Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced tech...The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.展开更多
The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
China established Xiong’an New Area in Hebei Province in 2017,which is planned to accommodate about 5 million people,aiming to relieve Beijing City of the functions non-essential to its role as China’s capital and t...China established Xiong’an New Area in Hebei Province in 2017,which is planned to accommodate about 5 million people,aiming to relieve Beijing City of the functions non-essential to its role as China’s capital and to expedite the coordinated development of the Beijing-Tianjin-Hebei region.From 2017 to 2021,the China Geological Survey(CGS)took the lead in multi-factor urban geological surveys involving space,resources,environments,and disasters according to the general requirements of“global vision,international standards,distinctive Chinese features,and future-oriented goals”in Xiong’an New Area,identifying the engineering geologic conditions and geologic environmental challenges of this area.The achievements also include a 3D engineering geological structure model for the whole area,along with“one city proper and five clusters”,insights into the ecology and the background endowment of natural resources like land,geothermal resources,groundwater,and wetland of the area before engineering construction,a comprehensive monitoring network of resources and environments in the area,and the“Transparent Xiong’an”geological information platform that is open,shared,dynamically updated,and three-dimensionally visualized.China’s geologists and urban geology have played a significant role in the urban planning and construction of Xiong’an New Area,providing whole-process geological solutions for urban planning,construction,operation and management.The future urban construction of Xiong’an New Area will necessitate the theoretical and technical support of earth system science(ESS)from various aspects,and the purpose is to enhance the resilience of the new type of city and to provide support for the green,low-carbon,and sustainable development of this area.展开更多
Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c...Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.展开更多
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
Due to the continuous development of urbanization,it had a serious impact on urban ecology.Therefore,techniques to improve the living environment and quality of life in urban areas as well as ways to improve aesthetic...Due to the continuous development of urbanization,it had a serious impact on urban ecology.Therefore,techniques to improve the living environment and quality of life in urban areas as well as ways to improve aesthetics and greening of urban gardens have gradually become the focus of attention.Re-building and arranging the green plant community rationally can effectively improve the quality of people’s living environment.Besides,by maximizing ecological functions,it can better improve the quality of urban environmental.This paper introduces key technologies of green planting construction in urban landscaping projects and suggest ways to improve the urban ecological environment by viewing it from existing problems in the current urban ecological environment.展开更多
On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project i...On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between展开更多
The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the desi...The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the design context, increasing the accuracy of the project preparation and the decreasing additional costs and delays of the construction work. The main objective of the present research is to provide an overview of the state of the art of BIM applications, namely, concerning the construction planning. For that, the generation of a BIM 3D model, involving the disciplines of architecture, structures and water supply system was performed. After, over the model a conflict analysis was applied, in order to verify the consistency of all the disciplines, when linked together. In order to obtain a visual simulation of the construction process, the correspondent 4D BIM model was also generated. Along the development of the study, distinct BIM software was applied over a case study. The main remarks of the capacities of the software, as well as the benefits and limitations verified were identified.展开更多
Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulati...Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.展开更多
Wetland is one of the richest biodiversity areas in the earth. The main purpose of establishing wetland protected area is to protect biodiversity, and the protection of ecosystem diversity and landscape diversity is t...Wetland is one of the richest biodiversity areas in the earth. The main purpose of establishing wetland protected area is to protect biodiversity, and the protection of ecosystem diversity and landscape diversity is the key to protect biodiversity. In order to protect regional ecosystem and landscape, it is a good way to establish wetland comprehensive protected area which connected wetland nature reserves by habitat corridors. The Sanjiang Plain as a study area, its landscape evaluation index system on wetland protected area was studied, and some problems on landscape planning and ecology construction were further approached in this paper.It showed that establishing wetland comprehensive protected area is very important to protect regional wetlands, to maintain ecological balance, and to improve the sustainable development of agriculture and industry in this region.展开更多
Mountain ecosystem, on the earth, has plenty of natural resources. In Himachal Pradesh all the rivers are snowfed and therefore rich in water resources. These resources have been supporting enough for the generation o...Mountain ecosystem, on the earth, has plenty of natural resources. In Himachal Pradesh all the rivers are snowfed and therefore rich in water resources. These resources have been supporting enough for the generation of electricity through introducing hydropower projects since the last decade However, every developmental activity has its own negative impacts on the surrounding environment. Due to the fragile nature of topography and delicacy of ecology of the Himalaya, it results in lot of disturbances because of high degree of human interferences like construction of major hydropower projects. The increased extent of geological hazards, such as landslides, rock fall and soil erosion, have mainly due to alike developmental interventions in the natural ecosystem. So understanding and analysing such impacts of the hydropower projects have mainly been on the environment in various forms but natural hazards have been frequent ones. The present study, therefore, focuses mainly on the Parbati Stage II (800 MW) and the Parbati Stage III (520 MW) hydropower projects; both of which fall within the Kullu district of Himachal Pradesh. Based on the perception survey of the local communities, the existing land use pattern, status of total acquired land of the residents by hydropower projects, frequent natural hazards and resultant loss to the local communities due to upcoming construction of hydropower projects surrounding to the Parbati Stage II and III have been analysed in the paper. Also, the preventive measures to mitigate these adverse impacts have been suggested to strengthen these projects in eco-friendly manner in the mountain context.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. An model including social economy, ecological environment and resources was established with ANP method. The eva...Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. An model including social economy, ecological environment and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.展开更多
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
文摘The construction quality and efficiency of construction engineering are directly related to people's daily life.Therefore,construction enterprises must keep pace with the times and actively introduce advanced technical means into architectural design,project construction,and management,so as to ensure the quality and safety of construction to the maximum extent.The application of BIM not only improves the efficiency of construction and construction quality,but also realizes the control of construction cost.This study explores and analyzes the advantages of BIM as well as proposes application strategies of BIM in architectural design,project construction,and management,hoping to contribute to the smooth construction of construction engineering.
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
基金supported by two projects initialed China Geological Survey: “Evaluation on Soil and Water Quality and Geological Survey in Xiong’an New Area (DD20189122)” and “Monitoring and Evaluation on Carrying Capacity of Resource and Environment in BeijingTianjin-Hebei Coordinated Development Zone and Xiong’an New Area (DD20221727)”
文摘China established Xiong’an New Area in Hebei Province in 2017,which is planned to accommodate about 5 million people,aiming to relieve Beijing City of the functions non-essential to its role as China’s capital and to expedite the coordinated development of the Beijing-Tianjin-Hebei region.From 2017 to 2021,the China Geological Survey(CGS)took the lead in multi-factor urban geological surveys involving space,resources,environments,and disasters according to the general requirements of“global vision,international standards,distinctive Chinese features,and future-oriented goals”in Xiong’an New Area,identifying the engineering geologic conditions and geologic environmental challenges of this area.The achievements also include a 3D engineering geological structure model for the whole area,along with“one city proper and five clusters”,insights into the ecology and the background endowment of natural resources like land,geothermal resources,groundwater,and wetland of the area before engineering construction,a comprehensive monitoring network of resources and environments in the area,and the“Transparent Xiong’an”geological information platform that is open,shared,dynamically updated,and three-dimensionally visualized.China’s geologists and urban geology have played a significant role in the urban planning and construction of Xiong’an New Area,providing whole-process geological solutions for urban planning,construction,operation and management.The future urban construction of Xiong’an New Area will necessitate the theoretical and technical support of earth system science(ESS)from various aspects,and the purpose is to enhance the resilience of the new type of city and to provide support for the green,low-carbon,and sustainable development of this area.
文摘Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work.
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
文摘Due to the continuous development of urbanization,it had a serious impact on urban ecology.Therefore,techniques to improve the living environment and quality of life in urban areas as well as ways to improve aesthetics and greening of urban gardens have gradually become the focus of attention.Re-building and arranging the green plant community rationally can effectively improve the quality of people’s living environment.Besides,by maximizing ecological functions,it can better improve the quality of urban environmental.This paper introduces key technologies of green planting construction in urban landscaping projects and suggest ways to improve the urban ecological environment by viewing it from existing problems in the current urban ecological environment.
文摘On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between
文摘The Building Information Modelling (BIM) methodology has been adopted in the construction industry, supporting the development of projects. Its implementation has improved the collaboration and integration in the design context, increasing the accuracy of the project preparation and the decreasing additional costs and delays of the construction work. The main objective of the present research is to provide an overview of the state of the art of BIM applications, namely, concerning the construction planning. For that, the generation of a BIM 3D model, involving the disciplines of architecture, structures and water supply system was performed. After, over the model a conflict analysis was applied, in order to verify the consistency of all the disciplines, when linked together. In order to obtain a visual simulation of the construction process, the correspondent 4D BIM model was also generated. Along the development of the study, distinct BIM software was applied over a case study. The main remarks of the capacities of the software, as well as the benefits and limitations verified were identified.
基金Project supported by the Research Grant Council of Hong Kong,China
文摘Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance.
文摘Wetland is one of the richest biodiversity areas in the earth. The main purpose of establishing wetland protected area is to protect biodiversity, and the protection of ecosystem diversity and landscape diversity is the key to protect biodiversity. In order to protect regional ecosystem and landscape, it is a good way to establish wetland comprehensive protected area which connected wetland nature reserves by habitat corridors. The Sanjiang Plain as a study area, its landscape evaluation index system on wetland protected area was studied, and some problems on landscape planning and ecology construction were further approached in this paper.It showed that establishing wetland comprehensive protected area is very important to protect regional wetlands, to maintain ecological balance, and to improve the sustainable development of agriculture and industry in this region.
文摘Mountain ecosystem, on the earth, has plenty of natural resources. In Himachal Pradesh all the rivers are snowfed and therefore rich in water resources. These resources have been supporting enough for the generation of electricity through introducing hydropower projects since the last decade However, every developmental activity has its own negative impacts on the surrounding environment. Due to the fragile nature of topography and delicacy of ecology of the Himalaya, it results in lot of disturbances because of high degree of human interferences like construction of major hydropower projects. The increased extent of geological hazards, such as landslides, rock fall and soil erosion, have mainly due to alike developmental interventions in the natural ecosystem. So understanding and analysing such impacts of the hydropower projects have mainly been on the environment in various forms but natural hazards have been frequent ones. The present study, therefore, focuses mainly on the Parbati Stage II (800 MW) and the Parbati Stage III (520 MW) hydropower projects; both of which fall within the Kullu district of Himachal Pradesh. Based on the perception survey of the local communities, the existing land use pattern, status of total acquired land of the residents by hydropower projects, frequent natural hazards and resultant loss to the local communities due to upcoming construction of hydropower projects surrounding to the Parbati Stage II and III have been analysed in the paper. Also, the preventive measures to mitigate these adverse impacts have been suggested to strengthen these projects in eco-friendly manner in the mountain context.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. An model including social economy, ecological environment and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.