[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in "rianjin area. [Method] In view of climate characteristics in Tianjin, by the way of running under the ice, ...[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in "rianjin area. [Method] In view of climate characteristics in Tianjin, by the way of running under the ice, winter operation experiment of the surface flow constructed wetland in Tianjin was conducted, with the expectation to get some useful process parameters to run such systems in North China in winter. [ Result] Although purification effect of the sewage by surface flow constructed wetland in winter was worse than that in other seasons ( average reduction of about 20%), surface flow constructed wetland running under the ice was feasible in Tianjin area. When surface flow constructed wetland in North China ran under ice in winter, it was suggested that the outlet must be located in a low position to prevent to be completely frozen, and running water depth should not be less than 50 -60 cm. The hydraulic load could be raised on the basis of reflux, and hydraulic retention time should maintain less than 4 d to keep water-soil interface not freezing. Inlet water depth should be increased as much as possible to improve temperature in the system. V Conclusion1 The research could provide reference for promotion and application of the surface flow constructed wetland in North China.展开更多
Ethylene cracking process is the core production process in ethylene industry,and is paid more attention to reduce high energy consumption.Because of the interdependent relationships between multi-flow allocation and ...Ethylene cracking process is the core production process in ethylene industry,and is paid more attention to reduce high energy consumption.Because of the interdependent relationships between multi-flow allocation and multi-parameter setting in cracking process,it is difficult to find the overall energy efficiency scheduling for the purpose of saving energy.The traditional scheduling solutions with optimal economic benefit are not applicable for energy efficiency scheduling issue due to the neglecting of recycle and lost energy,as well as critical operation parameters as coil outlet pressure(COP)and dilution ratio.In addition,the scheduling solutions mostly regard each cracking furnace as an elementary unit,regardless of the coordinated operation of internal dual radiation chambers(DRC).Therefore,to improve energy utilization and production operation,a novel energy efficiency scheduling solution for ethylene cracking process is proposed in this paper.Specifically,steam heat recycle and exhaust heat loss are considered in cracking process based on 6 types of extreme learning machine(ELM)based cracking models incorporating DRC operation and three operation parameters as coil outlet temperature(COT),COP,and dilution ratio according to semi-mechanism analysis.Then to provide long-term decision-making basis for energy efficiency scheduling,overall energy efficiency indexes,including overall output per unit net energy input(OONE),output-input ratio per unit net energy input(ORNE),exhaust gas heat loss ratio(EGHL),are designed based on input-output analysis in terms of material and energy flows.Finally,a multiobjective evolutionary algorithm based on decomposition(MOEA/D)is employed to solve the formulated multi-objective mixed-integer nonlinear programming(MOMINLP)model.The validities of the proposed scheduling solution are illustrated through a case study.The scheduling results demonstrate that an optimal balance between multi-flow allocation,multi-parameter setting,and DRC coordinated operation is reached,which achieves 3.37%and 2.63%decreases in net energy input for same product output and conversion ratio,as well as the 1.56%decrease in energy loss ratio.展开更多
We continue studying systems whose state depends on time and whose resources are renewably based on functional operators with shift. In previous articles, we considered the term which described results of reproductive...We continue studying systems whose state depends on time and whose resources are renewably based on functional operators with shift. In previous articles, we considered the term which described results of reproductive processes as a linear expression or as a shift summand. In this work, the reproductive term is represented using an integral with a degenerate kernel. A cyclic model of evolution of the system with a renewable resource is developed. We propose a method for solving the balance equation and we determine an equilibrium state of the system. Having applied this model, we can investigate problems of natural systems and their resource production.展开更多
针对多能互补的综合能源系统(Integrated Energy Systems,IES)优化调度问题,在综合能源系统内部多种能源互补的关系上考虑可再生能源的消纳,综合考虑综合能源系统组成的多样性和能量流动的复杂性,建立系统中各能源设备的数学模型,并在...针对多能互补的综合能源系统(Integrated Energy Systems,IES)优化调度问题,在综合能源系统内部多种能源互补的关系上考虑可再生能源的消纳,综合考虑综合能源系统组成的多样性和能量流动的复杂性,建立系统中各能源设备的数学模型,并在分析典型综合能源系统组成和结构特征的基础上,提出一种通用的IES能量流描述方法,建立IES多能互补模型,以IES日运行成本最小为目标,对其进行优化调度研究,算例分析表明,优化后节约了12.7%的用能费用。展开更多
基金Supported by Special Project of the Science Research in Public Service Industry,Ministry of Water Resources,China(2011-BH140002)
文摘[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in "rianjin area. [Method] In view of climate characteristics in Tianjin, by the way of running under the ice, winter operation experiment of the surface flow constructed wetland in Tianjin was conducted, with the expectation to get some useful process parameters to run such systems in North China in winter. [ Result] Although purification effect of the sewage by surface flow constructed wetland in winter was worse than that in other seasons ( average reduction of about 20%), surface flow constructed wetland running under the ice was feasible in Tianjin area. When surface flow constructed wetland in North China ran under ice in winter, it was suggested that the outlet must be located in a low position to prevent to be completely frozen, and running water depth should not be less than 50 -60 cm. The hydraulic load could be raised on the basis of reflux, and hydraulic retention time should maintain less than 4 d to keep water-soil interface not freezing. Inlet water depth should be increased as much as possible to improve temperature in the system. V Conclusion1 The research could provide reference for promotion and application of the surface flow constructed wetland in North China.
基金supported by the High-tech Research and Development Program of China(2014AA041802)。
文摘Ethylene cracking process is the core production process in ethylene industry,and is paid more attention to reduce high energy consumption.Because of the interdependent relationships between multi-flow allocation and multi-parameter setting in cracking process,it is difficult to find the overall energy efficiency scheduling for the purpose of saving energy.The traditional scheduling solutions with optimal economic benefit are not applicable for energy efficiency scheduling issue due to the neglecting of recycle and lost energy,as well as critical operation parameters as coil outlet pressure(COP)and dilution ratio.In addition,the scheduling solutions mostly regard each cracking furnace as an elementary unit,regardless of the coordinated operation of internal dual radiation chambers(DRC).Therefore,to improve energy utilization and production operation,a novel energy efficiency scheduling solution for ethylene cracking process is proposed in this paper.Specifically,steam heat recycle and exhaust heat loss are considered in cracking process based on 6 types of extreme learning machine(ELM)based cracking models incorporating DRC operation and three operation parameters as coil outlet temperature(COT),COP,and dilution ratio according to semi-mechanism analysis.Then to provide long-term decision-making basis for energy efficiency scheduling,overall energy efficiency indexes,including overall output per unit net energy input(OONE),output-input ratio per unit net energy input(ORNE),exhaust gas heat loss ratio(EGHL),are designed based on input-output analysis in terms of material and energy flows.Finally,a multiobjective evolutionary algorithm based on decomposition(MOEA/D)is employed to solve the formulated multi-objective mixed-integer nonlinear programming(MOMINLP)model.The validities of the proposed scheduling solution are illustrated through a case study.The scheduling results demonstrate that an optimal balance between multi-flow allocation,multi-parameter setting,and DRC coordinated operation is reached,which achieves 3.37%and 2.63%decreases in net energy input for same product output and conversion ratio,as well as the 1.56%decrease in energy loss ratio.
文摘We continue studying systems whose state depends on time and whose resources are renewably based on functional operators with shift. In previous articles, we considered the term which described results of reproductive processes as a linear expression or as a shift summand. In this work, the reproductive term is represented using an integral with a degenerate kernel. A cyclic model of evolution of the system with a renewable resource is developed. We propose a method for solving the balance equation and we determine an equilibrium state of the system. Having applied this model, we can investigate problems of natural systems and their resource production.
文摘针对多能互补的综合能源系统(Integrated Energy Systems,IES)优化调度问题,在综合能源系统内部多种能源互补的关系上考虑可再生能源的消纳,综合考虑综合能源系统组成的多样性和能量流动的复杂性,建立系统中各能源设备的数学模型,并在分析典型综合能源系统组成和结构特征的基础上,提出一种通用的IES能量流描述方法,建立IES多能互补模型,以IES日运行成本最小为目标,对其进行优化调度研究,算例分析表明,优化后节约了12.7%的用能费用。