Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. O...Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PR action was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model.展开更多
We consider a replacement policy for a multiple-component cold-standbysystem, and after we analyze this policy, we want to get the mean total cost rate and the preventivepolicy to make it the lowest. In this system, t...We consider a replacement policy for a multiple-component cold-standbysystem, and after we analyze this policy, we want to get the mean total cost rate and the preventivepolicy to make it the lowest. In this system, the failure rate of the component in operation isconstant, and the inspection will control all the processes of the operation. The system isinspected at random points over time to determine whether it is to be replaced. During the process,the replacement decision is based on the number of failed components at the time of inspection.展开更多
The inspection activities are often carried out to detect possible indication of failures in plant systems.This paper considers a single unit system subject to two types of failures, where one failure mode is the trad...The inspection activities are often carried out to detect possible indication of failures in plant systems.This paper considers a single unit system subject to two types of failures, where one failure mode is the traditional0-1 logic failure and the other failure mode is described by a two-stage failure process. Adjustable inspections are used to detect the defective stage of the latter. We assume that the inspection duration gets shorter and shorter with a constant ratio. At the same time, preventive replacement is used to avoid the possible failure due to the former failure mode. The renewal process of this system is analyzed and the expected long-run cost per unit time(ELRCUT) is derived. The optimal inspection period and the preventive replacement interval to minimize ELRCUT are studied. At last, a numerical example is presented to illustrate the proposed model.展开更多
基金National Natural Science Foundation of China(NSFC)(No.71231001)China Postdoctoral Science Foundation Funded Project(No.2013M530531)+1 种基金the Fundamental Research Funds for the Central Universities of China(Nos.FRF-M P-13-009A,FRF-TP-13-026A)the MOE PhD Supervisor Fund,China(No.20120006110025)
文摘Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PR action was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model.
文摘We consider a replacement policy for a multiple-component cold-standbysystem, and after we analyze this policy, we want to get the mean total cost rate and the preventivepolicy to make it the lowest. In this system, the failure rate of the component in operation isconstant, and the inspection will control all the processes of the operation. The system isinspected at random points over time to determine whether it is to be replaced. During the process,the replacement decision is based on the number of failed components at the time of inspection.
基金the National Natural Science Foundation of China(Nos.71231001,71301009 and71420107023)Ministry of Education Doctor of Philosophy Supervisor Fund of China(No.20120006110025)the Fundamental Research Funds for the Central Universities of China(No.Fl TR-TP-15-031A3)
文摘The inspection activities are often carried out to detect possible indication of failures in plant systems.This paper considers a single unit system subject to two types of failures, where one failure mode is the traditional0-1 logic failure and the other failure mode is described by a two-stage failure process. Adjustable inspections are used to detect the defective stage of the latter. We assume that the inspection duration gets shorter and shorter with a constant ratio. At the same time, preventive replacement is used to avoid the possible failure due to the former failure mode. The renewal process of this system is analyzed and the expected long-run cost per unit time(ELRCUT) is derived. The optimal inspection period and the preventive replacement interval to minimize ELRCUT are studied. At last, a numerical example is presented to illustrate the proposed model.