期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
1
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model South-to-North Water Diversion Project
下载PDF
Nonlinear Program Construction and Verification Method Based on Partition Recursion and Morgan's Refinement Rules 被引量:2
2
作者 WANG Changjing CAO Zhongxiong +3 位作者 YU Chuling WANG Changchang HUANG Qing ZUO Zhengkang 《Wuhan University Journal of Natural Sciences》 CAS CSCD 2023年第3期246-256,共11页
The traditional program refinement strategy cannot be refined to an executable program,and there are issues such as low verification reliability and automation.To solve the above problems,this paper proposes a nonline... The traditional program refinement strategy cannot be refined to an executable program,and there are issues such as low verification reliability and automation.To solve the above problems,this paper proposes a nonlinear program construction and verification method based on partition recursion and Morgan’s refinement rules.First,we use recursive definition technique to characterize the initial specification.The specification is then transformed into GCL(Guarded Command Language)programs using loop invariant derivation and Morgan’s refinement rules.Furthermore,VCG(Verification Condition Generator)is used in the GCL program to generate the verification condition automatically.The Isabelle theorem prover then validates the GCL program’s correctness.Finally,the GCL code generates a C++executable program automatically via the conversion system.The effectiveness of this method is demonstrated using binary tree preorder traversal program construction and verification as an example.This method addresses the problem that the construction process’s loop invariant is difficult to obtain and the refinement process is insufficiently detailed.At the same time,the method improves verification process automation and reduces the manual verification workload. 展开更多
关键词 program construction partition recursion Morgan's refinement rules loop invariant VCG Isabelle theorem prover
原文传递
Program Construction Method for Sequential Statistics Class Algorithm Based on Bidirectional Scanning Induction
3
作者 ZUO Zhengkang WANG Yuekun +4 位作者 LIANG Zanyang SU Wei HUANG Qing WANG Yuan WANG Changjing 《Wuhan University Journal of Natural Sciences》 CAS CSCD 2023年第6期483-492,共10页
The program construction process is based on rigorous mathematical reasoning,which leads to a fully correct algorithmic program via step-by-step refinement of the program specifications.The existing program constructi... The program construction process is based on rigorous mathematical reasoning,which leads to a fully correct algorithmic program via step-by-step refinement of the program specifications.The existing program construction methods'refinement process is partly based on individual subjective speculation and analysis,which lacks a precise guidance method.Meanwhile,efficiency factors have usually been ignored in the construction process,and most of the constructed abstract programs cannot be run directly by machines.In order to solve these problems,a novel program construction method for the sequence statistical class algorithms based on bidirectional scan induction is proposed in this paper.The method takes into account the efficiency factor and thus improves the Morgan's refinement calculus.Furthermore,this paper validates the method's feasibility using an efficiency-sensitive sequential statistics class algorithm as a program construction example.The method proposed in this paper realizes the correctness construction process from program specifications to efficient executable programs. 展开更多
关键词 program construction bidirectional scanning induction sequential statistics Morgan's refinement calculus
原文传递
Research on the Optimization Approach for Cargo Oil Tank Design Based on the Improved Particle Swarm Optimization Algorithm 被引量:1
4
作者 姜文英 林焰 +1 位作者 陈明 于雁云 《Journal of Shanghai Jiaotong university(Science)》 EI 2015年第5期565-570,共6页
Based on the improved particle swarm optimization(PSO) algorithm,an optimization approach for the cargo oil tank design(COTD) is presented in this paper.The purpose is to design an optimal overall dimension of the car... Based on the improved particle swarm optimization(PSO) algorithm,an optimization approach for the cargo oil tank design(COTD) is presented in this paper.The purpose is to design an optimal overall dimension of the cargo oil tank(COT) under various kinds of constraints in the preliminary design stage.A non-linear programming model is built to simulate the optimization design,in which the requirements and rules for COTD are used as the constraints.Considering the distance between the inner shell and hull,a fuzzy constraint is used to express the feasibility degree of the double-hull configuration.In terms of the characteristic of COTD,the PSO algorithm is improved to solve this problem.A bivariate extremum strategy is presented to deal with the fuzzy constraint,by which the maximum and minimum cargo capacities are obtained simultaneously.Finally,the simulation demonstrates the feasibility and effectiveness of the proposed approach. 展开更多
关键词 cargo oil tank optimization design nonlinear programming improved particle swarm optimization(PSO)algorithm fuzzy constraint construction feasibility degree
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部