Scheduling Rules Based on Gene Expression Programming for Resource-Constrained Project Scheduling Problem 被引量:3
1
作者 贾艳 李晋航 《Journal of Donghua University(English Edition)》 EI CAS 2015年第1期91-96,共6页
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select... In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances. 展开更多
关键词 resource-constrained project scheduling problem(RCPSP) gene expression programming(GEP) scheduling rules(SRs)
下载PDF
A New Algorithm for Resource Constraint Project Scheduling Problem Based on Multi-Agent Systems 被引量:1
2
作者 何曙光 齐二石 李钢 《Transactions of Tianjin University》 EI CAS 2003年第4期348-352,共5页
The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocatio... The resource constrained project scheduling problem (RCPSP) and a decision-making model based on multi-agent systems (MAS) and general equilibrium marketing are proposed. An algorithm leading to the resource allocation decision involved in RCPSP has also been developed. And this algorithm can be used in the multi-project scheduling field as well.Finally, an illustration is given. 展开更多
关键词 resource constrained project scheduling problem multi-agent systems general equilibrium market ALGORITHM
下载PDF
KEY S&T PROBLEMS RELATED TO THE THREE GORGES PROJECT
3
作者 Zhang Guangdou(Tsinghua University)Pan Jiazheng(Ministry of Electrical Power Industry) 《Bulletin of the Chinese Academy of Sciences》 1996年第2期127-135,共9页
This article gives a highly capsulized introduction to the research on key S&T problems involving geology, silting-up, hydropower facilities, navigation locks and shiplift, construction technology, and eco-environ... This article gives a highly capsulized introduction to the research on key S&T problems involving geology, silting-up, hydropower facilities, navigation locks and shiplift, construction technology, and eco-environ-mental con-sequences in the Three Gorges Project on the Yangtze River. 展开更多
关键词 KEY S&T problemS RELATED TO THE THREE GORGES PROJECT PROJECT
下载PDF
Heuristic algorithm for RCPSP with the objective of minimizing activities' cost 被引量:5
4
作者 Liu Zhenyuan Wang Hongwei 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2006年第1期96-102,共7页
Resource-constrained project scheduling problem(RCPSP) is an important problem in research on project management. But there has been little attention paid to the objective of minimizing activities' cost with the re... Resource-constrained project scheduling problem(RCPSP) is an important problem in research on project management. But there has been little attention paid to the objective of minimizing activities' cost with the resource constraints that is a critical sub-problem in partner selection of construction supply chain management because the capacities of the renewable resources supplied by the partners will effect on the project scheduling. Its mathematic model is presented firstly, and analysis on the characteristic of the problem shows that the objective function is non-regular and the problem is NP-complete following which the basic idea for solution is clarified. Based on a definition of preposing activity cost matrix, a heuristic algorithm is brought forward. Analyses on the complexity of the heuristics and the result of numerical studies show that the heuristic algorithm is feasible and relatively effective. 展开更多
关键词 systems engineering resource-constrained project scheduling problem activities' cost preposing activity cost matrix heuristic algorithm.
下载PDF
Inverse full state hybrid projective synchronization for chaotic maps with different dimensions 被引量:3
5
作者 Adel Ouannas Giuseppe Grassi 《Chinese Physics B》 SCIE EI CAS CSCD 2016年第9期251-256,共6页
A new synchronization scheme for chaotic(hyperchaotic) maps with different dimensions is presented.Specifically,given a drive system map with dimension n and a response system with dimension m,the proposed approach ... A new synchronization scheme for chaotic(hyperchaotic) maps with different dimensions is presented.Specifically,given a drive system map with dimension n and a response system with dimension m,the proposed approach enables each drive system state to be synchronized with a linear response combination of the response system states.The method,based on the Lyapunov stability theory and the pole placement technique,presents some useful features:(i) it enables synchronization to be achieved for both cases of n 〈 m and n 〉 m;(ii) it is rigorous,being based on theorems;(iii) it can be readily applied to any chaotic(hyperchaotic) maps defined to date.Finally,the capability of the approach is illustrated by synchronization examples between the two-dimensional H′enon map(as the drive system) and the three-dimensional hyperchaotic Wang map(as the response system),and the three-dimensional H′enon-like map(as the drive system) and the two-dimensional Lorenz discrete-time system(as the response system). 展开更多
关键词 chaotic map full state hybrid projective synchronization inverse problem maps with different dimensions
下载PDF
A MODIFIED PROJECTION AND CONTRACTION METHOD FOR A CLASS OF LINEAR COMPLEMENTARITY PROBLEMS 被引量:12
6
作者 B.S. He(Department of Mathematics, Nanjing University, Nanjing, China) 《Journal of Computational Mathematics》 SCIE CSCD 1996年第1期54-63,共10页
Recently, we have proposed an iterative projection and contraction (PC) method for a class of linear complementarity problems (LCP)([4]). The method was showed to be globally convergent, but no statement could be made... Recently, we have proposed an iterative projection and contraction (PC) method for a class of linear complementarity problems (LCP)([4]). The method was showed to be globally convergent, but no statement could be made about the rate of convergence. In this paper, we develop a modified globally linearly convergent PC method for linear complementarity problems. Both the method and the convergence proofs are very simple. The method can also be used to solve some linear variational inequalities. Several computational experiments are presented to indicate that the method is surprising good for solving some known difficult problems. 展开更多
关键词 TH PN A MODIFIED projection AND CONTRACTION METHOD FOR A CLASS OF LINEAR COMPLEMENTARITY problemS II
原文传递
Multi-Mode Resource Constrained Project Scheduling Models for Progress and Equal Time Interval Payments
7
作者 Yan Shangyao Wang Sin-Siang +1 位作者 Chen Miawjane Liu Jzu-Chun 《Journal of Modern Accounting and Auditing》 2014年第12期1187-1200,共14页
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre... This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good. 展开更多
关键词 project scheduling problem multi-mode resource constrained project scheduling problem with discountedcash flows (MRCPSPDCF) progress payment (PP) payment at an equal time interval (ETI) time-precedence network
下载PDF
Fuzzy Resource-Constrained Project Scheduling Problem for Software Development
8
作者 WANG Xianggang HUANG Wei 《Wuhan University Journal of Natural Sciences》 CAS 2010年第1期25-30,共6页
This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained ... This paper presents a new method to solve the resource-constrained project scheduling problem for software development. In this method,activity duration times are described as fuzzy variables and resource-constrained software project scheduling problems are described as fuzzy programming models. First,how to model the software project scheduling problem under the fuzzy environment conditions is proposed. Second,in order to satisfy the different requirements of decision-making,two novel fuzzy project scheduling models,expected cost model and credibility maximization model,are suggested. Third,a hybrid intelligent algorithm integrated by genetic algorithm and fuzzy simulation is designed to solve the above two fuzzy programming models. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm. 展开更多
关键词 project scheduling problem fuzzy simulation genetic algorithm hybrid intelligent algorithm
原文传递
Solving Resource-constrained Multiple Project Scheduling Problem Using Timed Colored Petri Nets
9
作者 吴瑜 庄新村 +2 位作者 宋国辉 许晓栋 李从心 《Journal of Shanghai Jiaotong university(Science)》 EI 2009年第6期713-719,共7页
To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between... To solve the resource-constrained multiple project scheduling problem(RCMPSP) more effectively,a method based on timed colored Petri net(TCPN) was proposed.In this methodology,firstly a novel mapping mechanism between traditional network diagram such as CPM(critical path method)/PERT(program evaluation and review technique) and TCPN was presented.Then a primary TCPN(PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism.Meanwhile,the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP.Finally,the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example. 展开更多
关键词 timed colored Petri nets resource-constrained multiple project scheduling problem (RCMPSP) mapping mechanism
原文传递
SOLVING THE PROBLEMS OF SUBJECT SPECIALIST KNOWLEDGE FACED IN THE ATTSR PROJECT 被引量:3
10
作者 Huang Ping Chongqing University 《Chinese Journal of Applied Linguistics》 1999年第1期55-62,共8页
ESP teachers teaching English for mixed subject -specialist groups meet problems such as selecting teach-ing materials,dealing with the subject matter,and teaching methods.The experience in the ATTSR(Advanced Teacher ... ESP teachers teaching English for mixed subject -specialist groups meet problems such as selecting teach-ing materials,dealing with the subject matter,and teaching methods.The experience in the ATTSR(Advanced Teacher Training in Specialist Reading)project may be a reference point for colleagues whomeet with the same problems.In this paper the author will suggest methods to solve these problems intraining this group:using different subject 展开更多
关键词 ESP SOLVING THE problemS OF SUBJECT SPECIALIST KNOWLEDGE FACED IN THE ATTSR PROJECT
原文传递
Experience and Problems of the Project of Sichuan Community Forestry
11
《Forestry and Society Newsletter》 2000年第2期5-6,共2页
关键词 PROJECT Experience and problems of the Project of Sichuan Community Forestry
原文传递
Cycling Attacks against Homomorphic Cryptosystems
12
作者 WANG Lin XU Maozhi HU Zhi YUE Zhihong 《Wuhan University Journal of Natural Sciences》 CAS 2008年第6期727-732,共6页
We study security of some homomorphic cryptosysterns with similar algebraic structure. It is found out that those cryptosystems have special common properties. Based on these properties, we pose two cycling attacks an... We study security of some homomorphic cryptosysterns with similar algebraic structure. It is found out that those cryptosystems have special common properties. Based on these properties, we pose two cycling attacks and point out some parameters under which the attacks are efficient. It is verified that randomly selected parameters almost impossibly submit to such attacks. Anyhow, two effective methods are given to construct weak parameters for certain homomorphic cryptosystems, and two moduli over 1 024 bits computed by them are shown to be vulnerable to our cycling attacks. It is concluded that strong primes should be used to avert weak parameters. 展开更多
关键词 homomorphic cryptosystem projection problem cycling attack weak parameter
原文传递
AN EXTENDED MODEL FOR PROJECT PORTFOLIO SELECTION WITH PROJECT DIVISIBILITY AND INTERDEPENDENCY 被引量:5
13
作者 Xingmei Li Shu-Cherng Fang +2 位作者 Xiaoling Guo Zhibin Deng Jianxun Qi 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2016年第1期119-138,共20页
In this paper, we develop an extended model for the project portfolio selection problem over a planning horizon with multiple time periods. The model incorporates the factors of project divisibility and interdependenc... In this paper, we develop an extended model for the project portfolio selection problem over a planning horizon with multiple time periods. The model incorporates the factors of project divisibility and interdependency at the same time for real-life applications. The project divisibility is considered as a strategy, not an unfortunate event as in the literature, in choosing the best execution schedule for the projects, and the classical concept of"project interdependencies" among fully executed projects is then extended to the portions of executed projects. Additional constraints of reinvestment consideration, setup cost, cardinality restriction, precedence relationship and scheduling are also included in the model. For efficient computations, an equivalent mixed integer linear programming representation of the proposed model is derived. Numerical examples under four scenarios are presented to highlight the characteristics of the proposed model. In particular, the positive effects of project divisibility are shown for the first time. 展开更多
关键词 Project management project portfolio selection problem project divisibility project interdependency
原文传递
Project Scheduling Using Hybrid Genetic Algorithm with Fuzzy Logic Controller in SCM Environment 被引量:1
14
作者 Mitsuo Gen KwanWoo Kim Genji Yamazaki 《Tsinghua Science and Technology》 SCIE EI CAS 2003年第1期19-29,共11页
In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We de... In supply chain management (SCM) environment, we consider a resource-constrained project scheduling problem (rcPSP) model as one of advanced scheduling problems considered by a constraint programming technique. We develop a hybrid genetic algorithm (hGA) with a fuzzy logic controller (FLC) to solve the rcPSP which is the well known NP-hard problem. This new approach is based on the design of genetic operators with FLC through initializing the serial method which is superior for a large rcPSP scale. For solving these rcPSP problems, we first demonstrate that our hGA with FLC (flc-hGA) yields better results than several heuristic procedures presented in the literature. We have revealed a fact that flc-hGA has the evolutionary behaviors of average fitness better than hGA without FLC. 展开更多
关键词 resource-constrained project scheduling problem (rcPSP) priority rule method (PRM) hybrid genetic algorithm (hGA) fuzzy logic controller (FLC)
原文传递
Hybrid genetic algorithm for bi-objective resourceconstrained project scheduling 被引量:1
15
作者 Fikri KUCUKSAYACIGIL Gündüz ULUSOY 《Frontiers of Engineering Management》 2020年第3期426-446,共21页
In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performa... In this study,we considered a bi-objective,multi-project,multi-mode resource-constrained project scheduling problem.We adopted three objective pairs as combinations of the net present value(NPV)as a financial performance measure with one of the time-based performance measures,namely,makespan(Cmax),mean completion time(MCT),and mean flow time(MFT)(i.e.,minCmax/maxA^PF,minA/Cr/max7VPF,and min MFTI mdixNPV).We developed a hybrid non-dominated sorting genetic algorithm Ⅱ(hybrid-NSGA-Ⅱ)as a solution method by introducing a backward-forward pass(BFP)procedure and an injection procedure into NSGA-Ⅱ.The BFP was proposed for new population generation and post-processing.Then,an injection procedure was introduced to increase diversity.The BFP and injection procedures led to improved objective functional values.The injection procedure generated a significantly high number of non-dominated solutions,thereby resulting in great diversity.An extensive computational study was performed.Results showed that hybrid-NSGA-Ⅱ surpassed NSGA-Ⅱ in terms of the performance metrics hypervolume,maximum spread,and the number of nondominated solutions.Solutions were obtained for the objective pairs using hybrid-NSGA-Ⅱ and three different test problem sets with specific properties.Further analysis was performed by employing cash balance,which was another financial performance measure of practical importance.Several managerial insights and extensions for further research were presented. 展开更多
关键词 backward-forward scheduling hybrid biobjective genetic algorithm injection procedure maximum cash balance multi-objective multi-project multi-mode resource-constrained project scheduling problem
原文传递
Economic optimization of resource-constrained project scheduling:a two-phase metaheuristic approach
16
作者 Angela H.L.CHEN Chiuh-Cheng CHYU 《Journal of Zhejiang University-Science C(Computers and Electronics)》 SCIE EI 2010年第6期481-494,共14页
This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to... This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to schedule the activities to maximize the expected net present value(NPV) of the project, taking into account the activity costs, the activity durations, and the cash flows generated by successfully completing an activity.Owing to the combinatorial nature of this problem, the current study develops a hybrid of branch-and-bound procedure and memetic algorithm to enhance both mode assignment and activity scheduling.Modifications for the makespan minimization problem have been made through a set of benchmark problem instances.Algorithmic performance is rated on the maximization of the project NPV and computational results show that the two-phase hybrid metaheuristic performs competitively for all instances of different problem sizes. 展开更多
关键词 Memetic algorithm(MA) Branch and bound(B&B) algorithm Net present value(NPV) Project scheduling problem
原文传递