According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis...Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u...In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.展开更多
Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder w...Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder with unjustified advantages at the expense of the owner. Unfortunately, limited tools and techniques are currently available to identify and detect unbalanced bids during the evaluation process. This paper presents an innovative detection tool to identify unbalanced bids in unit price contracts during the bid evaluation process. The proposed technique develops BMDI graphs to visualize total markup variation patterns during the project lifetime to detect unbalanced bids. The proposed method also uses Monte Carlo simulation to take in consideration the impact of cost uncertainties and risks. An illustrative example was presented to show the capabilities and features of the proposed method in determining the status of submitted bids during the evaluation process.展开更多
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.
文摘Unbalanced bidding is a cash flow management strategy that is recognized as an illegal/disqualifying practice by public owners;and unethical practice by most private owners. This practice provides the awarded bidder with unjustified advantages at the expense of the owner. Unfortunately, limited tools and techniques are currently available to identify and detect unbalanced bids during the evaluation process. This paper presents an innovative detection tool to identify unbalanced bids in unit price contracts during the bid evaluation process. The proposed technique develops BMDI graphs to visualize total markup variation patterns during the project lifetime to detect unbalanced bids. The proposed method also uses Monte Carlo simulation to take in consideration the impact of cost uncertainties and risks. An illustrative example was presented to show the capabilities and features of the proposed method in determining the status of submitted bids during the evaluation process.