China will begin accrediting its own innovative products from this year. It plans to complete the Catalog of China's Independent Innovation Products by 2007 for future reference of government procurement. The prod...China will begin accrediting its own innovative products from this year. It plans to complete the Catalog of China's Independent Innovation Products by 2007 for future reference of government procurement. The products in the catalog shall enjoy preferential policies. According to the Ministry of Science and Technology of the People's Republic of China, the accreditations shall be made based on Measures for the Administration of the Accreditation of National Independent Innovation Products (for Trial Implementation), which was jointly launched on December 31, 2006, by the Ministry of Science and Technology, the National Development and Reform Commission (NDRC), and the Ministry of Finance of the People's Republic of China.展开更多
An integrated system for assembly planning and design (INSAPS) is presented in which product data can be exchanged between assembly planning and assembly design on the basis of standard for exchange of product data mo...An integrated system for assembly planning and design (INSAPS) is presented in which product data can be exchanged between assembly planning and assembly design on the basis of standard for exchange of product data model (STEP). The system consists of CAD system, product modeling system, assembly planning system. The product model is organized according to the STEP, uses mostly the entities of IR (integrated resources) and partly self defined entities which is necessary for assembly planning. A simple method of assembly sequence generation is presented which is suitable for complex assembly planning. The generated assembly sequences are evaluated considering the optimization of total assembly time. The results of assembly planning are feedback to the stage of assembly design to improve design.展开更多
Production schedules that provide optimal operating strategies while meeting practical,technical,and environmental constraints are an inseparable part of mining operations.Relying only on manual planning methods or co...Production schedules that provide optimal operating strategies while meeting practical,technical,and environmental constraints are an inseparable part of mining operations.Relying only on manual planning methods or computer software based on heuristic algorithms will lead to mine schedules that are not the optimal global solution.Mathematical mine planning models have been proved to be very effective in supporting decisions on sequencing the extraction of material in mines.The objective of this paper is to develop a practical optimization framework for caving operations’production scheduling.To overcome the size problem of mathematical programming models and to generate a robust practical near-optimal schedule,a multi-step method for long-term production scheduling of block caving is presented.A mixed-integer linear programming(MILP)formulation is used for each step.The formulations are developed,implemented,and verifed in the TOMLAB/CPLEX environment.The production scheduler aims to maximize the net present value of the mining operation while the mine planner has control over defned constraints.Application and comparison of the models for production scheduling using 298 drawpoints over 15 periods are presented.展开更多
The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors ...The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production plarming and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed small- and large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.展开更多
In order to increase productivity and reduce energy consumption of steelmaking-continuous casting(SCC) production process, especially with complicated technological routes, the cross entropy(CE) method was adopted to ...In order to increase productivity and reduce energy consumption of steelmaking-continuous casting(SCC) production process, especially with complicated technological routes, the cross entropy(CE) method was adopted to optimize the SCC production scheduling(SCCPS) problem. Based on the CE method, a matrix encoding scheme was proposed and a backward decoding method was used to generate a reasonable schedule. To describe the distribution of the solution space, a probability distribution model was built and used to generate individuals. In addition, the probability updating mechanism of the probability distribution model was proposed which helps to find the optimal individual gradually. Because of the poor stability and premature convergence of the standard cross entropy(SCE) algorithm, the improved cross entropy(ICE) algorithm was proposed with the following improvements: individual generation mechanism combined with heuristic rules, retention mechanism of the optimal individual, local search mechanism and dynamic parameters of the algorithm. Simulation experiments validate that the CE method is effective in solving the SCCPS problem with complicated technological routes and the ICE algorithm proposed has superior performance to the SCE algorithm and the genetic algorithm(GA).展开更多
Against the realistic background of excess production capacity, product structure imbalance, and high material and energy consumption in steel enterprises, the implementation of operation optimization for the steel ma...Against the realistic background of excess production capacity, product structure imbalance, and high material and energy consumption in steel enterprises, the implementation of operation optimization for the steel manufacturing process is essential to reduce the production cost, increase the production or energy efficiency, and improve production management. In this study, the operation optimization problem of the steel manufacturing process, which needed to go through a complex production organization from customers' orders to workshop production, was analyzed. The existing research on the operation optimization techniques, including process simulation, production planning, production scheduling, interface scheduling, and scheduling of auxiliary equipment, was reviewed. The literature review reveals that, although considerable research has been conducted to optimize the operation of steel production, these techniques are usually independent and unsystematic.Therefore, the future work related to operation optimization of the steel manufacturing process based on the integration of multi technologies and the intersection of multi disciplines were summarized.展开更多
Group scheduling problems have attracted much attention owing to their many practical applications.This work proposes a new bi-objective serial-batch group scheduling problem considering the constraints of sequence-de...Group scheduling problems have attracted much attention owing to their many practical applications.This work proposes a new bi-objective serial-batch group scheduling problem considering the constraints of sequence-dependent setup time,release time,and due time.It is originated from an important industrial process,i.e.,wire rod and bar rolling process in steel production systems.Two objective functions,i.e.,the number of late jobs and total setup time,are minimized.A mixed integer linear program is established to describe the problem.To obtain its Pareto solutions,we present a memetic algorithm that integrates a population-based nondominated sorting genetic algorithm II and two single-solution-based improvement methods,i.e.,an insertion-based local search and an iterated greedy algorithm.The computational results on extensive industrial data with the scale of a one-week schedule show that the proposed algorithm has great performance in solving the concerned problem and outperforms its peers.Its high accuracy and efficiency imply its great potential to be applied to solve industrial-size group scheduling problems.展开更多
The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (seq...The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (sequence coding and decimal coding) developed by us. In which, the partially matched cross over (PMX) and reverse mutation are used for the sequence coding, whereas the arithmetic crossover and heteropic mutation are used for the decimal coding. In addition, the relationship between production scale and production cost is analyzed and the maximum profit is always a trade-off of the production scale and production cost. Two examples are solved to demonstrate the effectiveness of the method.展开更多
Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimiza...Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimization methods that are not capable of accounting for inherent technical uncertainties such as uncertainty in the expected ore/metal supply from the underground, acknowledged to be the most critical factor. To integrate ore/metal uncertainty into the optimization of mine production scheduling a stochastic integer programming(SIP) formulation is tested at a copper deposit. The stochastic solution maximizes the economic value of a project and minimizes deviations from production targets in the presence of ore/metal uncertainty. Unlike the conventional approach, the SIP model accounts and manages risk in ore supply, leading to a mine production schedule with a 29% higher net present value than the schedule obtained from the conventional, industry-standard optimization approach, thus contributing to improving the management and sustainable utilization of mineral resources.展开更多
Iron and steel industry is an important sector of Iran's economy.Choghart iron ore mine is an important iron ore producer of Iran steel industry.Phosphorous contained in the iron ore concentrates of Choghart mine ...Iron and steel industry is an important sector of Iran's economy.Choghart iron ore mine is an important iron ore producer of Iran steel industry.Phosphorous contained in the iron ore concentrates of Choghart mine has a detrimental effect on the steel making process,whereby this causes cracks to form in the refractory lining of blast furnaces.In the past,about 1.43 Mt of low-grade and 4.53 Mt of high-phosphorous materials had been transported to low grade and high phosphorous stockpiles,respectively,for future beneficiation.As a result of the progressive depletion of high-grade ore and establishment of beneficiation plant in Choghart,exploitation of these two stockpiles in this mine became an important issue.In this work,a linear goal programming(GP) model was developed in order to determine the optimum iron ore blend in terms of quality from low grade and high phosphorous stockpiles of Choghart mine.The model was solved by the SOLVER V.9 program.Results show that feeding with acceptable quality(w(Fe)≥50% and w(P)≤1.2%,mass fraction) materials can be blended from stockpiles that satisfy the needs of the Choghart processing line.展开更多
Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it pos...Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.展开更多
The garment industry in Vietnam is one of the country’s strongest industries in the world.However,the production process still encounters problems regarding scheduling that does not equate to an optimal process.The p...The garment industry in Vietnam is one of the country’s strongest industries in the world.However,the production process still encounters problems regarding scheduling that does not equate to an optimal process.The paper introduces a production scheduling solution that resolves the potential delays and lateness that hinders the production process using integer programming and order allocation with a make-to-order manufacturing viewpoint.A number of constraints were considered in the model and is applied to a real case study of a factory in order to viewhowthe tardiness and latenesswould be affected which resulted in optimizing the scheduling time better.Specifically,the constraints considered were order assignments,production time,and tardiness with an objective function which is to minimize the total cost of delay.The results of the study precisely the overall cost of delay of the orders given to the plant and successfully propose a suitable production schedule that utilizes the most of the plant given.The study has shown promising results that would assist plant and production managers in determining an algorithm that they can apply for their production process.展开更多
Commodity prices have fallen sharply due to the global financial crisis. This has adversely affected the viability of some mining projects, including leading to the possibility of bankruptcy for some companies. These ...Commodity prices have fallen sharply due to the global financial crisis. This has adversely affected the viability of some mining projects, including leading to the possibility of bankruptcy for some companies. These price falls reflect uncertainties and risks associated with mining projects. In recent years, much work has been published related to the application of real options pricing theory to value life-of-mine plans in response to long term financial uncertainty and risk. However, there are uncertainties and risks associated with medium/short-term mining operations. Real options theory can also be applied to tactical decisions involving uncertainties and risks. This paper will investigate the application of real options in the mining industry and present a methodology developed at University of Queensland, Australia, for integrating real options into medium/short-term mine planning and production scheduling. A case study will demonstrate the validity and usefulness of the methodology and techniques developed.展开更多
The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target pr...The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production. A mixed integer linear programming algorithm is formulated to find the min- ing sequence of blocks from a predefined pit shell and their respective destinations, with two objectives: to maximize the net present value of the operation and to minimize the cost of uncertainty. An efficient clustering technique reduces the number of var/ables to make the problem tractable. Also, the parameters that control the importance of uncertainty in the optimization problem are studied. The minimum annual mining capacity in presence of grade uncertainty is assessed. The method is illustrated with an oil sand deposit in northern Alberta.展开更多
One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term produ...One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term production scheduling(LTPS)of the open-pit mines.Deterministic and uncertainty-based approaches are identified as the main strategies,which have been widely used to cope with this problem.Within the last few years,many researchers have highly considered a new computational type,which is less costly,i.e.,meta-heuristic methods,so as to solve the mine design and production scheduling problem.Although the optimality of the final solution cannot be guaranteed,they are able to produce sufficiently good solutions with relatively less computational costs.In the present paper,two hybrid models between augmented Lagrangian relaxation(ALR)and a particle swarm optimization(PSO)and ALR and bat algorithm(BA)are suggested so that the LTPS problem is solved under the condition of grade uncertainty.It is suggested to carry out the ALR method on the LTPS problem to improve its performance and accelerate the convergence.Moreover,the Lagrangian coefficients are updated by using PSO and BA.The presented models have been compared with the outcomes of the ALR-genetic algorithm,the ALR-traditional sub-gradient method,and the conventional method without using the Lagrangian approach.The results indicated that the ALR is considered a more efficient approach which can solve a large-scale problem and make a valid solution.Hence,it is more effectual than the conventional method.Furthermore,the time and cost of computation are diminished by the proposed hybrid strategies.The CPU time using the ALR-BA method is about 7.4%higher than the ALR-PSO approach.展开更多
A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' pa...A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' parameters are available from the geological database of the mine. The objective is to minimize the deviation of the average ore grade of blasted blocks from the standard ore grade required by the mill. Transportation ability constraint. production quantity demand constraint. minimum safety bench constraint. block size constraint and block, bench precedence constraints are considered in forming the programming model. This model has more practical objective function and reasonable constraints compared with the existing model for this kind of problems.展开更多
Taking the seamless tube plant of Baoshan Iron & Steel Complex in China as the background,we analyze the characters of hot rolling seamless steel tube:multi varieties,low volume,complicated production process,flex...Taking the seamless tube plant of Baoshan Iron & Steel Complex in China as the background,we analyze the characters of hot rolling seamless steel tube:multi varieties,low volume,complicated production process,flexible production routes.Then integrated scheduling problem for hot rolling seamless steel tube production is studied,which covers two key points;order-grouping problem and solution method for flowshop/jobshop scheduling problem.On the basis of these two problems,integrated scheduling decision system is developed.The design idea,function flow sheet,data processing method,and functional module of visualized human-computer interactive scheduling system implemented in seamless steel tube plant of Shanghai Baoshan Iron & Steel Complex are described into detail.Compared with manual system,the performance of system shows the applicability and superiority in several criteria.展开更多
In this paper,an oil well production scheduling problem for the light load oil well during petroleum field exploitation was studied.The oil well production scheduling was to determine the turn on/off status and oil fl...In this paper,an oil well production scheduling problem for the light load oil well during petroleum field exploitation was studied.The oil well production scheduling was to determine the turn on/off status and oil flow rates of the wells in a given oil reservoir,subject to a number of constraints such as minimum up/down time limits and well grouping.The problem was formulated as a mixed integer nonlinear programming model that minimized the total production operating cost and start-up cost.Due to the NP-hardness of the problem,an improved particle swarm optimization(PSO) algorithm with a new velocity updating formula was developed to solve the problem approximately.Computational experiments on randomly generated instances were carried out to evaluate the performance of the model and the algorithm's effectiveness.Compared with the commercial solver CPLEX,the improved PSO can obtain high-quality schedules within a much shorter running time for all the instances.展开更多
In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its s...In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its scheduling problem. The basic DTPN modules are presented to model the corresponding variable structures in RPL, and then the scheduling model of the whole RPL is constructed. And in the scheduling algorithm, firing sequences of the Petri nets model are used as chromosomes, thus the selection, crossover, and mutation operator do not deal with the elements in the problem space, but the elements of Petri nets model. Accordingly, all the algorithms for GA operations embedded with Petri nets model are proposed. Moreover, the new weighted single-objective optimization based on reconfiguration cost and E/T is used. The results of a DC motor RPL scheduling suggest that the presented DTPN-GA scheduling algorithm has a significant impact on RPL scheduling, and provide obvious improvements over the conventional scheduling method in practice that meets duedate, minimizes reconfiguration cost, and enhances cost effectivity.展开更多
The aim of this paper is to compare block-structured linear programming (LP) models against other practical optimization methods for solving downstream product refinery problems using a solution method different fro...The aim of this paper is to compare block-structured linear programming (LP) models against other practical optimization methods for solving downstream product refinery problems using a solution method different from the existing ones (like mixed integer linear programming (MILP) method). The work X-rays the Nigerian petroleum refining industries and their channel of distribution in the local setting and identifies the critical features of scheduling and allocation of refined crude products; either for distribution within the country or for exportation to the international market. Applying our model to the distribution model, the computational results reveal a better route with lowest transportation cost for the scheduling problem and the best optimal blend with higher revenue for the production problem.展开更多
文摘China will begin accrediting its own innovative products from this year. It plans to complete the Catalog of China's Independent Innovation Products by 2007 for future reference of government procurement. The products in the catalog shall enjoy preferential policies. According to the Ministry of Science and Technology of the People's Republic of China, the accreditations shall be made based on Measures for the Administration of the Accreditation of National Independent Innovation Products (for Trial Implementation), which was jointly launched on December 31, 2006, by the Ministry of Science and Technology, the National Development and Reform Commission (NDRC), and the Ministry of Finance of the People's Republic of China.
文摘An integrated system for assembly planning and design (INSAPS) is presented in which product data can be exchanged between assembly planning and assembly design on the basis of standard for exchange of product data model (STEP). The system consists of CAD system, product modeling system, assembly planning system. The product model is organized according to the STEP, uses mostly the entities of IR (integrated resources) and partly self defined entities which is necessary for assembly planning. A simple method of assembly sequence generation is presented which is suitable for complex assembly planning. The generated assembly sequences are evaluated considering the optimization of total assembly time. The results of assembly planning are feedback to the stage of assembly design to improve design.
文摘Production schedules that provide optimal operating strategies while meeting practical,technical,and environmental constraints are an inseparable part of mining operations.Relying only on manual planning methods or computer software based on heuristic algorithms will lead to mine schedules that are not the optimal global solution.Mathematical mine planning models have been proved to be very effective in supporting decisions on sequencing the extraction of material in mines.The objective of this paper is to develop a practical optimization framework for caving operations’production scheduling.To overcome the size problem of mathematical programming models and to generate a robust practical near-optimal schedule,a multi-step method for long-term production scheduling of block caving is presented.A mixed-integer linear programming(MILP)formulation is used for each step.The formulations are developed,implemented,and verifed in the TOMLAB/CPLEX environment.The production scheduler aims to maximize the net present value of the mining operation while the mine planner has control over defned constraints.Application and comparison of the models for production scheduling using 298 drawpoints over 15 periods are presented.
基金Supported by a Marie Curie International Research Staff Exchange Scheme Fellowship within the 7th European Community Framework Program(Grant No.294931)National Science Foundation of China(Grant No.51175262)+1 种基金Jiangsu Provincial Science Foundation for Excellent Youths of China(Grant No.BK2012032)Jiangsu Provincial Industry-Academy-Research Grant of China(Grant No.BY201220116)
文摘The traditional production planning and scheduling problems consider performance indicators like time, cost and quality as optimization objectives in manufacturing processes. However, environmentally-friendly factors like energy consumption of production have not been completely taken into consideration. Against this background, this paper addresses an approach to modify a given schedule generated by a production plarming and scheduling system in a job shop floor, where machine tools can work at different cutting speeds. It can adjust the cutting speeds of the operations while keeping the original assignment and processing sequence of operations of each job fixed in order to obtain energy savings. First, the proposed approach, based on a mixed integer programming mathematical model, changes the total idle time of the given schedule to minimize energy consumption in the job shop floor while accepting the optimal solution of the scheduling objective, makespan. Then, a genetic-simulated annealing algorithm is used to explore the optimal solution due to the fact that the problem is strongly NP-hard. Finally, the effectiveness of the approach is performed small- and large-size instances, respectively. The experimental results show that the approach can save 5%-10% of the average energy consumption while accepting the optimal solution of the makespan in small-size instances. In addition, the average maximum energy saving ratio can reach to 13%. And it can save approximately 1%-4% of the average energy consumption and approximately 2.4% of the average maximum energy while accepting the near-optimal solution of the makespan in large-size instances. The proposed research provides an interesting point to explore an energy-aware schedule optimization for a traditional production planning and scheduling problem.
基金Project(ZR2014FM036)supported by Shandong Provincial Natural Science Foundation of ChinaProject(ZR2010FZ001)supported by the Key Program of Shandong Provincial Natural Science Foundation of China
文摘In order to increase productivity and reduce energy consumption of steelmaking-continuous casting(SCC) production process, especially with complicated technological routes, the cross entropy(CE) method was adopted to optimize the SCC production scheduling(SCCPS) problem. Based on the CE method, a matrix encoding scheme was proposed and a backward decoding method was used to generate a reasonable schedule. To describe the distribution of the solution space, a probability distribution model was built and used to generate individuals. In addition, the probability updating mechanism of the probability distribution model was proposed which helps to find the optimal individual gradually. Because of the poor stability and premature convergence of the standard cross entropy(SCE) algorithm, the improved cross entropy(ICE) algorithm was proposed with the following improvements: individual generation mechanism combined with heuristic rules, retention mechanism of the optimal individual, local search mechanism and dynamic parameters of the algorithm. Simulation experiments validate that the CE method is effective in solving the SCCPS problem with complicated technological routes and the ICE algorithm proposed has superior performance to the SCE algorithm and the genetic algorithm(GA).
基金financially supported by the National Natural Science Foundation of China (No.51734004)the National Key Research and Development Program of China (No.2017YFB0304005)the National Natural Science Foundation of China (No.51474044)。
文摘Against the realistic background of excess production capacity, product structure imbalance, and high material and energy consumption in steel enterprises, the implementation of operation optimization for the steel manufacturing process is essential to reduce the production cost, increase the production or energy efficiency, and improve production management. In this study, the operation optimization problem of the steel manufacturing process, which needed to go through a complex production organization from customers' orders to workshop production, was analyzed. The existing research on the operation optimization techniques, including process simulation, production planning, production scheduling, interface scheduling, and scheduling of auxiliary equipment, was reviewed. The literature review reveals that, although considerable research has been conducted to optimize the operation of steel production, these techniques are usually independent and unsystematic.Therefore, the future work related to operation optimization of the steel manufacturing process based on the integration of multi technologies and the intersection of multi disciplines were summarized.
基金This work was supported by the China Scholarship Council Scholarship,the National Key Research and Development Program of China(2017YFB0306400)the National Natural Science Foundation of China(62073069)the Deanship of Scientific Research(DSR)at King Abdulaziz University(RG-48-135-40).
文摘Group scheduling problems have attracted much attention owing to their many practical applications.This work proposes a new bi-objective serial-batch group scheduling problem considering the constraints of sequence-dependent setup time,release time,and due time.It is originated from an important industrial process,i.e.,wire rod and bar rolling process in steel production systems.Two objective functions,i.e.,the number of late jobs and total setup time,are minimized.A mixed integer linear program is established to describe the problem.To obtain its Pareto solutions,we present a memetic algorithm that integrates a population-based nondominated sorting genetic algorithm II and two single-solution-based improvement methods,i.e.,an insertion-based local search and an iterated greedy algorithm.The computational results on extensive industrial data with the scale of a one-week schedule show that the proposed algorithm has great performance in solving the concerned problem and outperforms its peers.Its high accuracy and efficiency imply its great potential to be applied to solve industrial-size group scheduling problems.
文摘The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (sequence coding and decimal coding) developed by us. In which, the partially matched cross over (PMX) and reverse mutation are used for the sequence coding, whereas the arithmetic crossover and heteropic mutation are used for the decimal coding. In addition, the relationship between production scale and production cost is analyzed and the maximum profit is always a trade-off of the production scale and production cost. Two examples are solved to demonstrate the effectiveness of the method.
基金funded from the National Science and Engineering Research Council of Canada,Collaborative R&D Grant CRDPJ 335696 with BHP Billiton and NSERC Discovery Grant 239019 to R. Dimitrakopoulos
文摘Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimization methods that are not capable of accounting for inherent technical uncertainties such as uncertainty in the expected ore/metal supply from the underground, acknowledged to be the most critical factor. To integrate ore/metal uncertainty into the optimization of mine production scheduling a stochastic integer programming(SIP) formulation is tested at a copper deposit. The stochastic solution maximizes the economic value of a project and minimizes deviations from production targets in the presence of ore/metal uncertainty. Unlike the conventional approach, the SIP model accounts and manages risk in ore supply, leading to a mine production schedule with a 29% higher net present value than the schedule obtained from the conventional, industry-standard optimization approach, thus contributing to improving the management and sustainable utilization of mineral resources.
文摘Iron and steel industry is an important sector of Iran's economy.Choghart iron ore mine is an important iron ore producer of Iran steel industry.Phosphorous contained in the iron ore concentrates of Choghart mine has a detrimental effect on the steel making process,whereby this causes cracks to form in the refractory lining of blast furnaces.In the past,about 1.43 Mt of low-grade and 4.53 Mt of high-phosphorous materials had been transported to low grade and high phosphorous stockpiles,respectively,for future beneficiation.As a result of the progressive depletion of high-grade ore and establishment of beneficiation plant in Choghart,exploitation of these two stockpiles in this mine became an important issue.In this work,a linear goal programming(GP) model was developed in order to determine the optimum iron ore blend in terms of quality from low grade and high phosphorous stockpiles of Choghart mine.The model was solved by the SOLVER V.9 program.Results show that feeding with acceptable quality(w(Fe)≥50% and w(P)≤1.2%,mass fraction) materials can be blended from stockpiles that satisfy the needs of the Choghart processing line.
文摘Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.
文摘The garment industry in Vietnam is one of the country’s strongest industries in the world.However,the production process still encounters problems regarding scheduling that does not equate to an optimal process.The paper introduces a production scheduling solution that resolves the potential delays and lateness that hinders the production process using integer programming and order allocation with a make-to-order manufacturing viewpoint.A number of constraints were considered in the model and is applied to a real case study of a factory in order to viewhowthe tardiness and latenesswould be affected which resulted in optimizing the scheduling time better.Specifically,the constraints considered were order assignments,production time,and tardiness with an objective function which is to minimize the total cost of delay.The results of the study precisely the overall cost of delay of the orders given to the plant and successfully propose a suitable production schedule that utilizes the most of the plant given.The study has shown promising results that would assist plant and production managers in determining an algorithm that they can apply for their production process.
文摘Commodity prices have fallen sharply due to the global financial crisis. This has adversely affected the viability of some mining projects, including leading to the possibility of bankruptcy for some companies. These price falls reflect uncertainties and risks associated with mining projects. In recent years, much work has been published related to the application of real options pricing theory to value life-of-mine plans in response to long term financial uncertainty and risk. However, there are uncertainties and risks associated with medium/short-term mining operations. Real options theory can also be applied to tactical decisions involving uncertainties and risks. This paper will investigate the application of real options in the mining industry and present a methodology developed at University of Queensland, Australia, for integrating real options into medium/short-term mine planning and production scheduling. A case study will demonstrate the validity and usefulness of the methodology and techniques developed.
文摘The complexity of an open pit production scheduling problem is increased by grade uncertainty. A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production. A mixed integer linear programming algorithm is formulated to find the min- ing sequence of blocks from a predefined pit shell and their respective destinations, with two objectives: to maximize the net present value of the operation and to minimize the cost of uncertainty. An efficient clustering technique reduces the number of var/ables to make the problem tractable. Also, the parameters that control the importance of uncertainty in the optimization problem are studied. The minimum annual mining capacity in presence of grade uncertainty is assessed. The method is illustrated with an oil sand deposit in northern Alberta.
文摘One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term production scheduling(LTPS)of the open-pit mines.Deterministic and uncertainty-based approaches are identified as the main strategies,which have been widely used to cope with this problem.Within the last few years,many researchers have highly considered a new computational type,which is less costly,i.e.,meta-heuristic methods,so as to solve the mine design and production scheduling problem.Although the optimality of the final solution cannot be guaranteed,they are able to produce sufficiently good solutions with relatively less computational costs.In the present paper,two hybrid models between augmented Lagrangian relaxation(ALR)and a particle swarm optimization(PSO)and ALR and bat algorithm(BA)are suggested so that the LTPS problem is solved under the condition of grade uncertainty.It is suggested to carry out the ALR method on the LTPS problem to improve its performance and accelerate the convergence.Moreover,the Lagrangian coefficients are updated by using PSO and BA.The presented models have been compared with the outcomes of the ALR-genetic algorithm,the ALR-traditional sub-gradient method,and the conventional method without using the Lagrangian approach.The results indicated that the ALR is considered a more efficient approach which can solve a large-scale problem and make a valid solution.Hence,it is more effectual than the conventional method.Furthermore,the time and cost of computation are diminished by the proposed hybrid strategies.The CPU time using the ALR-BA method is about 7.4%higher than the ALR-PSO approach.
文摘A quadratic programming model is established to choose the blocks to be blasted in a given period. The length of this period depends on the production planning requirements. During the given period, the blocks' parameters are available from the geological database of the mine. The objective is to minimize the deviation of the average ore grade of blasted blocks from the standard ore grade required by the mill. Transportation ability constraint. production quantity demand constraint. minimum safety bench constraint. block size constraint and block, bench precedence constraints are considered in forming the programming model. This model has more practical objective function and reasonable constraints compared with the existing model for this kind of problems.
文摘Taking the seamless tube plant of Baoshan Iron & Steel Complex in China as the background,we analyze the characters of hot rolling seamless steel tube:multi varieties,low volume,complicated production process,flexible production routes.Then integrated scheduling problem for hot rolling seamless steel tube production is studied,which covers two key points;order-grouping problem and solution method for flowshop/jobshop scheduling problem.On the basis of these two problems,integrated scheduling decision system is developed.The design idea,function flow sheet,data processing method,and functional module of visualized human-computer interactive scheduling system implemented in seamless steel tube plant of Shanghai Baoshan Iron & Steel Complex are described into detail.Compared with manual system,the performance of system shows the applicability and superiority in several criteria.
基金Supported by National High Technology Research and Development Program of China(2013AA040704)the Fund for the National Natural Science Foundation of China(61374203)
文摘In this paper,an oil well production scheduling problem for the light load oil well during petroleum field exploitation was studied.The oil well production scheduling was to determine the turn on/off status and oil flow rates of the wells in a given oil reservoir,subject to a number of constraints such as minimum up/down time limits and well grouping.The problem was formulated as a mixed integer nonlinear programming model that minimized the total production operating cost and start-up cost.Due to the NP-hardness of the problem,an improved particle swarm optimization(PSO) algorithm with a new velocity updating formula was developed to solve the problem approximately.Computational experiments on randomly generated instances were carried out to evaluate the performance of the model and the algorithm's effectiveness.Compared with the commercial solver CPLEX,the improved PSO can obtain high-quality schedules within a much shorter running time for all the instances.
基金This project is supported by Key Science-Technology Project of Shanghai City Tenth Five-Year-Plan, China (No.031111002)Specialized Research Fund for the Doctoral Program of Higher Education, China (No.20040247033)Municipal Key Basic Research Program of Shanghai, China (No.05JC14060)
文摘In response to the production capacity and functionality variations, a genetic algorithm (GA) embedded with deterministic timed Petri nets(DTPN) for reconfigurable production line(RPL) is proposed to solve its scheduling problem. The basic DTPN modules are presented to model the corresponding variable structures in RPL, and then the scheduling model of the whole RPL is constructed. And in the scheduling algorithm, firing sequences of the Petri nets model are used as chromosomes, thus the selection, crossover, and mutation operator do not deal with the elements in the problem space, but the elements of Petri nets model. Accordingly, all the algorithms for GA operations embedded with Petri nets model are proposed. Moreover, the new weighted single-objective optimization based on reconfiguration cost and E/T is used. The results of a DC motor RPL scheduling suggest that the presented DTPN-GA scheduling algorithm has a significant impact on RPL scheduling, and provide obvious improvements over the conventional scheduling method in practice that meets duedate, minimizes reconfiguration cost, and enhances cost effectivity.
文摘The aim of this paper is to compare block-structured linear programming (LP) models against other practical optimization methods for solving downstream product refinery problems using a solution method different from the existing ones (like mixed integer linear programming (MILP) method). The work X-rays the Nigerian petroleum refining industries and their channel of distribution in the local setting and identifies the critical features of scheduling and allocation of refined crude products; either for distribution within the country or for exportation to the international market. Applying our model to the distribution model, the computational results reveal a better route with lowest transportation cost for the scheduling problem and the best optimal blend with higher revenue for the production problem.