期刊文献+
共找到83篇文章
< 1 2 5 >
每页显示 20 50 100
Discussion on Construction Project Cost Budget Settlement Review
1
作者 Hongfeng Liu Yumin Yuan 《Journal of Architectural Research and Development》 2024年第1期43-48,共6页
Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the c... Construction project cost control involves many complex contents,forming a large amount of data information.If the processing method is unreasonable,it will likely affect the cost control efficiency.Therefore,in the current construction project management,the review of project cost budget settlement is the focus to solve the cost management problems of construction projects and promote the development of the construction industry.This article mainly analyzes the influencing factors and current situation of construction project cost budget settlement review,and based on this,it explores the project cost budget settlement review strategy to promote the healthy development of construction project cost work. 展开更多
关键词 construction project COST Budget settlement Review strategy
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
2
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Design of Aided Decision-Making Program for Prioritizing Construction Projects in Urban Road Network Planning
3
作者 任刚 王炜 顾志康 《Journal of Southeast University(English Edition)》 EI CAS 2002年第3期249-253,共5页
The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol... The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ... 展开更多
关键词 prioritizing construction projects program design urban road network planning aided decision making
下载PDF
Application of system dynamics for assessment of sustainable performance of construction projects 被引量:10
4
作者 SHENL.Y. 吴宇哲 +1 位作者 CHANE.H.W. HAOJ.L. 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2005年第4期339-349,共11页
Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulati... Sustainable performance is expected to become a major factor when examining the feasibility of a construction project in terms of its life cycle performance. The study on which this paper is based developed a simulation model, using system dy- namics methodology, to assess the sustainable performance of projects. Three major factors are used to examine project sus- tainable performance (PSP): the sustainability of economic development (E), the sustainability of social development (S), and the sustainability of environmental development (En). Sustainable development ability (SDA) was used as a prototype to evaluate the degree of sustainable performance. The simulation software ‘ithink’ was used to help with the application of the model to a real life case. This paper explains and demonstrates the procedures used to develop the model and finally offers an approach for assessing the feasibility of a construction project in terms of its sustainable performance. 展开更多
关键词 construction project Project life cycle Project sustainable performance (PSP) Sustainable development ability(SDA) System dynamics Simulation
下载PDF
Control and Management of Construction Project Cost 被引量:1
5
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 construction project construction stage Project cost Control and management
下载PDF
Research on the railway construction process quality model based on the state space method 被引量:1
6
作者 Lu Shoudong Zhou Guohua +1 位作者 Chen Haifeng Zhao Guotang 《Engineering Sciences》 EI 2013年第5期54-60,共7页
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ... In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project. 展开更多
关键词 railway construction project "white box" model state transition equation process quality
下载PDF
Research on Delay Risks of EPC Hydropower Construction Projects in Vietnam 被引量:1
7
作者 Mai Sy Hung Jianqiong Wang 《Journal of Power and Energy Engineering》 2016年第4期9-16,共8页
In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hy... In recent years, in Vietnam, economy has been developing rapidly. To ensure rapid and sustainable economic growth, strong support from the energy sector is required. Governments in Vietnam have invested in numerous hydropower projects, many of which employ the EPC (Engineering, Procurement and Construction) contract. However, the EPC general contractors are facing many difficulties, resulting in schedule delays and considerable losses. This research is conducted to highlight the main risk factors in the delays of hydropower construction projects in Vietnam. The research employs the method of statistical calculations and risk analysis to obtain feedback from experts participating in similar projects. The research outcomes are as follows: identifying the risks that can cause delays in EPC hydroelectric construction projects in Vietnam;calculating and classifying the degree of impact of each risk to the progress of the construction. The practical significance of this study is to ensure the timely completion of projects, benefits for the investors, and the EPC general contractors. 展开更多
关键词 ENGINEERING Procurement and construction (EPC) Risk Research EPC Hydropower Project construction Projects
下载PDF
Application Research of Blended Teaching based on Duifene Teaching Platform:Modules on Construction Project Management 被引量:1
8
作者 Jingjing Sun 《Journal of Contemporary Educational Research》 2021年第5期20-24,共5页
The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as ... The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences. 展开更多
关键词 Duifene teaching platform construction Project Management Blended teaching
下载PDF
The research of breakdown structure and coding system for construction project
9
作者 丁大勇 金维兴 李培 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第4期428-432,共5页
Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similariti... Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions. 展开更多
关键词 construction project breakdown structure comprehensive breakdown system
下载PDF
Multi-Criteria Decision-Making for Power Grid Construction Project Investment Ranking Based on the Prospect Theory Improved by Rewarding Good and Punishing Bad Linear Transformation
10
作者 Shun Ma Na Yu +3 位作者 Xiuna Wang Shiyan Mei Mingrui Zhao Xiaoyu Han 《Energy Engineering》 EI 2023年第10期2369-2392,共24页
Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint... Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided. 展开更多
关键词 Power grid construction project investment ranking RGPBIT operator MCDM optimal weight
下载PDF
Control Measures of Soil Erosion in a Typical Construction Project Area ( Dina 2 Gas Field)
11
作者 Huiming Lv 《Meteorological and Environmental Research》 CAS 2013年第2期53-58,共6页
To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as... To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field. 展开更多
关键词 Typical construction project area Dina 2 gas field Ecological environment Soil erosion Control measures China
下载PDF
Study of Quality Management in Construction Projects
12
作者 Tan Chin-Keng Abdul-Rahman, Hamzah 《Chinese Business Review》 2011年第7期542-552,共11页
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi... This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia. 展开更多
关键词 quality management construction project management PRACTICES management commitment PROBLEMS
下载PDF
Synthetic Evaluation on Decision of Public Bidding for Construction Project
13
作者 孙涛 颜秋许 《Journal of China University of Mining and Technology》 2002年第1期48-51,56,共5页
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis... Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper. 展开更多
关键词 construction project public bidding DECISION evaluation method
下载PDF
Emerging Challenges in the Completion of Construction Projects through Public Private Partnerships: Empirical Literature Review
14
作者 Pamela Akinyi Oyieyo 《Journal of Building Construction and Planning Research》 2020年第4期263-272,共10页
The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private secto... The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private sector. This has a positive impact on the public in terms of improving their well-being. This literature review attempts to compare the challenges encountered in implementation of PPP projects across the world, with a view to determining cross cutting challenges and recommendations for developing countries. A literature review was conducted for empirical studies focusing on construction projects. The studies are reviewed by analyzing the methodology used and conclusions made to identify the geographical study area, Public Private Partnership project financing model, emerging challenges and recommendation for future project management. The literature search was based on four keywords: construction projects, completion of construction projects, public private partnership, challenges in construction projects. Thus, a total of 11 empirical studies were identified for review in Europe, Asia and Africa. The review revealed that most risk factors affecting project completion can be categorized as human and organizational factors and unknown geotechnical conditions that were not known beforehand. Specifically, project owners’ interference was also attributable to delays with the delays having significant implications for project execution. Risks have great impact on the performance of construction projects because they affect their quality, time and cost. The general remedy to such potential risk factors is adoption of reliable prediction mechanisms which would estimate those factors using a probabilistic model that does not rely on expert judgments as they tend to be unreliable. 展开更多
关键词 construction Projects Completion of construction Projects Public Private Partnership Challenges in construction Projects
下载PDF
Remarkable Achievements in the Construction of Project 211 in the University of Petroleum
15
《Petroleum Science》 SCIE CAS CSCD 2004年第3期F002-F002,共1页
The Unibersity of Petroleum is one of the country's key universities that first conduct the which the Chinese
关键词 PROJECT Remarkable Achievements in the construction of Project 211 in the University of Petroleum
下载PDF
Role of Materials and Labor Allocation in Cost-Effective Soundproof House Construction Projects
16
作者 Ahmed Ali Khatatbeh Yazan Alzubi 《Journal of Civil Engineering and Architecture》 2020年第12期668-675,共8页
There is increase in the issues related to noise pollution due to their negative impacts on the individual.The ability of materials to absorb noise creates future problems for the building and for the residents;althou... There is increase in the issues related to noise pollution due to their negative impacts on the individual.The ability of materials to absorb noise creates future problems for the building and for the residents;although,temporary presence of construction noise holds minor importance for some projects.The study aims to assess the role of materials and labour allocation in cost-effective soundproof house construction projects.The efficiency of synthetic foam,polyurethane and cellular materials was explored in providing insulation in multiple construction projects.Various soundproofing solutions such as rubber,gypsum,homasote,plywood and natural fibres were discussed in the light of cost-effectivity.Soundproofing can be guaranteed by using environmentally-friendly,natural,degradable and recycled products in the construction industry.The study helped in highlighting the materials that can help in building soundproof construction projects.The results indicated the need for applying modern,synthetic,cost-effective and green sound-absorbing systems in construction projects.The safety along with minimal maintenance and longevity of the completed construction projects is maintained by advancements in technological efficiency of building materials.The adaptation of Western construction technologies will ensure success in building construction projects as modern building materials play a significant role in building of sound proof construction buildings. 展开更多
关键词 Labor allocation COST-EFFECTIVE soundproofing construction projects
下载PDF
On the Application of IPRA Tool in Risk Assessment and Management of International Construction Projects
17
作者 Shadab Alipour Tadeh Zirakian David Boyajian 《Journal of Civil Engineering and Architecture》 2017年第2期135-140,共6页
Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of const... Construction companies face threats from competition and must be able to adjust to modem technology and changes in customer expectations. These issues require efficient risk management techniques. The success of construction companies running projects in international markets depends on how the risks arise from the host country conditions as well as the project specific risk factors. Successful management of risks requires identification of risks, construction of a risk model which can be used to assess the magnitude of risks, and implementation of response strategies so that an acceptable risk-return balance can be achieved. The project success usually depends on the combination of all risks, response strategies used to mitigate risks, and a company's ability to manage them. There exists a need to develop risk models containing the risks of doing business in international markets and factors that affect manageability of these risks. One of the market's critical challenges is scheduled management and the understanding and application of program management. This paper uses systematic risk identification, classification and analysis, and measurement and response methodologies to help international contractors quantify the risks of project development and accomplishment. 展开更多
关键词 International construction projects IPRA tool fuzzy risk assessment risk identification risk management.
下载PDF
The Relationship between Financial Reporting System and Project Success: A Case of Construction Projects in UAE
18
作者 Shatha Mustafa Hussain Faisal Khan +1 位作者 Muhamad M.S.Jumaa Sharif Ullah Jan 《Journal of Modern Accounting and Auditing》 2020年第8期360-375,共16页
The purpose of this paper is to deliver a better perception of the project success,and how reporting system might increase the probability of project success in construction projects in UAE.Further,it aims at explorin... The purpose of this paper is to deliver a better perception of the project success,and how reporting system might increase the probability of project success in construction projects in UAE.Further,it aims at exploring the relationship between effective reporting system in terms of the characteristic of its outputs(mainly effectiveness of financial reporting system)and project success.Semi-structured interviews with a number of interior auditors,accountants,and chief financial officers(CFOs)from different corporations in construction sector in UAE in order to recognize how effective reporting system in terms of the characteristic of its outputs(broad scope,timeliness,aggregation,and integration)might contribute to increase the probability of project success.There are several success factors in construction projects in UAE,thus it is very hard to capture all these factors in one paper.Hence,this paper is not considering all project success factors rather it focuses on the characteristic of outputs of the reporting system generally and the financial reporting system particularly(broad scope,timeliness,aggregation,and integration),as most of the studies in the literature considered the reporting system as a key factor of project success.This paper adds to both project management and accounting research by evidencing results from an exploration how effective reporting might impact the project success,with valuable implications for standard officials,customers,investors,stakeholders,sponsors,shareholders,CFOs,project developer,consultants,internal auditors,and accounting academics.The effective reporting system in United Arab Emirates(UAE)construction projects enables possessors,customers,and contractors of projects to get timely information about the progress of project in a brief and significant format which in turn improve the decision-making process and contribute to project success.This paper implies a contribution for both project management literature and accounting research by investigative the effectiveness of reporting system in project successes from historical point of view and contemporary point of view. 展开更多
关键词 effective reporting system construction projects in UAE project success qualitative study
下载PDF
Effects. of Change Orders through Technical Programs on Construction Projects in Jordan
19
作者 Ahmed Ali Khatatbeh 《Journal of Civil Engineering and Architecture》 2016年第11期1213-1219,共7页
Regarding construction projects, no project is implemented exactly as planned. Changes in construction projects are common due to the dynamic nature of the construction process. It is necessary to use effective and ap... Regarding construction projects, no project is implemented exactly as planned. Changes in construction projects are common due to the dynamic nature of the construction process. It is necessary to use effective and appropriate tools by project management to support decision-making and control changes during all stages of project implementation. This study examined the effects of change orders through technical programs on construction projects in Jordan and focused on how to overcome these effects by making usual orders that can be handled by each of the contracting parties. Also, this study added an advantage by not addressing the negative effects of change orders, but it provided many positive effects of change orders by using technical programs method, which has not been yet researched in Jordanian studies in particular, and in global studies in general. The researcher used descriptive analytical method by interviews to collect data through nine questions to a random sample of 30 engineers selected form constructions projects in Jordan. The results related to the study questions on the effect of change orders through technical programs on construction projects in Jordan showed that, most of the study samples confirm that change orders through technical programs decrease the cost of the projects, cause no need for more materials, cause no delay in the completion schedule, enhances the quality of work, and increase the productivity of the work force. The study recommended applying integrated change management system with technical supports form different technologies, developing effective innovative and practical solution to manage change orders and increase training programs to qualify and increase engineering skills in dealing with ICT (information and communication technologies) program. 展开更多
关键词 Change orders construction projects technical programs ICT (information and communication technologies)
下载PDF
Coastal Protection Forest Construction Project
20
《China's Foreign Trade》 1995年第9期18-18,共1页
China’s coastal line starts at the Yalu River in Liaoning in the north and ends at the Beilun River mouth in Guangxi. It is 18,000 kilometres long and crosses 11 provinces, municipalities and autonomous regions, incl... China’s coastal line starts at the Yalu River in Liaoning in the north and ends at the Beilun River mouth in Guangxi. It is 18,000 kilometres long and crosses 11 provinces, municipalities and autonomous regions, including Liaoning, Hebei, Tianjin, Shandong, Jiangsu, Shanghai, Zhejiang, Fujian, Guangdong, Guangxi and Hainan. In 1988, the Chinese government outlined the Coastal Protection Forest System Construction Project and defined the coastal line of 11 provinces as the main construction line. The project aims at developing a 展开更多
关键词 Coastal Protection Forest construction Project LINE
下载PDF
上一页 1 2 5 下一页 到第
使用帮助 返回顶部