Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partit...Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partition the tunnel face and divide the excavation into multiple stages.However,these internal supports generally impose spatial constraints,limiting the use of large-scale excavation equipment and reducing construction efficiency.To address this constraint,this study adopts the“Shed-frame”principle to explore the feasibility of an innovative support system,which aims to replace internal supports with prestressed anchor cables and thus provide a more spacious working space with fewer internal obstructions.To evaluate its effectiveness,a field case involving the excavation of a 24-m span tunnel in soft rock is presented,and an analysis of extensive field data is conducted to study the deformation characteristics of the surrounding rock and the mechanical behavior of the support system.The results revealed that prestressed anchor cables integrated the initial support with the shed,creating an effective“shed-frame”system,which successively maintained tunnel deformation and frame stress levels within safe regulatory bounds.Moreover,the prestressed anchor cables bolstered the surrounding rock effectively and reduced the excavation-induced disturbance zone significantly.In summary,the proposed support system balances construction efficiency and safety.These field experiences may offer valuable insights into the popularization and further development of prestressed anchor cable support systems.展开更多
The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse ...The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse stretching load is applied on the external exposure section of anchor cable under construction or in service, and then the elongation variation of stress bars is measured to determine the anchor stress. We elaborated the theory and testing mechanism of prestressed tensioning method, and systematically studied key issues during the prestressed tensioning process of anchor cable by using physical model test, including the composition of tension stress-elongation curve, the variation of anchor stress, the compensation of locked anchor stress, and the judgment of anchor stress, and verified the theory feasibility of prestressed tensioning method. A case study on slope anchor cable of one highway project was conducted to further discuss on the test method, operation procedures and judgment of prestressed tensioning method on obtaining anchor stress, and then the test data of three situations were analyzed. The result provides a theoretical basis and technical base for the application of prestressed tensioning method to the evaluation of construction quality and operation conditions of anchor cable project.展开更多
A new method for determining the incremental cohesion △Cm of surrounding rock due to prestressed cable anchor is presented, and the formulas for △Cm are deduced and △Cm distributions also are discussed, based on th...A new method for determining the incremental cohesion △Cm of surrounding rock due to prestressed cable anchor is presented, and the formulas for △Cm are deduced and △Cm distributions also are discussed, based on the two anchorage effects, one is the effect with the prestressed vaIue △σ3 of cable anchor improving the stress state of surrounding rock and increasing the surrounding rock strength, the other is the fully encapsulated effect. The determined incremental cohesion △Cm is subiected to the model test and field measurement in the references, and coincides well with those tested results. The formulas for △Cm can be used in designing supoport parameters and related numerical analyses of prestressed cable anchor.展开更多
To obtain the deep displacement of the coal seam in the working face,multi-point displacements were installed in the coal seam, but the installation of multi-point displacement is differen tunder different geological ...To obtain the deep displacement of the coal seam in the working face,multi-point displacements were installed in the coal seam, but the installation of multi-point displacement is differen tunder different geological conditions. This paper is based on the splitting and merging of 7_1 coal and 7_2 coal in Huaibei Mining(Group) Co., Ltd., and analyzes properties of the roof andcoal in the 7_2 coal of the lower coal seam of bifurcation area, and calculates the damage depth of the floor in the process of 7_1 coal mining. The multi-point displacement meter installation is often challenged by hole collapse, stuck pole and broken installation rod in 7_2 coal of the soft coal seam of bifurcation area, as a result, the base points can't be installed in the specified location. In view of this, this paper adopts a new anchor cable mounting rod which can install the whole base points to the specified location without stuck pole or broken mounting stem. All the basic displacement data can be obtained, and the law of mine pressure appearance in stope and tunnel can be accurately controlled, which can be used to maintain the stability of roadway and the safety of stope.展开更多
Prestressed anchor cables are widely used for slope reinforcement,but the loss of prestress makes it difficult to guarantee the reinforcement effect.Anchor cable prestress degradation was considered as a stochastic pr...Prestressed anchor cables are widely used for slope reinforcement,but the loss of prestress makes it difficult to guarantee the reinforcement effect.Anchor cable prestress degradation was considered as a stochastic process,and the probability density function of this process was established using gamma theory and impact theory respectively.Combined with the failure threshold,the probability density was integrated to find the time-dependent reliability of the anchor cable.Based on the monitoring data of the prestress degradation of the anchor cable,parameters in the probability density function were solved by the maximum likelihood method,and the time-varying reliability and service life of the anchor cable were obtained analytically.The applicability of two degradation theories,gamma stochastic process and impact theory,was compared.The results showed that the probability density curves of both degradation models were normally distributed and the error of reliability results did not exceed 0.06.The life prediction results of the gamma stochastic process were closer to the actual life of 400 h than the 500 h of the impact theory,and the probability curves of the anchor cable life also indicated that the impact theory overestimated the service life probability of the anchor cable.Taking the anchor cable reinforcement within the slope of the Dagushan open-pit mine as an example,and the results verify the feasibility of using gamma theory to predict the degradation of anchor cables and provides theoretical support for prevention of the degradation of anchor cables in the slope of an open-pit mine under the action of external forces.展开更多
基金supported by the National Natural Science Foundation of China through Grant No.51978523.
文摘Excavating super-large-span tunnels in soft rock masses presents significant challenges.To ensure safety,the sequential excavation method is commonly adopted.It utilizes internal temporary supports to spatially partition the tunnel face and divide the excavation into multiple stages.However,these internal supports generally impose spatial constraints,limiting the use of large-scale excavation equipment and reducing construction efficiency.To address this constraint,this study adopts the“Shed-frame”principle to explore the feasibility of an innovative support system,which aims to replace internal supports with prestressed anchor cables and thus provide a more spacious working space with fewer internal obstructions.To evaluate its effectiveness,a field case involving the excavation of a 24-m span tunnel in soft rock is presented,and an analysis of extensive field data is conducted to study the deformation characteristics of the surrounding rock and the mechanical behavior of the support system.The results revealed that prestressed anchor cables integrated the initial support with the shed,creating an effective“shed-frame”system,which successively maintained tunnel deformation and frame stress levels within safe regulatory bounds.Moreover,the prestressed anchor cables bolstered the surrounding rock effectively and reduced the excavation-induced disturbance zone significantly.In summary,the proposed support system balances construction efficiency and safety.These field experiences may offer valuable insights into the popularization and further development of prestressed anchor cable support systems.
基金Funded by the Science and Technolog Program of Ministry of Transport of P.R.China(No.2012318352100)
文摘The anchor stress extent of a prestress anchor cable project has a direct relation with the project safety and performance. Prestressed tensioning method is a kind of nondestructive testing method, by which a reverse stretching load is applied on the external exposure section of anchor cable under construction or in service, and then the elongation variation of stress bars is measured to determine the anchor stress. We elaborated the theory and testing mechanism of prestressed tensioning method, and systematically studied key issues during the prestressed tensioning process of anchor cable by using physical model test, including the composition of tension stress-elongation curve, the variation of anchor stress, the compensation of locked anchor stress, and the judgment of anchor stress, and verified the theory feasibility of prestressed tensioning method. A case study on slope anchor cable of one highway project was conducted to further discuss on the test method, operation procedures and judgment of prestressed tensioning method on obtaining anchor stress, and then the test data of three situations were analyzed. The result provides a theoretical basis and technical base for the application of prestressed tensioning method to the evaluation of construction quality and operation conditions of anchor cable project.
文摘A new method for determining the incremental cohesion △Cm of surrounding rock due to prestressed cable anchor is presented, and the formulas for △Cm are deduced and △Cm distributions also are discussed, based on the two anchorage effects, one is the effect with the prestressed vaIue △σ3 of cable anchor improving the stress state of surrounding rock and increasing the surrounding rock strength, the other is the fully encapsulated effect. The determined incremental cohesion △Cm is subiected to the model test and field measurement in the references, and coincides well with those tested results. The formulas for △Cm can be used in designing supoport parameters and related numerical analyses of prestressed cable anchor.
基金Sponsored by National Natural Science Fund of China(51474005)
文摘To obtain the deep displacement of the coal seam in the working face,multi-point displacements were installed in the coal seam, but the installation of multi-point displacement is differen tunder different geological conditions. This paper is based on the splitting and merging of 7_1 coal and 7_2 coal in Huaibei Mining(Group) Co., Ltd., and analyzes properties of the roof andcoal in the 7_2 coal of the lower coal seam of bifurcation area, and calculates the damage depth of the floor in the process of 7_1 coal mining. The multi-point displacement meter installation is often challenged by hole collapse, stuck pole and broken installation rod in 7_2 coal of the soft coal seam of bifurcation area, as a result, the base points can't be installed in the specified location. In view of this, this paper adopts a new anchor cable mounting rod which can install the whole base points to the specified location without stuck pole or broken mounting stem. All the basic displacement data can be obtained, and the law of mine pressure appearance in stope and tunnel can be accurately controlled, which can be used to maintain the stability of roadway and the safety of stope.
基金supported by the National Natural Science Foundation of China(No.52074292)National Key Research and Development Program(No.2017YFC1503103)。
文摘Prestressed anchor cables are widely used for slope reinforcement,but the loss of prestress makes it difficult to guarantee the reinforcement effect.Anchor cable prestress degradation was considered as a stochastic process,and the probability density function of this process was established using gamma theory and impact theory respectively.Combined with the failure threshold,the probability density was integrated to find the time-dependent reliability of the anchor cable.Based on the monitoring data of the prestress degradation of the anchor cable,parameters in the probability density function were solved by the maximum likelihood method,and the time-varying reliability and service life of the anchor cable were obtained analytically.The applicability of two degradation theories,gamma stochastic process and impact theory,was compared.The results showed that the probability density curves of both degradation models were normally distributed and the error of reliability results did not exceed 0.06.The life prediction results of the gamma stochastic process were closer to the actual life of 400 h than the 500 h of the impact theory,and the probability curves of the anchor cable life also indicated that the impact theory overestimated the service life probability of the anchor cable.Taking the anchor cable reinforcement within the slope of the Dagushan open-pit mine as an example,and the results verify the feasibility of using gamma theory to predict the degradation of anchor cables and provides theoretical support for prevention of the degradation of anchor cables in the slope of an open-pit mine under the action of external forces.