Artificial intelligence is a frontier science for simulating,extending and expanding human intelligence,theoretical methods,technologies and application systems.Through the survey and analysis of the current situation...Artificial intelligence is a frontier science for simulating,extending and expanding human intelligence,theoretical methods,technologies and application systems.Through the survey and analysis of the current situation of the integration of artificial intelligence into the construction of the teacher team,the corresponding research plan and path are formulated,and the artificial intelligence is fully integrated with the construction of the professional teacher team of acupuncture and tuina,and specific practices are carried out.The practical research path includes the construction of the corresponding artificial intelligence education analysis system and platform for the teaching staff,the formulation and practice of artificial intelligence training and training plans for the teaching staff,the daily intelligent education of the teaching staff and the sustainable improvement of lifelong intelligent education literacy.Through this study,it is hoped that the teaching ability and level of acupuncture and tuina teachers will be improved,and more new ideas and methods will be provided for the training and education of acupuncture and tuina professionals.展开更多
Cultivating application-oriented talents have become essential in vocational and higher education.This concept also applies to BIM intelligent construction programs.Based on literature review and general observations,...Cultivating application-oriented talents have become essential in vocational and higher education.This concept also applies to BIM intelligent construction programs.Based on literature review and general observations,we analyzed the connotation,key points,and value of developing a BIM intelligent construction program based on application-oriented talent cultivation.We also identified problems in the development of the program such as lack of comprehensive planning and the school being the sole authority in program development.Therefore,we proposed several strategies to address these problems,including systematic program development planning and fostering a multi-faceted partnership between schools and the industry.The goal is to provide valuable insights for the development of relevant programs in the new era.展开更多
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remed...Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remedial actions to keep the project on schedule and to budget. However, pertinent barriers can suppress the realization of the benefits of an accurate assessment of construction progress. This study aims to identify, examine and prioritize the critical barriers militating against accurate project progress measurement in the Ghanaian construction industry. Sixteen barriers identified from the literature were administered in a questionnaire survey to professionals with tier one construction firms and consultants. Sixty experienced construction professionals practising with tier-one construction firms and consultancy services took part in the survey. The relative importance index technique was used to rank the factors and correlation in responses of the two parties tested by the Mann-Whitney <em>U</em> statistics. The most critical barriers perceived by the professionals were 1) Reliance on Supervisor’s Judgement, 2) Generic and Non-Systematic Approach, 3) Variable Quality of Data and 4) Intricate Measurement Reports. Other highly ranked barriers include 5) Lack of Timely Information, 6) Laborious Data Gathering and 7) Quality Integration Constraint. The findings underpin the need to minimize dependence on subjective opinions and mere experiences of supervisors for assessment of project progress in this age of information technology. Incorporation of a level of automation into traditional progress methods will not only reduce human errors introduced into manually collected data but facilitate visualization of progress reports. Contiguous to a clear specification of the method of progress measurement in the contract document, a system that conveniently integrates cost, time and scope of work into progress measurement must be pursued. Addressing these identified critical barriers will consolidate current construction progress management practices.展开更多
The study evaluates the factors confronting the present-day construction practices in South-East Nigeria. Being a survey research, questionnaires containing information relating to factors/challenges affecting constru...The study evaluates the factors confronting the present-day construction practices in South-East Nigeria. Being a survey research, questionnaires containing information relating to factors/challenges affecting construction practices were randomly administered to selected construction practitioners in South-Eastern States of Nigeria. Accordingly, a total of 240 questionnaires were administered to the selected respondents while 160 copies were completed, returned and found useful. Thus, giving a response rate of 66.67%. Data collected were analysed and presented using percentages, mean scores, principal and factor analysis, z-test and tables. The study found that the core factors that constrain present-day construction in the study area are issues related to inadequate/dearth of technical and managerial expertise, corruption and poor project planning and control;which significantly affect operational effectiveness of the construction industry in the study area. Therefore, the study concluded by recommending that thorough capacity building through training or retraining programme which should centre on areas of the issues identified should be religiously pursued in the study area.展开更多
With the increasing of aging, community pension is becoming the choice of the majority of elderly people, and the quality of community care service is closely related to the professional level of nursing staff. Throug...With the increasing of aging, community pension is becoming the choice of the majority of elderly people, and the quality of community care service is closely related to the professional level of nursing staff. Through the questionnaire survey, the nursing staff' s high age and low education, lack of related legal basis, lack of assessment standard, the public do not understand professional construction and lack of corresponding incentive mechanism is the main bottleneck of the professional development of the nursing staff.We can through some countermeasures,such as improve the mechanism of personnel protection for community nursing staff, improve management mechanism and legal mechanism, strengthen the ideological understanding understanding of the professional construction of community nursing staffand so on ,to improve the professional level of community nursing staff, in order to better improve the service quality of nurse.展开更多
基金Supported by National TCM Examination Scientific Research Project in 2021(TC2021022)Jilin Province Vocational Education and Adult Education Teaching Reform Research Project in 2022(2022ZCY295)+3 种基金Higher Education Scientific Research Project of Jilin Association for Higher Education in 2021(JGJX2021D170)Jilin Province Educational Science"13th Five-Year"Plan 2020 Annual Project(GH20169)Changchun University of Traditional Chinese Medicine Higher Education Teaching Research Project in 2022(XJSZ202240)Jilin Higher Education Scientific Research Project in 2022(JGJX2022D129)。
文摘Artificial intelligence is a frontier science for simulating,extending and expanding human intelligence,theoretical methods,technologies and application systems.Through the survey and analysis of the current situation of the integration of artificial intelligence into the construction of the teacher team,the corresponding research plan and path are formulated,and the artificial intelligence is fully integrated with the construction of the professional teacher team of acupuncture and tuina,and specific practices are carried out.The practical research path includes the construction of the corresponding artificial intelligence education analysis system and platform for the teaching staff,the formulation and practice of artificial intelligence training and training plans for the teaching staff,the daily intelligent education of the teaching staff and the sustainable improvement of lifelong intelligent education literacy.Through this study,it is hoped that the teaching ability and level of acupuncture and tuina teachers will be improved,and more new ideas and methods will be provided for the training and education of acupuncture and tuina professionals.
基金Chongqing Municipal Education Science Planning ProjectEducational Reform Special ProjectPractice Research on Integrated Teaching Reform of“Post Course Competition Certificate”for BIM Intelligent Construction Major in Vocational Schools(K23ZG3250169)。
文摘Cultivating application-oriented talents have become essential in vocational and higher education.This concept also applies to BIM intelligent construction programs.Based on literature review and general observations,we analyzed the connotation,key points,and value of developing a BIM intelligent construction program based on application-oriented talent cultivation.We also identified problems in the development of the program such as lack of comprehensive planning and the school being the sole authority in program development.Therefore,we proposed several strategies to address these problems,including systematic program development planning and fostering a multi-faceted partnership between schools and the industry.The goal is to provide valuable insights for the development of relevant programs in the new era.
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
文摘Accurate project progress measurement is critical for effective project management. Besides guarantying smooth work progress, it affords project managers the chance to identify early warning signs for peremptory remedial actions to keep the project on schedule and to budget. However, pertinent barriers can suppress the realization of the benefits of an accurate assessment of construction progress. This study aims to identify, examine and prioritize the critical barriers militating against accurate project progress measurement in the Ghanaian construction industry. Sixteen barriers identified from the literature were administered in a questionnaire survey to professionals with tier one construction firms and consultants. Sixty experienced construction professionals practising with tier-one construction firms and consultancy services took part in the survey. The relative importance index technique was used to rank the factors and correlation in responses of the two parties tested by the Mann-Whitney <em>U</em> statistics. The most critical barriers perceived by the professionals were 1) Reliance on Supervisor’s Judgement, 2) Generic and Non-Systematic Approach, 3) Variable Quality of Data and 4) Intricate Measurement Reports. Other highly ranked barriers include 5) Lack of Timely Information, 6) Laborious Data Gathering and 7) Quality Integration Constraint. The findings underpin the need to minimize dependence on subjective opinions and mere experiences of supervisors for assessment of project progress in this age of information technology. Incorporation of a level of automation into traditional progress methods will not only reduce human errors introduced into manually collected data but facilitate visualization of progress reports. Contiguous to a clear specification of the method of progress measurement in the contract document, a system that conveniently integrates cost, time and scope of work into progress measurement must be pursued. Addressing these identified critical barriers will consolidate current construction progress management practices.
文摘The study evaluates the factors confronting the present-day construction practices in South-East Nigeria. Being a survey research, questionnaires containing information relating to factors/challenges affecting construction practices were randomly administered to selected construction practitioners in South-Eastern States of Nigeria. Accordingly, a total of 240 questionnaires were administered to the selected respondents while 160 copies were completed, returned and found useful. Thus, giving a response rate of 66.67%. Data collected were analysed and presented using percentages, mean scores, principal and factor analysis, z-test and tables. The study found that the core factors that constrain present-day construction in the study area are issues related to inadequate/dearth of technical and managerial expertise, corruption and poor project planning and control;which significantly affect operational effectiveness of the construction industry in the study area. Therefore, the study concluded by recommending that thorough capacity building through training or retraining programme which should centre on areas of the issues identified should be religiously pursued in the study area.
文摘With the increasing of aging, community pension is becoming the choice of the majority of elderly people, and the quality of community care service is closely related to the professional level of nursing staff. Through the questionnaire survey, the nursing staff' s high age and low education, lack of related legal basis, lack of assessment standard, the public do not understand professional construction and lack of corresponding incentive mechanism is the main bottleneck of the professional development of the nursing staff.We can through some countermeasures,such as improve the mechanism of personnel protection for community nursing staff, improve management mechanism and legal mechanism, strengthen the ideological understanding understanding of the professional construction of community nursing staffand so on ,to improve the professional level of community nursing staff, in order to better improve the service quality of nurse.