Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation pe...Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation performance of MCT.To solve the practical resource scheduling problem(RSP)in MCT efficiently,this paper has contributions to both the problem model and the algorithm design.Firstly,in the problem model,different from most of the existing studies that only consider scheduling part of the resources in MCT,we propose a unified mathematical model for formulating an integrated RSP.The new integrated RSP model allocates and schedules multiple MCT resources simultaneously by taking the total cost minimization as the objective.Secondly,in the algorithm design,a pre-selection-based ant colony system(PACS)approach is proposed based on graphic structure solution representation and a pre-selection strategy.On the one hand,as the RSP can be formulated as the shortest path problem on the directed complete graph,the graphic structure is proposed to represent the solution encoding to consider multiple constraints and multiple factors of the RSP,which effectively avoids the generation of infeasible solutions.On the other hand,the pre-selection strategy aims to reduce the computational burden of PACS and to fast obtain a higher-quality solution.To evaluate the performance of the proposed novel PACS in solving the new integrated RSP model,a set of test cases with different sizes is conducted.Experimental results and comparisons show the effectiveness and efficiency of the PACS algorithm,which can significantly outperform other state-of-the-art algorithms.展开更多
In recent years, target tracking has been considered one of the most important applications of wireless sensornetwork (WSN). Optimizing target tracking performance and prolonging network lifetime are two equally criti...In recent years, target tracking has been considered one of the most important applications of wireless sensornetwork (WSN). Optimizing target tracking performance and prolonging network lifetime are two equally criticalobjectives in this scenario. The existing mechanisms still have weaknesses in balancing the two demands. Theproposed heuristic multi-node collaborative scheduling mechanism (HMNCS) comprises cluster head (CH)election, pre-selection, and task set selectionmechanisms, where the latter two kinds of selections forma two-layerselection mechanism. The CH election innovatively introduces the movement trend of the target and establishesa scoring mechanism to determine the optimal CH, which can delay the CH rotation and thus reduce energyconsumption. The pre-selection mechanism adaptively filters out suitable nodes as the candidate task set to applyfor tracking tasks, which can reduce the application consumption and the overhead of the following task setselection. Finally, the task node selection is mathematically transformed into an optimization problem and thegenetic algorithm is adopted to form a final task set in the task set selection mechanism. Simulation results showthat HMNCS outperforms other compared mechanisms in the tracking accuracy and the network lifetime.展开更多
An understanding of the influence of contractor monitoring on performance of road infrastructural projects in Uganda provided an impetus for this study. The objectives of the study were to: assess the relationship bet...An understanding of the influence of contractor monitoring on performance of road infrastructural projects in Uganda provided an impetus for this study. The objectives of the study were to: assess the relationship between contractors monitoring and performance of national road infrastructure projects and the relationship between contractor monitoring components and performance of national road infrastructure projects in Uganda. Purposive sampling was employed in selecting the procurement professionals, engineers and simple random sampling was adopted in selecting private consultants, members of parliament and respondents from the civil society organizations. Data for this study were collected using a closed ended questionnaire and interviews. Some of the major finding from this study include: weak procurement rules which lead to awarding road projects to incompetent contractors;contractor monitoring being handled by unqualified, incompetent and inexperienced professionals;lack of contractors and contract supervisors appraisal system;delay of contractors payments which affects timelines in services delivery;lack of a strong internal project monitoring and evaluation mechanism at the Uganda National Roads Agency (UNRA). The research therefore recommends the establishment of an Independent Public Infrastructure Development and Monitoring Unit by government and adoption of systems that appraise both contractors and contract supervisors with clear disciplinary actions for unsatisfactory performance by the UNRA.展开更多
Outcome-based contract( OBC) is a kind of contracting mechanism,which allows the customer to pay only when the firm has delivered outcomes,rather than activities and tasks involved. To achieve the higher demand of the...Outcome-based contract( OBC) is a kind of contracting mechanism,which allows the customer to pay only when the firm has delivered outcomes,rather than activities and tasks involved. To achieve the higher demand of the delivering outcome of the contract,the evaluation of contractor's performance was focused on. A reasonable and objective contractor performance evaluation system is constructed by considering various uncertainties. The set pair theory is used to analyze the four-element connection of quality of service contractors. It aims to provide a theoretical basis for the decisionmaker to make confirmation of the equipment contractor who has a better performance and development trend.展开更多
基金This research was supported in part by the National Key Research and Development Program of China under Grant 2022YFB3305303in part by the National Natural Science Foundations of China(NSFC)under Grant 62106055+1 种基金in part by the Guangdong Natural Science Foundation under Grant 2022A1515011825in part by the Guangzhou Science and Technology Planning Project under Grants 2023A04J0388 and 2023A03J0662.
文摘Marine container terminal(MCT)plays a key role in the marine intelligent transportation system and international logistics system.However,the efficiency of resource scheduling significantly influences the operation performance of MCT.To solve the practical resource scheduling problem(RSP)in MCT efficiently,this paper has contributions to both the problem model and the algorithm design.Firstly,in the problem model,different from most of the existing studies that only consider scheduling part of the resources in MCT,we propose a unified mathematical model for formulating an integrated RSP.The new integrated RSP model allocates and schedules multiple MCT resources simultaneously by taking the total cost minimization as the objective.Secondly,in the algorithm design,a pre-selection-based ant colony system(PACS)approach is proposed based on graphic structure solution representation and a pre-selection strategy.On the one hand,as the RSP can be formulated as the shortest path problem on the directed complete graph,the graphic structure is proposed to represent the solution encoding to consider multiple constraints and multiple factors of the RSP,which effectively avoids the generation of infeasible solutions.On the other hand,the pre-selection strategy aims to reduce the computational burden of PACS and to fast obtain a higher-quality solution.To evaluate the performance of the proposed novel PACS in solving the new integrated RSP model,a set of test cases with different sizes is conducted.Experimental results and comparisons show the effectiveness and efficiency of the PACS algorithm,which can significantly outperform other state-of-the-art algorithms.
基金the Project Program of Science and Technology on Micro-System Laboratory,No.6142804220101.
文摘In recent years, target tracking has been considered one of the most important applications of wireless sensornetwork (WSN). Optimizing target tracking performance and prolonging network lifetime are two equally criticalobjectives in this scenario. The existing mechanisms still have weaknesses in balancing the two demands. Theproposed heuristic multi-node collaborative scheduling mechanism (HMNCS) comprises cluster head (CH)election, pre-selection, and task set selectionmechanisms, where the latter two kinds of selections forma two-layerselection mechanism. The CH election innovatively introduces the movement trend of the target and establishesa scoring mechanism to determine the optimal CH, which can delay the CH rotation and thus reduce energyconsumption. The pre-selection mechanism adaptively filters out suitable nodes as the candidate task set to applyfor tracking tasks, which can reduce the application consumption and the overhead of the following task setselection. Finally, the task node selection is mathematically transformed into an optimization problem and thegenetic algorithm is adopted to form a final task set in the task set selection mechanism. Simulation results showthat HMNCS outperforms other compared mechanisms in the tracking accuracy and the network lifetime.
文摘An understanding of the influence of contractor monitoring on performance of road infrastructural projects in Uganda provided an impetus for this study. The objectives of the study were to: assess the relationship between contractors monitoring and performance of national road infrastructure projects and the relationship between contractor monitoring components and performance of national road infrastructure projects in Uganda. Purposive sampling was employed in selecting the procurement professionals, engineers and simple random sampling was adopted in selecting private consultants, members of parliament and respondents from the civil society organizations. Data for this study were collected using a closed ended questionnaire and interviews. Some of the major finding from this study include: weak procurement rules which lead to awarding road projects to incompetent contractors;contractor monitoring being handled by unqualified, incompetent and inexperienced professionals;lack of contractors and contract supervisors appraisal system;delay of contractors payments which affects timelines in services delivery;lack of a strong internal project monitoring and evaluation mechanism at the Uganda National Roads Agency (UNRA). The research therefore recommends the establishment of an Independent Public Infrastructure Development and Monitoring Unit by government and adoption of systems that appraise both contractors and contract supervisors with clear disciplinary actions for unsatisfactory performance by the UNRA.
文摘Outcome-based contract( OBC) is a kind of contracting mechanism,which allows the customer to pay only when the firm has delivered outcomes,rather than activities and tasks involved. To achieve the higher demand of the delivering outcome of the contract,the evaluation of contractor's performance was focused on. A reasonable and objective contractor performance evaluation system is constructed by considering various uncertainties. The set pair theory is used to analyze the four-element connection of quality of service contractors. It aims to provide a theoretical basis for the decisionmaker to make confirmation of the equipment contractor who has a better performance and development trend.