Mesoporous aluminosilicate with cubic ordered structure was synthesized by two-step crystallization, which showed stronger acid sites and more effective activity for catalytic alkylation of 2, 4-ditert-butylphenol wit...Mesoporous aluminosilicate with cubic ordered structure was synthesized by two-step crystallization, which showed stronger acid sites and more effective activity for catalytic alkylation of 2, 4-ditert-butylphenol with tert-butanol than conventional H-AlMCM-48 materials.展开更多
Leadership in Energy and Environmental Design Commercial Interiors (LEED-CI) is more relevant to interior design, which, according to the sharing layer concept, differs from exterior design (which is usually evaluated...Leadership in Energy and Environmental Design Commercial Interiors (LEED-CI) is more relevant to interior design, which, according to the sharing layer concept, differs from exterior design (which is usually evaluated with the LEED New Construction sub-scheme). LEED-CI requires separate empirical analyses of LEED-CI certified buildings to further improve this sub-scheme. Therefore, in this study, Silver and Gold projects certified under LEED-CI-2009 in 14 US states were considered. Three project performance analyses, (i) certification, (ii) category, and (iii) cross-certification, were studied. The following results were revealed: (i) the range of the medians for Silver- and Gold-certified projects were 51-57 pts and 62-71 pts, respectively;(ii) in both Silver- and Gold-certified projects, Sustainable Sites (SS), Water Efficiency (WE), and Innovation in Design (ID) were the best-performing;Energy and Atmosphere (EA) and Indoor Environmental Quality (EQ) were intermediate-performing;and Material and Resources (MR) was the worst-performing categories;and (iii) in Silver-Gold cross-certification, category-focused (in 10 of 14 states) and category-unfocused (in four of 14 states) strategies were determined;in the category-focused strategy, the highest popular category was EA;the intermediate popular categories were WE, MR, and ID;and the lowest popular category was SS. Pooling all projects and all states into one frame can lead to the obscurement of the actual LEED-CI-2009 strategy(ies) in the transition from Silver to Gold certification in the US.展开更多
基金We thank financial support by the National Natural Science Foundation of China(grant 29973001).
文摘Mesoporous aluminosilicate with cubic ordered structure was synthesized by two-step crystallization, which showed stronger acid sites and more effective activity for catalytic alkylation of 2, 4-ditert-butylphenol with tert-butanol than conventional H-AlMCM-48 materials.
文摘Leadership in Energy and Environmental Design Commercial Interiors (LEED-CI) is more relevant to interior design, which, according to the sharing layer concept, differs from exterior design (which is usually evaluated with the LEED New Construction sub-scheme). LEED-CI requires separate empirical analyses of LEED-CI certified buildings to further improve this sub-scheme. Therefore, in this study, Silver and Gold projects certified under LEED-CI-2009 in 14 US states were considered. Three project performance analyses, (i) certification, (ii) category, and (iii) cross-certification, were studied. The following results were revealed: (i) the range of the medians for Silver- and Gold-certified projects were 51-57 pts and 62-71 pts, respectively;(ii) in both Silver- and Gold-certified projects, Sustainable Sites (SS), Water Efficiency (WE), and Innovation in Design (ID) were the best-performing;Energy and Atmosphere (EA) and Indoor Environmental Quality (EQ) were intermediate-performing;and Material and Resources (MR) was the worst-performing categories;and (iii) in Silver-Gold cross-certification, category-focused (in 10 of 14 states) and category-unfocused (in four of 14 states) strategies were determined;in the category-focused strategy, the highest popular category was EA;the intermediate popular categories were WE, MR, and ID;and the lowest popular category was SS. Pooling all projects and all states into one frame can lead to the obscurement of the actual LEED-CI-2009 strategy(ies) in the transition from Silver to Gold certification in the US.