With the further development of urbanization,the conflicts between human beings and the nature has been gradually aggravated;it is urgent to establish balanced natural ecology in the process of urbanization,and harmon...With the further development of urbanization,the conflicts between human beings and the nature has been gradually aggravated;it is urgent to establish balanced natural ecology in the process of urbanization,and harmony between human beings and environment.This study took the ecological landscape project of Shanghai A20 Out Ring (Changning Section) for an example to research and rethink about the ecological construction in the process of urbanization.展开更多
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the u...A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.展开更多
In recent years,it is the general trend to adopt the standards of international engineering education certification to construct curriculum.“Software Process and Tools”is one of the core courses of Harbin Institute ...In recent years,it is the general trend to adopt the standards of international engineering education certification to construct curriculum.“Software Process and Tools”is one of the core courses of Harbin Institute of Technology’s software engineering undergraduate training program.Focusing on the construction work and practical exploration of the course in the process of reforming the software engineering professional curriculum system,and how to achieve the standards of engineering education certification,This paper makes a review and summary.This paper focuses on the status and the role of the course in the whole curriculum system,as well as project-driven teaching content design and practical teaching methods.And summarizes the experience and results of 3 rounds of teaching practice.展开更多
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ...In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.展开更多
The index system, code system, and weights of indexes are established to assess the effects of green construction. The index system consists of index level, factor level and sub-factor level. The analytic hierarchy pr...The index system, code system, and weights of indexes are established to assess the effects of green construction. The index system consists of index level, factor level and sub-factor level. The analytic hierarchy process is used to determine the weights of indexes, and the consistency test indicate that the weight assignment is reasonable. Using fuzzy synthetic judgment method, the assessment model is built, which includes factor set, weight set and conclusion set. An example is given to demonstrate the assessment procedures.展开更多
Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platf...Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.展开更多
Highway is an important channel to connect regional economic development,and is an indispensable part of modern transportation system.In view of the extensive nature of highway cover space and the existence of diversi...Highway is an important channel to connect regional economic development,and is an indispensable part of modern transportation system.In view of the extensive nature of highway cover space and the existence of diversified construction environment,climate and geological influence in highway construction,soft soil foundation is one of the more typical geological forms.With wide distribution in our country,seen as a big difficulty,highway construction technology and directly affect the quality of highway construction,cost,if not properly handled,will cause the soft soil foundation highway engineering structure is not stable,prone to accidents in use.In this paper,we study the treatment of soft soil foundation in highway construction,and put forward some reasonable Suggestions.展开更多
The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most cr...The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.展开更多
In order to improve the efficiency of EPS integral thermal insulation building design and optimize the construction process of insulation construction, this paper uses experiment parts and simulation form to design th...In order to improve the efficiency of EPS integral thermal insulation building design and optimize the construction process of insulation construction, this paper uses experiment parts and simulation form to design the thermal insulation construction process, and evaluates the effect of heat preservation. Based on the finite element theory this paper designs adding process of insulation material EPS in the thermal insulation layer, and establishes the radiation heat conduction model of EPS material, finally obtains the solid heat conduction equation. Finally this paper uses ANSYS software to do simulation on the strength and temperature of EPS construction, and evaluates the quality of construction works, which provides technical reference for the design of integrated thermal insulation buildings.展开更多
in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the ...in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.展开更多
This paper analyses the composition, the overall importance of city infrastructure construction and promote the city in the process of meaning. Then analysis the importance of city traffic infrastructure construction,...This paper analyses the composition, the overall importance of city infrastructure construction and promote the city in the process of meaning. Then analysis the importance of city traffic infrastructure construction, the vanity of the city infrastructure and social infrastructure in the process of city, and puts forward relying on infrastructure construction to promote the urbanization development strategy.展开更多
Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Ag...Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Agency(EMA),Health Canada(HC)and National Health Commission,the good experience of the United States,the European Union and Canada in the construction of information platform and processing mechanism of drug shortages was summarized for reference in China.Results and Conclusion China has initially established the processing mechanism of drug shortages,but the platform construction should be improved,and the information disclosure of drug shortages varies from province to province.We should improve the information platform of drug shortages,strengthen the disclosure and communication of information,enrich the processing tools and measures after the drug shortages occurs,and strengthen the cooperation with relevant associations and other non-governmental departments.展开更多
“Cantonese Cuisine Master”project is an important policy proposed by China to inherit Cantonese Cuisine culture,promote employment,and achieve targeted poverty reduction and rural revitalization.Confronted with the ...“Cantonese Cuisine Master”project is an important policy proposed by China to inherit Cantonese Cuisine culture,promote employment,and achieve targeted poverty reduction and rural revitalization.Confronted with the demands of more diverse education,it is an essential opportunity and task for the education system to consider how to construct high-quality online courses and pursue higher-quality“Cantonese Cuisine Master”projects in line with the new era.This paper,based on the theory of instructional media and information processing theory,will further clarify the demand,dilemma,and developing strategy of online course construction for culinary majors,and explore its construction and practice with the example of“A Bite of Teochew Cuisine,”a Guangdong first-class course.展开更多
W25 was a gamma-irradiation induced albinorice mutant line, which only expressed in thespecial temperatures (see figure). At 30 Cand 35 C, the seedling leaves of W25 showedgreenish or normal green, but they exhibiteda...W25 was a gamma-irradiation induced albinorice mutant line, which only expressed in thespecial temperatures (see figure). At 30 Cand 35 C, the seedling leaves of W25 showedgreenish or normal green, but they exhibitedalbino at 25℃, which could be greenish afterthe fourth leaf extension and recovered to be展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan...In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.展开更多
In this paper, 2201 and 2212 phases as the corresponding precursor of forming 2212 and 2223 phases are discussed,and the constructive process of unit cell of 2201 phase is ascertained by XRD and chemical kinetics me...In this paper, 2201 and 2212 phases as the corresponding precursor of forming 2212 and 2223 phases are discussed,and the constructive process of unit cell of 2201 phase is ascertained by XRD and chemical kinetics method. Subsequently, the process of 221展开更多
[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in "rianjin area. [Method] In view of climate characteristics in Tianjin, by the way of running under the ice, ...[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in "rianjin area. [Method] In view of climate characteristics in Tianjin, by the way of running under the ice, winter operation experiment of the surface flow constructed wetland in Tianjin was conducted, with the expectation to get some useful process parameters to run such systems in North China in winter. [ Result] Although purification effect of the sewage by surface flow constructed wetland in winter was worse than that in other seasons ( average reduction of about 20%), surface flow constructed wetland running under the ice was feasible in Tianjin area. When surface flow constructed wetland in North China ran under ice in winter, it was suggested that the outlet must be located in a low position to prevent to be completely frozen, and running water depth should not be less than 50 -60 cm. The hydraulic load could be raised on the basis of reflux, and hydraulic retention time should maintain less than 4 d to keep water-soil interface not freezing. Inlet water depth should be increased as much as possible to improve temperature in the system. V Conclusion1 The research could provide reference for promotion and application of the surface flow constructed wetland in North China.展开更多
By combining sequencing batch reactor (SBR) activated sludge process and constructed wetland (CW), this study is to achieve the domestic wastewater treatment. Our purpose was to determine the optimum operating paramet...By combining sequencing batch reactor (SBR) activated sludge process and constructed wetland (CW), this study is to achieve the domestic wastewater treatment. Our purpose was to determine the optimum operating parameters of the combined process. The process involved advantages and shortages of SBR and CW. Under normal temperature, the 3rd cycle (SBR’s operation cycle is 8 h: inflow for 1 h, limited aeration for 3 h, sediment for 1 h, outflow for 1 h, and idling for 2 h; CW’s hydraulic retention time (HRT) is 24.8 h and hydraulic loading is 24.5 m3/m2 d) was the best cyclic mode. The effluents can meet the standard GB/T18921-2002: "The reuse of urban recycling water: water quality standard for scenic environment use". In the 3rd cycle, the efficiency of CW was the maximum, and energy consumption of SBR was the minimum. Under the condition of low dissolved oxygen, the removing efficiency of chemical oxygen demand (COD) and ammonia was not affected obviously. Simultaneously, nitrification and denitrification phenomena occured and phosphorus was absorbed obviously.展开更多
文摘With the further development of urbanization,the conflicts between human beings and the nature has been gradually aggravated;it is urgent to establish balanced natural ecology in the process of urbanization,and harmony between human beings and environment.This study took the ecological landscape project of Shanghai A20 Out Ring (Changning Section) for an example to research and rethink about the ecological construction in the process of urbanization.
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
基金Scientific and Technological Support and Guidance Plan Projects of Zhejiang Province(Grant No.2008C23019)
文摘A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.
文摘In recent years,it is the general trend to adopt the standards of international engineering education certification to construct curriculum.“Software Process and Tools”is one of the core courses of Harbin Institute of Technology’s software engineering undergraduate training program.Focusing on the construction work and practical exploration of the course in the process of reforming the software engineering professional curriculum system,and how to achieve the standards of engineering education certification,This paper makes a review and summary.This paper focuses on the status and the role of the course in the whole curriculum system,as well as project-driven teaching content design and practical teaching methods.And summarizes the experience and results of 3 rounds of teaching practice.
基金Key Subject of Ministry of Railway Technology Research and Development Program(No.2011G010-D)Central University Funds for Basic Research(No.SWJTU12ZT12)
文摘In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.
基金The Doctoral Program of Higher Educa-tion Institution of China (No.20050487017)
文摘The index system, code system, and weights of indexes are established to assess the effects of green construction. The index system consists of index level, factor level and sub-factor level. The analytic hierarchy process is used to determine the weights of indexes, and the consistency test indicate that the weight assignment is reasonable. Using fuzzy synthetic judgment method, the assessment model is built, which includes factor set, weight set and conclusion set. An example is given to demonstrate the assessment procedures.
基金funded by Ministry of Industry and Information Technology of the People’s Republic of China[Grant No.2018473].
文摘Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.
文摘Highway is an important channel to connect regional economic development,and is an indispensable part of modern transportation system.In view of the extensive nature of highway cover space and the existence of diversified construction environment,climate and geological influence in highway construction,soft soil foundation is one of the more typical geological forms.With wide distribution in our country,seen as a big difficulty,highway construction technology and directly affect the quality of highway construction,cost,if not properly handled,will cause the soft soil foundation highway engineering structure is not stable,prone to accidents in use.In this paper,we study the treatment of soft soil foundation in highway construction,and put forward some reasonable Suggestions.
文摘The design process of the built environment relies on the collaborative effort of all parties involved in the project.During the design phase,owners,end users,and their representatives are expected to make the most critical design and budgetary decisions-shaping the essential traits of the project,hence emerge the need and necessity to create and integrate mechanisms to support the decision-making process.Design decisions should not be based on assumptions,past experiences,or imagination.An example of the numerous problems that are a result of uninformed design decisions is“change orders”,known as the deviation from the original scope of work,which leads to an increase of the overall cost,and changes to the construction schedule of the project.The long-term aim of this inquiry is to understand the user’s behavior,and establish evidence-based control measures,which are actions and processes that can be implemented in practice to decrease the volume and frequency of the occurrence of change orders.The current study developed a foundation for further examination by proposing potential control measures,and testing their efficiency,such as integrating Virtual Reality(VR).The specific aim was to examine the effect of different visualization methods(i.e.,VR vs.construction drawings)on,(1)how well the subjects understand the information presented about the future/planned environment;(2)the subjects’perceived confidence in what the future environment will look like;(3)the likelihood of changing the built environment;(4)design review time;and(5)accuracy in reviewing and understanding the design.
文摘In order to improve the efficiency of EPS integral thermal insulation building design and optimize the construction process of insulation construction, this paper uses experiment parts and simulation form to design the thermal insulation construction process, and evaluates the effect of heat preservation. Based on the finite element theory this paper designs adding process of insulation material EPS in the thermal insulation layer, and establishes the radiation heat conduction model of EPS material, finally obtains the solid heat conduction equation. Finally this paper uses ANSYS software to do simulation on the strength and temperature of EPS construction, and evaluates the quality of construction works, which provides technical reference for the design of integrated thermal insulation buildings.
文摘in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.
文摘This paper analyses the composition, the overall importance of city infrastructure construction and promote the city in the process of meaning. Then analysis the importance of city traffic infrastructure construction, the vanity of the city infrastructure and social infrastructure in the process of city, and puts forward relying on infrastructure construction to promote the urbanization development strategy.
文摘Objective To study how to improve and perfect the information platform and processing mechanism of drug shortages in China.Methods By searching the relevant policies from official websites of FDA,European Medicines Agency(EMA),Health Canada(HC)and National Health Commission,the good experience of the United States,the European Union and Canada in the construction of information platform and processing mechanism of drug shortages was summarized for reference in China.Results and Conclusion China has initially established the processing mechanism of drug shortages,but the platform construction should be improved,and the information disclosure of drug shortages varies from province to province.We should improve the information platform of drug shortages,strengthen the disclosure and communication of information,enrich the processing tools and measures after the drug shortages occurs,and strengthen the cooperation with relevant associations and other non-governmental departments.
基金The research result of“A Bite of Teochew Cuisine”of Guangdong Quality Project(Open Online Course)“The Creation of Excellent Science Popularization Works for Chinese Molecular Cooking Micro-course”of Guangdong Science and Technology Program(Project No.:2019A141405059).
文摘“Cantonese Cuisine Master”project is an important policy proposed by China to inherit Cantonese Cuisine culture,promote employment,and achieve targeted poverty reduction and rural revitalization.Confronted with the demands of more diverse education,it is an essential opportunity and task for the education system to consider how to construct high-quality online courses and pursue higher-quality“Cantonese Cuisine Master”projects in line with the new era.This paper,based on the theory of instructional media and information processing theory,will further clarify the demand,dilemma,and developing strategy of online course construction for culinary majors,and explore its construction and practice with the example of“A Bite of Teochew Cuisine,”a Guangdong first-class course.
文摘W25 was a gamma-irradiation induced albinorice mutant line, which only expressed in thespecial temperatures (see figure). At 30 Cand 35 C, the seedling leaves of W25 showedgreenish or normal green, but they exhibitedalbino at 25℃, which could be greenish afterthe fourth leaf extension and recovered to be
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
文摘In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.
文摘In this paper, 2201 and 2212 phases as the corresponding precursor of forming 2212 and 2223 phases are discussed,and the constructive process of unit cell of 2201 phase is ascertained by XRD and chemical kinetics method. Subsequently, the process of 221
基金Supported by Special Project of the Science Research in Public Service Industry,Ministry of Water Resources,China(2011-BH140002)
文摘[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in "rianjin area. [Method] In view of climate characteristics in Tianjin, by the way of running under the ice, winter operation experiment of the surface flow constructed wetland in Tianjin was conducted, with the expectation to get some useful process parameters to run such systems in North China in winter. [ Result] Although purification effect of the sewage by surface flow constructed wetland in winter was worse than that in other seasons ( average reduction of about 20%), surface flow constructed wetland running under the ice was feasible in Tianjin area. When surface flow constructed wetland in North China ran under ice in winter, it was suggested that the outlet must be located in a low position to prevent to be completely frozen, and running water depth should not be less than 50 -60 cm. The hydraulic load could be raised on the basis of reflux, and hydraulic retention time should maintain less than 4 d to keep water-soil interface not freezing. Inlet water depth should be increased as much as possible to improve temperature in the system. V Conclusion1 The research could provide reference for promotion and application of the surface flow constructed wetland in North China.
基金Funded by Sustainable Water Management Improves Tomorrow’s City’s Health (SWITCH018530)
文摘By combining sequencing batch reactor (SBR) activated sludge process and constructed wetland (CW), this study is to achieve the domestic wastewater treatment. Our purpose was to determine the optimum operating parameters of the combined process. The process involved advantages and shortages of SBR and CW. Under normal temperature, the 3rd cycle (SBR’s operation cycle is 8 h: inflow for 1 h, limited aeration for 3 h, sediment for 1 h, outflow for 1 h, and idling for 2 h; CW’s hydraulic retention time (HRT) is 24.8 h and hydraulic loading is 24.5 m3/m2 d) was the best cyclic mode. The effluents can meet the standard GB/T18921-2002: "The reuse of urban recycling water: water quality standard for scenic environment use". In the 3rd cycle, the efficiency of CW was the maximum, and energy consumption of SBR was the minimum. Under the condition of low dissolved oxygen, the removing efficiency of chemical oxygen demand (COD) and ammonia was not affected obviously. Simultaneously, nitrification and denitrification phenomena occured and phosphorus was absorbed obviously.