The supply and demand features of China electric power market are elaborated in this paper, based on the data of power production and demand in the first quarter 2001, and the present situation on power supply and dem...The supply and demand features of China electric power market are elaborated in this paper, based on the data of power production and demand in the first quarter 2001, and the present situation on power supply and demand is analyzed from multi aspects.展开更多
A Microbial fuel cell(MFC)with metal free polymer/graphite electrodes(150 mm×150 mm)was constructed.The electrodes with flowing channels,which were different in roughness,were designed.No additional catalyst was ...A Microbial fuel cell(MFC)with metal free polymer/graphite electrodes(150 mm×150 mm)was constructed.The electrodes with flowing channels,which were different in roughness,were designed.No additional catalyst was coated on the electrode,therefore the MFC was cheaper and possessed good durability with high performance.The effect of roughness,K3Fe(CN)6 concentration and sprayed air on the performance of the constructed MFC was investigated.Results showed that the roughness of electrode can significantly affect the performance of MFC.The power density of MFC increased by 1.56 times owing to the arithmetic mean roughness which has increased by 1.41 times.With an increasing K3Fe(CN)6 concentration,the performance of MFC also improves.The MFC with K3Fe(CN)6 only(30 mM)showed the highest power density of 1260 mW/m2,which is by 21.4 times and 1.3 times higher than those of MFCs with spraying air only(59 mW/m2)and with K3Fe(CN)6+air(1005 mW/m2),respectively.This showed that the appropriate concentration of K3Fe(CN)6 can significantly improve the power density,while the air has a negative effect when it is sprayed onto K3Fe(CN)6 catholyte.A coulombic efficiency of 34.2%and an energy efficiency of 13.3%with a COD degradation rate of 73.5%were achieved with MFC using K3Fe(CN)6 only.The overpotentials of MFC were also calculated.It can be seen that both theηohmic andηconcentration were very low as compared to theηactivation,and theηconcentration can be ignored because its effect was less than 3 mV.The theoretical calculation suggested that with an increasing conversion rate of K3Fe(CN)6,the cathode potential decreased and reached 0.31 V at a conversion rate of 0.99.While the anode behaves differently for constant pH and changeable pH as the reaction progresses,which reveals that the buffer solution and removal of protons play an important role in maintaining the anode potential.展开更多
Energy recovery from waste biomass can have significant impacts on the most pressing development challenges of rural poverty and environmental damages. In this paper, a techno-economic analysis is carried out for elec...Energy recovery from waste biomass can have significant impacts on the most pressing development challenges of rural poverty and environmental damages. In this paper, a techno-economic analysis is carried out for electricity generation by using timber and wood waste (T & WW) gasification in Iceland. Different expenses were considered, like capital, installation, engineering, operation and maintenance costs and the interest rate of the investment. Regarding to revenues, they come from of the electricity sale and the fee paid by the Icelandic municipalities for waste collection and disposal. The economic feasibility was conducted based on the economic indicators of net present value (NPV) and discounted payback period (DPP), bringing together three different subgroups based on gasifier capacities, subgroup a: 50 kW, subgroup b: 100 kW and subgroup c: 200 kW. The results show that total cost increases as the implemented power is increased. This indicator varies from 1228.6 k€ for subgroups a to 1334.7 k€ for subgroups b and 1479.5 k€ for subgroups c. It is worth mentioning that NPV is positive for three subgroups and it grows as gasifier scale is extended. NPV is about 122 k€ (111,020 $), 1824 k€ (1,659,840 $) and 4392 k€ (3,996,720 $) for subgroups a, b and c, respectively. Moreover, DPP has an inversely proportional to the installed capacity. It is around 5.5 years (subgroups a), 9.5 months (subgroups b) and 6 months (subgroups c). The obtained results confirm that using small scale waste biomass gasification integrated with power generation could be techno-economically feasible for remote area in Iceland.展开更多
This research aims to improve the forecasting precision of electric quantity. It is discovered that the total electricity consumption considerably increased during the Spring Festival by the analysis of the electric q...This research aims to improve the forecasting precision of electric quantity. It is discovered that the total electricity consumption considerably increased during the Spring Festival by the analysis of the electric quantity time series from 2002 to 2007 in Shandong province. The festival factor is ascertained to be one of the important seasonal factors affecting the electric quantity fluctuations, and the multiplication model for forecasting is improved by introducing corresponding variables and parameters. The computational results indicate that the average relative error of the new model decreases from 4.31% to 1.93% and the maximum relative error from 14.05% to 6.52% compared with those of the model when the festival factor is not considered. It shows that introducing the festival factor into the multiplication model for electric quantity forecasting evidently improves the precision.展开更多
One of the most common problems arising from the application of exergy analysis is the allocation of cumulative exergy consumption (CExC) in the petroleum distillation process yielding several useful products. Based...One of the most common problems arising from the application of exergy analysis is the allocation of cumulative exergy consumption (CExC) in the petroleum distillation process yielding several useful products. Based on the concept of exergy, an improved calculation of the minimum separation power of product (MSPP) in the petroleum distillation process is provided in this article. The calculation of MSPP can be derived from the concept of exergy. The related mathematical models are established. Finally, application of this method to a case study is given, and the results are compared with the ones using mass as an allocation parameter.展开更多
Helsinki Environmental Services Authority HSY ,Ammaissuo waste management centre consists of two landfill sites. The old land filling area was established in 1987 and closed in 2007. The landfilling at the new landfil...Helsinki Environmental Services Authority HSY ,Ammaissuo waste management centre consists of two landfill sites. The old land filling area was established in 1987 and closed in 2007. The landfilling at the new landfill section started in November 2007. Until spring 2014 the main treatment method for source separated MSW (municipal solid'waste) collected from Helsinki Metropolitan area households was landfilling. Approximately 250,000 tonnes of MSW was landfilled annually. From April 2014 on all of the MWS has been utilized in heat and electricity production at new Waste to Energy plant owned and operated by energy company Vantaa Energy Ltd. The landscaping of the landfills is currently ongoing. The construction of the landfill gas collection system was started in 1994 and from 1996 on landfill gas from old landfill area was recovered and burned in torches to reduce the greenhouse gas effect caused by methane in landfill gas. In the end of year (2004) new landfill gas utilisation system was taken in use Gas was used as a fuel in HOB (heat only boiler) to generate district heating for nearby community as well as commercial and industrial sites. The capacity of the system was 7,000 Nm3/h that corresponded to app. 30 MW of heat. Since district heat was mainly needed only during the cold season of the year only about half of the landfill gas produced by the landfill was able to utilize and rest of the gas was still flared leading to relatively low utilization rate of the gas. The construction work of the new 15 MW + 1.2 MW electricity power plant started in spring 2009. The power plant consists of four gas engines and generators and organic rankine cycle process utilizing thermal oil for heat transfer from exhaust gas and steam turbine with hexamethyldisiloxane (silicone oil) as a medium agent. The ORC (Organic Rankine Cycle)-process was commissioned in August 2011 and the operational experiences have been very good. Based on current knowledge the HSY power plant is the biggest landfill gas fired power plant in Europe and probably even in the whole world. Also the combined engine and ORC-process is unique for landfill gas power plants. The third phase of the biogas utilization took place in summer 2015 when the anaerobic digestion biowaste treatment plant was introduced. At the moment the product gas from digestion plant is utilized at landfill gas power plant. In the future gas will be used as a fuel for new power plant process consisting two gas engines and ORC process. Commissioning of the new power plant will take place in October 2016. This paper presents detailed description of the landfill gas utilization system of HSY waste treatment centre and information on operational experiences of landfill gas fired power plant process.展开更多
This paper is aimed at exploring the potential of implementing biomass as one of the sources of energy in Jordan using a simulated underground burial system. A controlled solar energy heated system was employed to mai...This paper is aimed at exploring the potential of implementing biomass as one of the sources of energy in Jordan using a simulated underground burial system. A controlled solar energy heated system was employed to maintain the anaerobic bioreactor at 40<span style="white-space:normal;">°</span>C (mesophilic range). Sludge and wastewater, from wastewater treatment plant, was used as a seeding material to activate bacteria. Production of biogas was observed after 3 days of incubation. On average, a total of 94 liters/sample were obtained at 25°C and atmospheric pressure. This amount of gas is equivalent to 258 liters/kg (Standard Temperature and Pressure, STP) of sheep manure. The biogas average composition was 65% methane and 35% CO<sub>2</sub>, and the retention time was 35 days. Control runs at room temperature did not produce appreciable amount of biogas within the 35 days of incubation. The potential of biomass was studied based on estimated sheep manure production for the period of 2010-2016 in Jordan. The results obtained from the designed process were used to estimate the bio-gas production indicating a promising process to produce biogas by a burial bio-waste system. Upon scale-up of this process, biomass from different sources can be processed within short residence time, which will result in appreciable reduction of land fill areas and significant production of biogas that will contribute to the energy power mix in a non-oil producing country, such as Jordan.展开更多
Since the decision of the State Council in 1985 on expanding the export of electromechanical products, China’s exports of electrome-chanical products has freed itself from long fluctuation and realized fast growth. A...Since the decision of the State Council in 1985 on expanding the export of electromechanical products, China’s exports of electrome-chanical products has freed itself from long fluctuation and realized fast growth. According to statistics from the Customs Office, China’s exports of electro-mechanical products in 1995 reached US$43.86 billion, increasing 25 times in 10 years, and becoming China’s first pillar products for export. While achieving fast growth in exports, product mix has also seen sig-展开更多
文摘The supply and demand features of China electric power market are elaborated in this paper, based on the data of power production and demand in the first quarter 2001, and the present situation on power supply and demand is analyzed from multi aspects.
基金The authors would like to thank the Federal Ministry of Education and Research(Bundesministerium für Bildung und Forschung),BMBF,Germany,for funding parts of this study under the contract No.02WER1317D.
文摘A Microbial fuel cell(MFC)with metal free polymer/graphite electrodes(150 mm×150 mm)was constructed.The electrodes with flowing channels,which were different in roughness,were designed.No additional catalyst was coated on the electrode,therefore the MFC was cheaper and possessed good durability with high performance.The effect of roughness,K3Fe(CN)6 concentration and sprayed air on the performance of the constructed MFC was investigated.Results showed that the roughness of electrode can significantly affect the performance of MFC.The power density of MFC increased by 1.56 times owing to the arithmetic mean roughness which has increased by 1.41 times.With an increasing K3Fe(CN)6 concentration,the performance of MFC also improves.The MFC with K3Fe(CN)6 only(30 mM)showed the highest power density of 1260 mW/m2,which is by 21.4 times and 1.3 times higher than those of MFCs with spraying air only(59 mW/m2)and with K3Fe(CN)6+air(1005 mW/m2),respectively.This showed that the appropriate concentration of K3Fe(CN)6 can significantly improve the power density,while the air has a negative effect when it is sprayed onto K3Fe(CN)6 catholyte.A coulombic efficiency of 34.2%and an energy efficiency of 13.3%with a COD degradation rate of 73.5%were achieved with MFC using K3Fe(CN)6 only.The overpotentials of MFC were also calculated.It can be seen that both theηohmic andηconcentration were very low as compared to theηactivation,and theηconcentration can be ignored because its effect was less than 3 mV.The theoretical calculation suggested that with an increasing conversion rate of K3Fe(CN)6,the cathode potential decreased and reached 0.31 V at a conversion rate of 0.99.While the anode behaves differently for constant pH and changeable pH as the reaction progresses,which reveals that the buffer solution and removal of protons play an important role in maintaining the anode potential.
文摘Energy recovery from waste biomass can have significant impacts on the most pressing development challenges of rural poverty and environmental damages. In this paper, a techno-economic analysis is carried out for electricity generation by using timber and wood waste (T & WW) gasification in Iceland. Different expenses were considered, like capital, installation, engineering, operation and maintenance costs and the interest rate of the investment. Regarding to revenues, they come from of the electricity sale and the fee paid by the Icelandic municipalities for waste collection and disposal. The economic feasibility was conducted based on the economic indicators of net present value (NPV) and discounted payback period (DPP), bringing together three different subgroups based on gasifier capacities, subgroup a: 50 kW, subgroup b: 100 kW and subgroup c: 200 kW. The results show that total cost increases as the implemented power is increased. This indicator varies from 1228.6 k€ for subgroups a to 1334.7 k€ for subgroups b and 1479.5 k€ for subgroups c. It is worth mentioning that NPV is positive for three subgroups and it grows as gasifier scale is extended. NPV is about 122 k€ (111,020 $), 1824 k€ (1,659,840 $) and 4392 k€ (3,996,720 $) for subgroups a, b and c, respectively. Moreover, DPP has an inversely proportional to the installed capacity. It is around 5.5 years (subgroups a), 9.5 months (subgroups b) and 6 months (subgroups c). The obtained results confirm that using small scale waste biomass gasification integrated with power generation could be techno-economically feasible for remote area in Iceland.
基金The Forecasting Research Base of Chinese Academy of Sciences in Xi an Jiaotong University,the National Natural Science Foundation of China (No.70773091)
文摘This research aims to improve the forecasting precision of electric quantity. It is discovered that the total electricity consumption considerably increased during the Spring Festival by the analysis of the electric quantity time series from 2002 to 2007 in Shandong province. The festival factor is ascertained to be one of the important seasonal factors affecting the electric quantity fluctuations, and the multiplication model for forecasting is improved by introducing corresponding variables and parameters. The computational results indicate that the average relative error of the new model decreases from 4.31% to 1.93% and the maximum relative error from 14.05% to 6.52% compared with those of the model when the festival factor is not considered. It shows that introducing the festival factor into the multiplication model for electric quantity forecasting evidently improves the precision.
文摘One of the most common problems arising from the application of exergy analysis is the allocation of cumulative exergy consumption (CExC) in the petroleum distillation process yielding several useful products. Based on the concept of exergy, an improved calculation of the minimum separation power of product (MSPP) in the petroleum distillation process is provided in this article. The calculation of MSPP can be derived from the concept of exergy. The related mathematical models are established. Finally, application of this method to a case study is given, and the results are compared with the ones using mass as an allocation parameter.
文摘Helsinki Environmental Services Authority HSY ,Ammaissuo waste management centre consists of two landfill sites. The old land filling area was established in 1987 and closed in 2007. The landfilling at the new landfill section started in November 2007. Until spring 2014 the main treatment method for source separated MSW (municipal solid'waste) collected from Helsinki Metropolitan area households was landfilling. Approximately 250,000 tonnes of MSW was landfilled annually. From April 2014 on all of the MWS has been utilized in heat and electricity production at new Waste to Energy plant owned and operated by energy company Vantaa Energy Ltd. The landscaping of the landfills is currently ongoing. The construction of the landfill gas collection system was started in 1994 and from 1996 on landfill gas from old landfill area was recovered and burned in torches to reduce the greenhouse gas effect caused by methane in landfill gas. In the end of year (2004) new landfill gas utilisation system was taken in use Gas was used as a fuel in HOB (heat only boiler) to generate district heating for nearby community as well as commercial and industrial sites. The capacity of the system was 7,000 Nm3/h that corresponded to app. 30 MW of heat. Since district heat was mainly needed only during the cold season of the year only about half of the landfill gas produced by the landfill was able to utilize and rest of the gas was still flared leading to relatively low utilization rate of the gas. The construction work of the new 15 MW + 1.2 MW electricity power plant started in spring 2009. The power plant consists of four gas engines and generators and organic rankine cycle process utilizing thermal oil for heat transfer from exhaust gas and steam turbine with hexamethyldisiloxane (silicone oil) as a medium agent. The ORC (Organic Rankine Cycle)-process was commissioned in August 2011 and the operational experiences have been very good. Based on current knowledge the HSY power plant is the biggest landfill gas fired power plant in Europe and probably even in the whole world. Also the combined engine and ORC-process is unique for landfill gas power plants. The third phase of the biogas utilization took place in summer 2015 when the anaerobic digestion biowaste treatment plant was introduced. At the moment the product gas from digestion plant is utilized at landfill gas power plant. In the future gas will be used as a fuel for new power plant process consisting two gas engines and ORC process. Commissioning of the new power plant will take place in October 2016. This paper presents detailed description of the landfill gas utilization system of HSY waste treatment centre and information on operational experiences of landfill gas fired power plant process.
文摘This paper is aimed at exploring the potential of implementing biomass as one of the sources of energy in Jordan using a simulated underground burial system. A controlled solar energy heated system was employed to maintain the anaerobic bioreactor at 40<span style="white-space:normal;">°</span>C (mesophilic range). Sludge and wastewater, from wastewater treatment plant, was used as a seeding material to activate bacteria. Production of biogas was observed after 3 days of incubation. On average, a total of 94 liters/sample were obtained at 25°C and atmospheric pressure. This amount of gas is equivalent to 258 liters/kg (Standard Temperature and Pressure, STP) of sheep manure. The biogas average composition was 65% methane and 35% CO<sub>2</sub>, and the retention time was 35 days. Control runs at room temperature did not produce appreciable amount of biogas within the 35 days of incubation. The potential of biomass was studied based on estimated sheep manure production for the period of 2010-2016 in Jordan. The results obtained from the designed process were used to estimate the bio-gas production indicating a promising process to produce biogas by a burial bio-waste system. Upon scale-up of this process, biomass from different sources can be processed within short residence time, which will result in appreciable reduction of land fill areas and significant production of biogas that will contribute to the energy power mix in a non-oil producing country, such as Jordan.
文摘Since the decision of the State Council in 1985 on expanding the export of electromechanical products, China’s exports of electrome-chanical products has freed itself from long fluctuation and realized fast growth. According to statistics from the Customs Office, China’s exports of electro-mechanical products in 1995 reached US$43.86 billion, increasing 25 times in 10 years, and becoming China’s first pillar products for export. While achieving fast growth in exports, product mix has also seen sig-