期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
STUDY ON GREY FORECASTING MODEL OF COPPER EXTRACTION RATE WITH BIOLEACHING OF PRIMARY SULFIDE ORE 被引量:2
1
作者 A.X. Wu Y. Xi +2 位作者 B.H. Yang X.S. Chen H.C. Jiang 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2007年第2期117-128,共12页
A model GM (grey model) (1,1) for forecasting the rate of copper extraction during the bioleaching of primary sulphide ore was established on the basis of the mathematical theory and the modeling process of grey s... A model GM (grey model) (1,1) for forecasting the rate of copper extraction during the bioleaching of primary sulphide ore was established on the basis of the mathematical theory and the modeling process of grey system theory. It was used for forecasting the rate of copper extraction from the primary sulfide ore during a laboratory microbial column leaching experiment. The precision of the forecasted results were examined and modified via "posterior variance examination". The results show that the forecasted values coincide with the experimental values. GM (1,1) model has high forecast accuracy; and it is suitable for simulation control and prediction analysis of the original data series of the processes that have grey characteristics, such as mining, metallurgical and mineral processing, etc. The leaching rate of such copper sulphide ore is low. The grey forecasting result indicates that the rate of copper extraction is approximately 20% even after leaching for six months. 展开更多
关键词 primary copper sulfide ore BIOLEACHING extraction rate grey theory forecasting model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部