期刊文献+
共找到5,073篇文章
< 1 2 250 >
每页显示 20 50 100
The influencing mechanism of pro-environmental behaviors in the private domain on those in the public domain
1
作者 Jianguo Wang Yanyan Kong 《Chinese Journal of Population,Resources and Environment》 2023年第4期212-218,共7页
From the perspective of regulatory focus theory,the influencing mechanism of pro-environmental behaviors(PEBs)in the private domain on behaviors in the public domain were analyzed by revealing the mediating ef‐fect o... From the perspective of regulatory focus theory,the influencing mechanism of pro-environmental behaviors(PEBs)in the private domain on behaviors in the public domain were analyzed by revealing the mediating ef‐fect of the status quo maintenance and the moderating effect of the prevention focus orientation.The study re‐sults show that PEBs in the private domain significantly promote individuals’PEBs in the public domain.The status quo maintenance partially mediates the relationship between PEBs in the private and public domains.Specifically,individuals with a high-level prevention focus orientation strengthen the relationship between the PEBs in the private domain and the status quo maintenance,and that of the PEBs in the public domain.There‐fore,individuals with a high-level prevention focus will more likely engage in subsequent PEBs in the public domain after their initial PEBs in the private domain due to their increased status quo maintenance degree.Policymakers and practitioners should pay attention to the prevention-repetition effect and use the PEBs in the private domain to promote those in the public domain. 展开更多
关键词 Regulatory focus theory Pro-environmental behaviors PEBs in the private domain PEBs in the public domain Status quo maintenance
下载PDF
构建PPP(Public Private Partnership)模式血液净化培训中心的实践与探索 被引量:2
2
作者 王九生 胡方圆 +3 位作者 曹鹏 张晓萍 魏丽 梅长林 《第二军医大学学报》 CAS CSCD 北大核心 2018年第1期19-23,共5页
上海健康医学院血液净化培训中心是我国首家采用PPP(Public Private Partnership)模式构建的血液净化培训中心。本文系统分析了该血液净化培训中心的成立背景、各方面基本设计和教学管理实践,并结合血液净化培训中心的现有问题,对其股... 上海健康医学院血液净化培训中心是我国首家采用PPP(Public Private Partnership)模式构建的血液净化培训中心。本文系统分析了该血液净化培训中心的成立背景、各方面基本设计和教学管理实践,并结合血液净化培训中心的现有问题,对其股权结构、运行模式和公信力等方面的改进提出针对性意见。 展开更多
关键词 公共私营合作制 血液净化 培训中心 实践 探索
下载PDF
Comparative study of China and USA public private partnerships in public transportation
3
作者 Zhijie Dong Meicheng Wang Xianfeng Yang 《Journal of Modern Transportation》 2016年第3期215-223,共9页
As an effective alternative approach to provide goods and services for public infrastructure, the Public Private Partnership (PPP) has been studied extensively over the past few decades. On a global scale, China and... As an effective alternative approach to provide goods and services for public infrastructure, the Public Private Partnership (PPP) has been studied extensively over the past few decades. On a global scale, China and the United States have developed cooperation on PPP projects in various areas. To perform a comparative study, this paper analyzes how PPP projects work in both countries for public transportation. The basic features, types, and phases of PPPs in public transportation are introduced first, fol- lowed by a thorough discussion on their advantages and challenges. This paper adopts a case study method to analyze the achievements and problems of PPP projects in both countries and then proposes important findings and suggestions for future research. 展开更多
关键词 public private partnership publictransportation China USA
下载PDF
Emerging Challenges in the Completion of Construction Projects through Public Private Partnerships: Empirical Literature Review
4
作者 Pamela Akinyi Oyieyo 《Journal of Building Construction and Planning Research》 2020年第4期263-272,共10页
The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private secto... The process of engaging private sector in the provision of public infrastructure can improve economic value in service delivery and enable the government to utilize the capabilities and expertise held by private sector. This has a positive impact on the public in terms of improving their well-being. This literature review attempts to compare the challenges encountered in implementation of PPP projects across the world, with a view to determining cross cutting challenges and recommendations for developing countries. A literature review was conducted for empirical studies focusing on construction projects. The studies are reviewed by analyzing the methodology used and conclusions made to identify the geographical study area, Public Private Partnership project financing model, emerging challenges and recommendation for future project management. The literature search was based on four keywords: construction projects, completion of construction projects, public private partnership, challenges in construction projects. Thus, a total of 11 empirical studies were identified for review in Europe, Asia and Africa. The review revealed that most risk factors affecting project completion can be categorized as human and organizational factors and unknown geotechnical conditions that were not known beforehand. Specifically, project owners’ interference was also attributable to delays with the delays having significant implications for project execution. Risks have great impact on the performance of construction projects because they affect their quality, time and cost. The general remedy to such potential risk factors is adoption of reliable prediction mechanisms which would estimate those factors using a probabilistic model that does not rely on expert judgments as they tend to be unreliable. 展开更多
关键词 Construction Projects Completion of Construction Projects public private partnership Challenges in Construction Projects
下载PDF
Legal Regulation of Public-Private Partnership in the Republic of Macedonia
5
作者 Risto Rechkoski 《Management Studies》 2019年第2期162-167,共6页
This paper deals with a very important issue,which concerns the possibility of establishing a public-private partnership(PPP),through which link is made between the public and the private sector,for the benefit of bot... This paper deals with a very important issue,which concerns the possibility of establishing a public-private partnership(PPP),through which link is made between the public and the private sector,for the benefit of both sectors,which is a very important opportunity for the realization of different infrastructure projects,and of course tourism facilities can be created in this form.Particular attention is given to the legal regulation of this issue in the Republic of Macedonia.It is mainly expressed through the provisions of the Law on PPP,which makes a clear distinction between the public and the private partner.Public partner is a legal entity that gives an agreement for the establishment of a public private partnership.Private Partner is a domestic or foreign legal entity or natural person or consortium with whom the public partner concludes an agreement for a PPP. 展开更多
关键词 PPP LEGAL REGULATION public PARTNER private PARTNER AGREEMENT
下载PDF
The Public Private Partnership (PPP) as a Solution During the Period of Transformation of the Medical Services Market in Poland
6
作者 Hanna Kociemska 《Journal of Modern Accounting and Auditing》 2012年第12期1906-1911,共6页
The public private partnership (PPP) has functioned worldwide for more than 40 years now, and in different countries, it is developing at different speeds with varying degrees of success. The purpose of this article... The public private partnership (PPP) has functioned worldwide for more than 40 years now, and in different countries, it is developing at different speeds with varying degrees of success. The purpose of this article is to emphasize some standards of the PPP, in particular, within health services area which would guarantee a successful transformation process within the medical services market in Poland, and thus an appropriate division of financial and market risks among the public sectors, including local government sector and private partners within the health services area. Certainly, proper transformation solutions within that industry would significantly contribute to the stabilization of the local government's finance sector and higher resistance to the global financial crisis. 展开更多
关键词 public private partnership (PPP) medical services INVESTMENTS local authorities
下载PDF
Improving HIV Treatment Adherence through a Public Private Partnership in Zambia
7
作者 Henry Fomundam Andrew Maranga +4 位作者 Joseph Kamanga Abraham Tesfay Tamara Choola Stephen Nyangu Anthony Wutoh 《World Journal of AIDS》 2014年第1期107-117,共11页
Background: Effective ART with low viral loads and absence of STIs significantly reduce chances of sexual transmission of HIV. ART is therefore a key pillar in HIV prevention. Appropriate support is however essential ... Background: Effective ART with low viral loads and absence of STIs significantly reduce chances of sexual transmission of HIV. ART is therefore a key pillar in HIV prevention. Appropriate support is however essential for optimum treatment outcome, patient safety and HIV prevention benefit. The scale-up of ART continues to strain the already overstretched human resources in public facilities, impacts on the quality of care, and contributes to loss to follow-up. Task shifting is therefore a strategy to augment the limited human resources. Methodology: In partnership with the Livingstone General Hospital (LGH) and four private pharmacists, the COH III Project through Howard University is promoting quality HIV care by engaging the pharmacists in adherence counselling and treatment monitoring. The LGH ART pharmacist allocates consenting stable ART clients to pharmacies based on willingness to be referred and patient preference. Patients are given schedule of visits to pharmacies where the pharmacists provide medication/adherence counselling and monitor side effects. Patients with medication/treatment issues are referred back to the LGH ART clinic for follow-up. Results: Between October 2012 and August 2013, 280 patients were enrolled and followed up by the four pharmacists. 69% of patients visited the pharmacy at least once, 25% at least twice and 13% at least thrice. The 33 client referrals by pharmacists to LGH were related to adverse drug reactions, suspected treatment failure, pregnancy, and treatment monitoring. The intervention has reduced workload for the ART pharmacist;improved communication of treatment challenges and identification of patients with medication related problems, and reduced travel distances and waiting times. This has resulted in improved adherence and better patient outcomes. Conclusion: Private pharmacists present an opportunity to improve quality of HIV interventions in poor human resource capacity settings. The necessary legal and regulatory framework needs to however be developed to guide the process. 展开更多
关键词 public-private partnership ADHERENCE Support private PHARMACISTS Treatment Monitoring Human RESOURCES CHALLENGE
下载PDF
Public-Private Partnership Arrangement in <i>In-Situ</i>Housing for Slum Rehabilitation in Yenagoa, Bayelsa State, Nigeria
8
作者 A. F. Ebakpa A. E. Gobo +1 位作者 S. A. Ngah T. K. S. Abam 《Journal of Environmental Protection》 2017年第12期1530-1540,共11页
The provision of decent accommodation is a major challenge to government in the developing nations. It is a common phenomenon in the urban centres of the developing nations where most houses are in deplorable conditio... The provision of decent accommodation is a major challenge to government in the developing nations. It is a common phenomenon in the urban centres of the developing nations where most houses are in deplorable conditions. The houses are overcrowded with little or no air space between them. There is no basic sanitation in the urban centres as they lack flush toilet, some of the few available flush toilets are piped into seasonal streams, most houses lack defined kitchen areas and healthy sewage disposal method. The cities lack good access roads and functional drainage system with a common practice of environmentally-unfriendly solid waste management methods that create various health challenges to urban dwellers. The aim of the study is to show how in-situ Housing method of slum rehabilitation can be applied through Public/Private Partnership to upgrade houses within a major slum area in Yenagoa. This shall be done with an agreement between the property owners, Real Estate investors and the state government. Basic Research Methodology was applied using questionnaire, direct observation and personal interview techniques to collect data. Both qualitative and quantitative techniques were applied to analyse data through the use of tables and charts. The findings in the study showed that poor housing condition seriously degrade the environmental quality of the study area. The standard of living in the area is very poor as the people lack access to decent accommodation, basic sanitation and social amenities. 展开更多
关键词 public-private partnership Arrangement IN-SITU HOUSING SLUM REHABILITATION Yenagoa Bayelsa STATE NIGERIA
下载PDF
A Public-Private Partnership Procurement Approach to Sustainable Transport—Zimbabwe Case
9
作者 Vinnet Ndlovu Peter Newman 《Journal of Transportation Technologies》 2022年第4期600-618,共19页
Zimbabwe has serious financial constraints so the only viable option to procure infrastructure is through engaging the private sector in public-private partnerships to enhance the chances of successfully undertaking p... Zimbabwe has serious financial constraints so the only viable option to procure infrastructure is through engaging the private sector in public-private partnerships to enhance the chances of successfully undertaking public projects like sustainable transport. This study creates the basis for a potential public-private partnership with a trackless tram/solar energy project in Bulawayo which has multiple advantages for sustainable development goals. It identifies six other projects in Zimbabwe that can provide some guidance for developing an appropriate PPP that could assist procure such infrastructure. The projects are drawn from the three critical sectors of the economy: power generation, highways/transport, and water/sanitation. Empirical investigations of these projects reveal the effectiveness of the PPP concept to deliver infrastructure for emerging economies. This suggests an ideal PPP arrangement that increases the likelihood of getting projects like the proposed sustainable transport project in Bulawayo implemented quickly and efficiently, especially if formulated to incorporate the project’s local socio-economic dynamics. 展开更多
关键词 public-private partnership public Infrastructure Trackless Trams Sustainable Development Goals
下载PDF
Public private partnership in free trade zoneproject of Mongolia
10
作者 卓拉 《经济视野》 2014年第21期404-404,共1页
下载PDF
The Nigeria Government Engagement with the Private Health Sector
11
作者 Nathan Ukuoghene Ikimi Adaeze Nneka Anosike 《Open Journal of Stomatology》 2024年第5期235-248,共14页
In Nigeria, the healthcare sector is divided into primary health which is under the local government’s authority that oversees the Primary Health centers, secondary health which is under the supervision of the State ... In Nigeria, the healthcare sector is divided into primary health which is under the local government’s authority that oversees the Primary Health centers, secondary health which is under the supervision of the State Ministry of Health in charge of the State General Hospitals that cater to primary and secondary healthcare. Tertiary health is supervised by the Federal Ministry of Health that oversees the Federal Medical Centres, the Teaching Hospitals, and Specialist Training Centres. Not to be excluded from Nigeria’s healthcare system are the private clinics and the public-private partnership. The funding for healthcare systems is mainly budgetary allocations from the government. This systemic review was done using secondary literature, policy documents, peer-reviewed literature, and national newspapers, collected using search engines such as Google Scholar, PubMed, and Medline. The review was done over 2-month period from February-April 2024. The literature was arranged in order of relevance and the literature not used was kept aside. The World Health Organization (WHO) has recommended that 11% of a country’s budget be allocated to health. African countries that make up the African Union (AU) recommended that 15% of each member African country’s yearly budget should be committed to providing healthcare services to her citizens. Unfortunately, Nigeria has yet to attain either the WHO target or the AU target while committing an average, of 6% of her budgetary allocation to health. On the other hand, her neighbouring West African country Ghana, has met the average of 15% recommended by AU. The improved National Health Insurance Authority and the government’s partnership with the private health sector in Public-Private Partnership (PPP) is hoped and would improve access to affordable healthcare in general and oral healthcare in particular. 展开更多
关键词 Health-Funding Oral Healthcare public-private partnership
下载PDF
What Business Models Best Suit the Private Sector in Achieving the SDGs
12
作者 Cody Cheung 《Economics World》 2024年第2期83-91,共9页
Since the United Nations Sustainable development goals and the 2030 agenda were initiated in 2015,it has provided governments with a comprehensive blueprint to take action and meet the challenges of the world’s most ... Since the United Nations Sustainable development goals and the 2030 agenda were initiated in 2015,it has provided governments with a comprehensive blueprint to take action and meet the challenges of the world’s most pressing issues today.But the private sector also plays a large role in contributing to the problems highlighted in the SDGs and companies ranging from many different industries have increasingly become more involved in developing new and innovative solutions to solve the issues highlighted in the SDGs.Social and environmental accountability has been one of the areas that the private sector has been focusing its attention on.Companies in the corporate sector across all industries have adopted Environmental,Social,and Governance(ESG)regulations and targets,that aim to ensure ethical responsibility within private companies and promote transparency about their role in promoting social and environmental well-being across the world.This has allowed many companies to align their values and business models to emphasize the importance of the SDGs.Furthermore,innovative technologies are being utilized to ensure that public reports about the company’s practices are fully accountable and transparent to the public community and the overall private sector.For example,some private companies are using Natural Language Processing and Artificial Intelligence to analyze sustainable practices highlighted in the company’s ESG reports and see if they are genuine and free of greenwashing.This shows that technologies are playing a key role in promoting corporate accountability in terms of sustainability and encouraging private companies to adhere to the guidelines highlighted within the SDGs.Furthermore,private companies have adapted their business models to better promote innovations and collaboration with governments,other private companies as well as NGOs.Since the SDGs were designed to be interconnected and not siloed into their own different challenges,many companies who adopt the SDGs as a major sustainability framework will often develop partnerships and connections with other private sector groups so that they could develop new innovative solutions to meet the challenges posed by current global issues.This is especially prevalent in the clean energy sector,which aims to solve SDG 7 and SDG 13 both important in eradicating the issue of climate change.For example,the solar energy private sector has been currently collaborating with a wide range of universities and research institutions in order to develop solar panels that are more energy efficient and affordable for everyday consumers,while still allowing the private companies to generate significant returns in revenue.When private sector Industries adopt the measures highlighted in the SDGs,not only does it allow them to work with other industries to contribute to combating the world’s most pressing issues,but also maintains and improves their sources of revenue and profit.Overall,in order to meet the world’s most pressing challenges and issues,the private sector has increasingly adopted the SDGs in their business models,so that they would be able to better collaborate with others to develop innovative solutions and to bridge commitment to sustainable development throughout different industries. 展开更多
关键词 sustainable development goals public private partnerships corporate social responsibility
下载PDF
改良的Public-To-Private方法在跨企业工作流建模中的应用
13
作者 杨科学 欧阳松 《计算机工程与科学》 CSCD 2006年第6期122-125,139,共5页
现有的应用在跨企业工作流中的Public-To-Private(P2P)方法存在两大缺陷,一是仅能使用投影继承;二是工作流实例只能从超类过程定义向子类过程定义转换。为了解决这两个缺陷,论文以Petrinet作为建模工具,在P2P方法中引入了协议继承关系,... 现有的应用在跨企业工作流中的Public-To-Private(P2P)方法存在两大缺陷,一是仅能使用投影继承;二是工作流实例只能从超类过程定义向子类过程定义转换。为了解决这两个缺陷,论文以Petrinet作为建模工具,在P2P方法中引入了协议继承关系,规定了它的适用范围,使企业在扩展跨企业工作流时可以应用全部的四种基本路由分支。论文还提出了继承的转换规则的逆操作,使工作流实例能够在子类过程定义和超类之间双向转换。最后根据一个建模实例,说明新方法的应用。 展开更多
关键词 public-To-private方法 跨企业工作流 投影继承 协议继承 工作流实例
下载PDF
Motivations and performance of public to private transactions: An international study 被引量:1
14
作者 Aurelie Sannajust 《Journal of Modern Accounting and Auditing》 2010年第9期1-19,共19页
This article deals with the motivations and the different sources of value from public to private transactions in Europe, USA and Asia from 2000 to 2007. We determine eight main motivations (tax savings, incentive re... This article deals with the motivations and the different sources of value from public to private transactions in Europe, USA and Asia from 2000 to 2007. We determine eight main motivations (tax savings, incentive realignment, control, free cash flow, growth of prospects, transaction costs, takeover defence and undervaluation). Then, we evaluate the shareholder wealth by measuring the offered premiums and the CAAR (cumulative average abnormal return). Finally, we analyse the impact of public to private to the wealth shareholder. The main sources for firms from going private are incentive realignment, free cash flow (mostly for Asia), the economy of cost transaction and undervaluation. Furthermore, taxation benefit is a source of wealth effects for Asia and family blockholder (for the control hypothesis) is significant for Europe. Premiums and CAAR are the most important for the USA and Asia. The main observation that we have made is that Asia gets the same behavior as the USA. 展开更多
关键词 public to private transactions CAAR PREMIUM WEALTH
下载PDF
Changes of Wage Structures in Chinese Public and Private Sectors: 1995-2007 被引量:1
15
作者 Xinxin Ma 《Management Studies》 2016年第6期243-255,共13页
Using CHIP (Chinese Household Income Project Survey) data and the sample selection bias corrected wage function model, this paper estimated changes in wage structure in China by ownership types (SOEs, COEs, FEs, an... Using CHIP (Chinese Household Income Project Survey) data and the sample selection bias corrected wage function model, this paper estimated changes in wage structure in China by ownership types (SOEs, COEs, FEs, and PEs) in 1995 and 2007. The major conclusions are as follows. First, effects of education on wage levels in SOEs and FEs become greater, while education effects decrease in SOEs and PEs under economic transition periods; firm-specific human capital becomes more important in the wage determination mechanism along with market-oriented reforms in SOEs, PEs, and FEs; age effect decreases in SOEs and COEs, but it becomes greater in PEs and FEs. Second, there exist wage structure differences between sectors by wage distributions. For example, in 2007, in SOEs, education return rates are higher for the low-wage and middle-wage groups, and the effect is the highest at the 40th percentile. However in COEs and FEs, education return rates are higher for the high-wage groups, and the effect is the highest at the 70th percentile in COEs and at the 70th percentile in FEs. Tenure effects are greater in the middle-wage groups (40th-80th) in SOEs, COEs, and FEs, and age effects are greater in the low-wage groups (5th-30th) in SOEs, FEs, and PEs. 展开更多
关键词 public and private sectors wage structure human capital Chinese economic transition
下载PDF
Does Cash Incentive Effect TB Case Notification by Public Private Mix-General Practitioners Model in Pakistan?
16
作者 Robina Ashraf Farah Naureen +7 位作者 Arif Noor Jafer Ilyas Razia Fatima Aashifa Yaqoob Ahmad Wali Mahboob Ul Haq Abdullah Latif Sumaira Hussain 《Journal of Tuberculosis Research》 2018年第2期166-174,共9页
Setting: Private healthcare providers including solo practitioners and laboratories enrolled with Public Private Mix General Practitioners model in Pakistan who were enrolled with the program and maintained participat... Setting: Private healthcare providers including solo practitioners and laboratories enrolled with Public Private Mix General Practitioners model in Pakistan who were enrolled with the program and maintained participation during 2014 to 2016. Objective: To assess the change in case notification by private healthcare providers as well as effect on sputum smear positivity rate at private laboratories after introduction of incentives. Design: A comparative cross-sectional study based on routinely maintained National TB Control Program data collected before and after the introduction of incentives (2014 and 2016). Results: In 2016, TB case notification increased by 71% after cash incentives was introduced. Among the 618 private healthcare providers who enrolled and maintained participation in the Public Private Mix program, only 1% of the GPs contributed to 19% increase in case notification, whereas 27% GPs had reported a reduced number of cases compared to the pre-intervention period. After incentives, slide positivity rate for diagnostic declined by 1.9% and follow-up increased by 0.6%. Number of slides for diagnostic and follow-up testing increased by 82% and 72% respectively. Conclusion: Engaging the private healthcare sector, by providing cash incentives to private health care Provider’s is an effective strategy for providing a substantial increase in National TB case notification. 展开更多
关键词 public private MIX CASH Incentive Tuberculosis General PRACTITIONER Pakistan
下载PDF
Day of Surgery Cancellation in Urology at a Public Tertiary Hospital and a Private Specialist Hospital
17
作者 Mathew Yamoah Kyei James Edward Mensah +2 位作者 Lemuel Davies Bray Foli Ashiagbor Joseph Awuku-Asabre Bernard Toboh 《Open Journal of Urology》 2017年第1期22-29,共8页
Background: There is a high variability in the reasons for cancellation of elective urological surgery cases. Case cancellation rate is expected to be high in the Public Health System with perceived inefficiencies com... Background: There is a high variability in the reasons for cancellation of elective urological surgery cases. Case cancellation rate is expected to be high in the Public Health System with perceived inefficiencies compared to private facilities in the same developing economy. Aims and Objectives: This comparative analysis was to determine the case cancellation rate and the reasons for cancellation of elective urological surgeries in a public tertiary hospital and a private specialist hospital in Accra. This is intended to form a basis for interventions aimed at reducing the case cancellation rate. Methods: This was a retrospective analysis of prospectively collected data on Day of Surgery cancelled elective urological cases from September 2014 to October 2015 at the urology unit of the Korle-Bu Teaching Hospital (KBTH), a public Tertiary Hospital and the Trust Specialist Hospital (TSH), a privately managed hospital in Accra. The reasons for case cancellation were categorized into structural factors, patient factors and process factors. Results: There was no significant difference between the case cancellation rate for elective urological cases at KBTH and the TSH which were 20.8% and 17.1% respectively (p = 0.317). For KBTH, the reasons for cancellation of elective urological cases were due to structural factors in 11/117 (9.4%), patient factors in 15/117 (12.8%) and process factors in 91/117 (77.8%) which was due mainly to surgery running late. At the TSH, the reasons were due to structural factors in 1/29 (3.4%), patient factors in 27/29 (93.1%) mainly due to patient not turning up and process factors in 1/29 (3.4%). Conclusion: The case cancellation rate of elective urological surgeries in both the Public Tertiary Hospital and the Private Specialist Hospital were high with no significant difference between the two. However, in the Public Tertiary Hospital, process factors predominated as the cause of these cancellations while patient factors were the predominant cause in the privately managed facility. Exposure of theater managers in public facilities to management practices in privately run facilities should be encouraged to help improve the efficiency of the public facilities. 展开更多
关键词 Elective Urological Surgery Case CANCELLATION public TERTIARY HOSPITAL private SPECIALIST HOSPITAL
下载PDF
Investigation of Factors Affecting Preparedness of Reporting Adverse Drug Reactions among Nurses in Public and Private Hospitals in Dar Es Salaam, Tanzania
18
作者 Veronica Mugoyela Romantiezer Robert Nelson Masota 《Pharmacology & Pharmacy》 2018年第1期38-51,共14页
The current study assessed preparedness among nurses about reporting adverse drug reactions in public and private hospitals. Nurses in hospitals are among health providers very close to patients and are involved in th... The current study assessed preparedness among nurses about reporting adverse drug reactions in public and private hospitals. Nurses in hospitals are among health providers very close to patients and are involved in the process of administering medications especially to inpatients. A cross sectional study was conducted among nurses in public and private hospitals in Dar es Salaam city in Tanzania to compare their preparedness on reporting adverse drug reactions (ADRs). A total of 384 nurses were involved in this study, of which 50% were drawn from public hospitals and 50% from private hospitals. Majority of respondents (75.25%) in public and 84.73% in private hospitals said they have not received any training about reporting ADRs. Of the few trained nurses, 85.43% and 96.55%, in public and private hospitals, respectively, said they have been trained in a seminar only once, after they started working as nurses. Respondents in public (19.17%) and private (32.8%) hospitals reported to stock ADRS forms (Yellow cards). Less than 50% of respondents agreed to have access to reference materials such as a text books named “Good Dispensing Practice” and a “List of Registered Medicines”. Further results showed more than two third of all respondents in private (74.25%) and public (73.5%) hospitals reported that lack of training affects the process of reporting ADRs in terms of ability and tendency. In this study we found training, availability of Yellow cards and presence of a focal person are among important contributing factors to preparedness of reporting ADRs among nurses in public and private hospitals. 展开更多
关键词 Nurses ADRS public and private Hospitals YELLOW CARDS Training
下载PDF
From public to private solid waste management:Stakeholders’perspectives on private-public solid waste management in Lobatse,Botswana
19
作者 Nametso D.Phonchi-Tshekiso Gagoitseope Mmopelwa Raban Chanda 《Chinese Journal of Population,Resources and Environment》 2020年第1期42-48,共7页
Upon the realization that urban areas can only achieve sustainable solid waste management systems through an interplay of partnerships and stakeholders,developing countries have geared themselves towards the privatiza... Upon the realization that urban areas can only achieve sustainable solid waste management systems through an interplay of partnerships and stakeholders,developing countries have geared themselves towards the privatization of waste management services in efforts to reduce costs and improve efficiency.Lobatse,a town located in the south of Botswana,faces the increasing challenges of poor waste management due to the lack of finances and resources available to the Lobatse Town Council,which hinders efforts towards a sustainable waste management system.This has negative implications for public health and the environment,as a result of solid waste pollution from littering and the illegal dumping of waste.This work examines the current state of solid waste management and its challenges in Lobatse,within the context of the interplay between public and private solid waste management.The study aims to perform a social exploration of the efficiency of waste management services,considering the political economy and households’perceptions towards these services.Key stakeholders were interviewed and a social survey of 222 households was conducted to generate primary data.The findings indicate that the involvement of the private sector yielded positive outcomes,as it increased the solid waste collection frequency and improved the quality of the waste management service.Most of the stakeholders were in favor of privatization,and the households were satisfied and willing to contribute towards the cost recovery of solid waste management.It is,therefore,recommended to promote and establish a private-public-community partnership in the town to improve the quality of the waste management system. 展开更多
关键词 Political economy private vs public service Solid waste management
下载PDF
The Influence of Surrounding Ground Floor Facilities on the Use of Privately Owned Public Spaces in Seoul
20
作者 Bonwoo Koo Yumi Lee 《Journal of Building Construction and Planning Research》 2015年第2期95-106,共12页
Seoul’s privately owned public space (POPS) initiative has achieved quantitative success since its introduction in the early 1990s. However, POPSs have been frequently criticized for failing to correspond with the ur... Seoul’s privately owned public space (POPS) initiative has achieved quantitative success since its introduction in the early 1990s. However, POPSs have been frequently criticized for failing to correspond with the urban context in which they are created and are thus often underused. Association between surrounding urban context and the use of POPS is acknowledged, but specific elements of the urban context associated with the use of POPS and the extent of association are unclear. In this study, the relationship between constituent elements of 48 POPSs including the surrounding ground floor facility use and the use of those spaces in Seoul’s central business district was measured by multiple regression analysis. The results present empirical evidence of a substantial relationship between assembly, mercantile, and business facilities on ground floors of surrounding buildings and the use of POPS. As the surrounding ground floor facility use showed an overriding relationship with the use of POPS that possibly overshadowed the influence of secondary determinants, the 48 POPSs were divided into two groups: those surrounded by commercial facilities and those surrounded by business facilities. The use of POPSs surrounded by commercial facilities was associated with additional variables including the proximity to transit stations and crosswalks. Models using the sample of POPSs surrounded by business facilities were not statistically significant. Based on these results, this paper emphasizes the importance of creating POPSs in connection with desirable surrounding facilities. This study also suggests that anticipation of the usage patterns of POPSs and establishment of guidelines supporting those patterns may be viable by investigating preexisting urban contexts. 展开更多
关键词 privately OWNED public Space SURROUNDING Facility USAGE Pattern Multiple Regression Analysis
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部