model to model the stress distribution and damage behavior of the bolt-hole contact interface was established.The load-displacement curve and damage modes of experiments were used to verify the FEA results.The results show that the installation resistance during DI process was remarkably lower than that of SI process corresponding to all interference-fit sizes,and the stress amplitudes induced by interference were larger and widely distributed.The damage of the hole wall was positively correlated with interference fit size,but DI can significantly reduce the damage compared to SI.In performance tests,DI enhanced the static bearing capacity and extended longer fatigue life of the joints than SI.DI methods can be an effective way to achieve highly reliable interference joints in composite structures.展开更多
A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional constructi...A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional construction which requires compaction of soil, aggregate base, sub-base and asphaltic layers. A Geosynthetic Access Mat (GAM) system can serve as an alternative to other traditional construction techniques to accommodate temporary construction. Due to its rigidity, the mat system can provide substantial vertical resistance to the applied load under a large deflection subject to soil conditions. This paper provides details of GAM specifications, soil conditions, applications, installation procedure, comparison with other soil stabilization methods and Aramco experience for deployments of these mats.展开更多
基金Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(No.2012DFA70490)
文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
基金co-supported by the National Commercial Aircraft Manufacturing Engineering Innovation Fund,China(No.COMAC-SFGS-2-22-1816)Shaanxi Province Key Research and Development Program Projects,China(No.2022GXLH-02025)Shaanxi Province 100 Scientific and Technological Achievements Transformation Action Projects,China(No.2021CGBX-11)。
文摘As the controlled research of Dynamic Installation(DI)and Static Installation(SI),a new interference installation method was developed based on electromagnetic loading to enhance the mechanical properties of composite structures.Four different interference-fit sizes were considered,ranging from a net fit to 2.0%.The experiments were conducted to evaluate the installation resistance and the mechanical behavior of the joint under external loads.Meanwhile,an FFA model to model the stress distribution and damage behavior of the bolt-hole contact interface was established.The load-displacement curve and damage modes of experiments were used to verify the FEA results.The results show that the installation resistance during DI process was remarkably lower than that of SI process corresponding to all interference-fit sizes,and the stress amplitudes induced by interference were larger and widely distributed.The damage of the hole wall was positively correlated with interference fit size,but DI can significantly reduce the damage compared to SI.In performance tests,DI enhanced the static bearing capacity and extended longer fatigue life of the joints than SI.DI methods can be an effective way to achieve highly reliable interference joints in composite structures.
文摘A stable surface to move manpower and equipment is a key for the construction operations. To create a stable road surface, the road construction techniques are time-consuming and expensive for a traditional construction which requires compaction of soil, aggregate base, sub-base and asphaltic layers. A Geosynthetic Access Mat (GAM) system can serve as an alternative to other traditional construction techniques to accommodate temporary construction. Due to its rigidity, the mat system can provide substantial vertical resistance to the applied load under a large deflection subject to soil conditions. This paper provides details of GAM specifications, soil conditions, applications, installation procedure, comparison with other soil stabilization methods and Aramco experience for deployments of these mats.