期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Chronically Evaluated Highest Instantaneous Priority Next: A Novel Algorithm for Processor Scheduling
1
作者 Amit Pandey Pawan Singh +1 位作者 Nirayo H. Gebreegziabher Abdella Kemal 《Journal of Computer and Communications》 2016年第4期146-159,共14页
This paper proposes a novel chronically evaluated highest instantaneous priority next processor scheduling algorithm. The currently existing algorithms like first come first serve, shortest job first, round-robin, sho... This paper proposes a novel chronically evaluated highest instantaneous priority next processor scheduling algorithm. The currently existing algorithms like first come first serve, shortest job first, round-robin, shortest remaining time first, highest response ratio next and varying response ratio priority algorithm have some problems associated with them. Some of them can lead to endless waiting or starvation and some of them like round-robin has problem of too many context switches and high waiting time associated with them. In the proposed algorithm, we have taken care of all such problems. As the novel algorithm is capable of achieving as good results as shortest remaining time first algorithm and also it will never lead to starvation. 展开更多
关键词 Chronically Evaluated Highest Instantaneous priority Next CEHIPN priority scheduling Preemptive scheduling Processor scheduling STARVATION
下载PDF
NEW NONSTANDARD JOB SHOP SCHEDULING ALGORITHM 被引量:10
2
作者 XIE Zhiqiang YE Guangjie +1 位作者 ZHANG Dali TAN Guangyu 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2008年第4期97-100,共4页
Considering the complex constraint between operations in nonstandard job shop scheduling problem (NJSSP), critical path of job manufacturing tree is determined according to priority scheduling function constructed. ... Considering the complex constraint between operations in nonstandard job shop scheduling problem (NJSSP), critical path of job manufacturing tree is determined according to priority scheduling function constructed. Operations are divided into dependent operations and independent operations with the idea of subsection, and corresponding scheduling strategy is put forward according to operation characteristic in the segment and the complementarities of identical function machines. Forward greedy rule is adopted mainly for dependent operations to make operations arranged in the right position of machine selected, then each operation can be processed as early as possible, and the total processing time of job can be shortened as much as possible. For independent operations optimum scheduling rule is adopted mainly, the inserting position of operations will be determined according to the gap that the processing time of operations is subtracted from idle time of machine, and the operation will be inserted in the position with minimal gap. Experiments show, under the same conditions, the result that operations are scheduled according to the object function constructed, and the scheduling strategy adopted is better than the result that operations are scheduled according to efficiency scheduling algorithm. 展开更多
关键词 Nonstandard job shop scheduling priority scheduling function Subsection Forward greedy rule Optimum scheduling rule
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部