The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse ...The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse stretching load is applied on the external exposure section of anchor cable under construction or in service, and then the elongation variation of stress bars is measured to determine the anchor stress. We elaborated the theory and testing mechanism of prestressed tensioning method, and systematically studied key issues during the prestressed tensioning process of anchor cable by using physical model test, including the composition of tension stress-elongation curve, the variation of anchor stress, the compensation of locked anchor stress, and the judgment of anchor stress, and verified the theory feasibility of prestressed tensioning method. A case study on slope anchor cable of one highway project was conducted to further discuss on the test method, operation procedures and judgment of prestressed tensioning method on obtaining anchor stress, and then the test data of three situations were analyzed. The result provides a theoretical basis and technical base for the application of prestressed tensioning method to the evaluation of construction quality and operation conditions of anchor cable project.展开更多
Factors such as errors during the fabrication or construction of structural components and errors of calculation as- sumption or calculation methods, are very likely to cause serious deviation of many strings’ actual...Factors such as errors during the fabrication or construction of structural components and errors of calculation as- sumption or calculation methods, are very likely to cause serious deviation of many strings’ actual prestressing forces from the designed values during tension structure construction or service period, and further to threaten the safety and reliability of the structure. Aiming at relatively large errors of the prestressing force of strings in a tension structure construction or service period, this paper proposes a new finite element method (FEM), the "tensile force correction calculation method". Based on the measured prestressing forces of the strings, this new method applies the structure from the zero prestressing force status approach to the measured prestressing force status for the first phase, and from the measured prestressing force status approach to the designed prestressing force status for the second phase. The construction tensile force correction value for each string can be obtained by multi-iteration with FEM. Using the results of calculation, the strings’ tensile force correction by group and in batch will be methodic, simple and accurate. This new calculation method can be applied to the prestressed correction construction simulation analysis for tension structures.展开更多
基金Funded by the Science and Technolog Program of Ministry of Transport of P.R.China(No.2012318352100)
文摘The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse stretching load is applied on the external exposure section of anchor cable under construction or in service, and then the elongation variation of stress bars is measured to determine the anchor stress. We elaborated the theory and testing mechanism of prestressed tensioning method, and systematically studied key issues during the prestressed tensioning process of anchor cable by using physical model test, including the composition of tension stress-elongation curve, the variation of anchor stress, the compensation of locked anchor stress, and the judgment of anchor stress, and verified the theory feasibility of prestressed tensioning method. A case study on slope anchor cable of one highway project was conducted to further discuss on the test method, operation procedures and judgment of prestressed tensioning method on obtaining anchor stress, and then the test data of three situations were analyzed. The result provides a theoretical basis and technical base for the application of prestressed tensioning method to the evaluation of construction quality and operation conditions of anchor cable project.
基金Project (No. 50678157) supported by the National Natural ScienceFoundation of China
文摘Factors such as errors during the fabrication or construction of structural components and errors of calculation as- sumption or calculation methods, are very likely to cause serious deviation of many strings’ actual prestressing forces from the designed values during tension structure construction or service period, and further to threaten the safety and reliability of the structure. Aiming at relatively large errors of the prestressing force of strings in a tension structure construction or service period, this paper proposes a new finite element method (FEM), the "tensile force correction calculation method". Based on the measured prestressing forces of the strings, this new method applies the structure from the zero prestressing force status approach to the measured prestressing force status for the first phase, and from the measured prestressing force status approach to the designed prestressing force status for the second phase. The construction tensile force correction value for each string can be obtained by multi-iteration with FEM. Using the results of calculation, the strings’ tensile force correction by group and in batch will be methodic, simple and accurate. This new calculation method can be applied to the prestressed correction construction simulation analysis for tension structures.