On December 26, 2009, in the main control room of Shanghai Fengxian Converter Station, the voltage value on the screen rose from zero to 800 kV. This represented the demonstrative ±800-kV
Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are...Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are provided to improve the future work.展开更多
文摘On December 26, 2009, in the main control room of Shanghai Fengxian Converter Station, the voltage value on the screen rose from zero to 800 kV. This represented the demonstrative ±800-kV
文摘Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are provided to improve the future work.