期刊文献+
共找到2,899篇文章
< 1 2 145 >
每页显示 20 50 100
Dynamic estimation and reliability control of quality assurance for bored piles
1
作者 赵文艺 徐志军 +1 位作者 郑俊杰 边晓亚 《Journal of Central South University》 SCIE EI CAS 2014年第3期1148-1157,共10页
A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the per... A systematic method was proposed to estimate the occurrence probability of defective piles(OPDP) from a site according to quality assurance inspection. The OPDP was firstly suggested as the criterion to weight the performance of a pile foundation. Its prior distribution and updating distribution were deduced to follow Beta distributions. To calibrate the OPDP, a dynamic estimation model was established according to the relationships between prior mean and variance and updating mean and variance. Finally, a reliability-control method dealing with uncertainties arising from quality assurance inspection was formalized to judge whether all the bored piles from a site can be accepted. It is exemplified that the OPDP can be substantially improved when more definite prior information and sampling formation become available. For the example studied herein, the Bayesian estimator of updating variance for OPDP is reduced from 0.0037 to 0.0014 for the first inspection, from 0.0014 to 0.0009 for the second inspection, and with less uncertainty by incorporating experience information. 展开更多
关键词 bored piles quality assurance inspection reliability control occurrence probability Bayesian method
下载PDF
Reliability of design approaches for axially loaded offshore piles and its consequences with respect to the North Sea
2
作者 Kirill A.Schmoor Martin Achmus +1 位作者 Aligi Foglia Maik Wefer 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第6期1112-1121,共10页
In the near future, several offshore wind farms are planned to be built in the North Sea. Therefore, jacket and tripod constructions with mainly axially loaded piles are suitable as support structures. The current des... In the near future, several offshore wind farms are planned to be built in the North Sea. Therefore, jacket and tripod constructions with mainly axially loaded piles are suitable as support structures. The current design of axial bearing resistance of these piles leads to deviant results regarding the pile resistance when different design methods are adopted. Hence, a strong deviation regarding the required pile length must be addressed. The reliability of a design method can be evaluated based on a model error which describes the quality of the considered design method by comparing measured and predicted pile bearing resistances. However, only few pile load tests are reported with regard to the boundary conditions in the North Sea. This paper presents 6 large-scale axial pile load tests which were incorporated within a new model error approach for the current design methods used for the axial bearing resistance,namely API Main Text method and cone penetration test(CPT)-based design methods, such as simplified ICP-05, offshore UWA-05, Fugro-05 and NGI-05 methods. Based on these new model errors, a reliabilitybased study towards the safety was conducted by performing a Monte-Carlo simulation. In addition,consequences regarding the deterministic pile design in terms of quality factors were evaluated. It is shown that the current global safety factor(GSF) prescribed and the partial safety factors are only valid for the API Main Text and the offshore UWA-05 design methods; whereas for the simplified ICP-05,Fugro-05 and NGI-05 design methods, an increase in the required embedded pile length and thus in the GSF up to 2.69, 2.95 and 3.27, respectively, should be considered to satisfy the desired safety level according to DIN EN 1990 of b ? 3.8. Further, quality factors for each design method on the basis of all reliability-based design results were derived. Hence, evaluation of each design method regarding the reliability of the pile capacity prediction is possible. 展开更多
关键词 pile load test Model error System reliability Global safety factors(GSFs) quality factors
下载PDF
Safety impact of piled municipal solid waste dumps in the Three Gorges Reservoir Region on water quality
3
作者 HUANG Chuan WANG Li'ao YUAN Hui 《Journal of Chongqing University》 CAS 2009年第4期272-278,共7页
The safety of water quality in the Three Gorges Reservoir(TGR)is very important.Protections and remediation of environment safety are very crucial for guaranteeing TGR environmental quality.When piled municipal solid ... The safety of water quality in the Three Gorges Reservoir(TGR)is very important.Protections and remediation of environment safety are very crucial for guaranteeing TGR environmental quality.When piled municipal solid waste(MSW) dumps are submerged without treatment,pollutants in the MSW will leach into the water and threaten the water safety of the reservoir.Based on the surveys of the amount,distribution and characteristics of piled MSW in the TGR area,this study focusing on the MSW dumps at the water leve... 展开更多
关键词 Three Gorges Reservoir piled municipal solid waste water quality safety LEACHING
下载PDF
Quality Control Measures of Bored Pile in Bridge Construction
4
作者 Lin Nan Guangjun Li +3 位作者 Yan Liu Xu Meng Yingying Ye Zhongyang Sun 《Journal of World Architecture》 2023年第2期47-52,共6页
In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding... In order to improve the quality of bored piles in bridge construction and ensure the overall quality of the bridge,we analyzed a series of problems in the construction process of bored piles,then propose corresponding quality control measures,in hopes of improving quality control of bored piles in bridge construction in our country. 展开更多
关键词 Bridge construction Bored pile quality control
下载PDF
Application of CFG Pile Construction Technology for Soft Foundation Treatment
5
作者 Deng Lin 《International Journal of Technology Management》 2013年第1期7-10,共4页
CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the... CFG pile has been widely applied as one of the common ground treatment techniques. As a concealed work, the construction quality of pile foundation not only relates to the success of the project, but also concerns the benefits of thousands of hot, seholds. Only strengthening the supervision and management during the construction and strictly designing and specifying CFG pile can ensure the construction quality of CFG pile. But most researches focus on operating mechanism and theoretical analysis, and there are fewer researches about the construction of CFG pile. The real construction of CFG pile has no specified operation and lacks of the construction guidance, which not only causes great problems and has great influence on the intensity of CFG pile, but also makes the real pile body have great difference from the design requirements. Therefore, the study on construction of CFG pile in the paper has great significance. 展开更多
关键词 CFG pile soft foundation treatment reinforcement mechanism construction technology quality control
下载PDF
钻孔灌注桩在基坑维护施工中的质量控制措施
6
作者 谢君琦 高超 《工程建设与设计》 2024年第9期191-193,共3页
结合实际案例,按照钻孔灌注桩施工工艺流程顺序,从钻孔前、钻孔中、成孔、钢筋笼吊装及混凝土浇筑等环节,对钻孔灌注桩在深基坑维护施工中的质量控制措施进行简要分析,如钻孔前应建立合理的质量控制流程等;钻孔过程中要做好护筒埋设、... 结合实际案例,按照钻孔灌注桩施工工艺流程顺序,从钻孔前、钻孔中、成孔、钢筋笼吊装及混凝土浇筑等环节,对钻孔灌注桩在深基坑维护施工中的质量控制措施进行简要分析,如钻孔前应建立合理的质量控制流程等;钻孔过程中要做好护筒埋设、设备就位与安装、成孔等环节的质量控制;钢筋笼吊装要做好钢筋笼起吊点计算等工作;混凝土浇筑应避免堵孔、断桩等质量缺陷。 展开更多
关键词 钻孔 灌注桩 质量 控制
下载PDF
黄淮冲积平原地区高速铁路螺杆桩复合地基应用研究 被引量:1
7
作者 李盼 《路基工程》 2024年第1期80-86,共7页
依托郑徐客运专线兰考南站路基工程螺杆桩复合地基项目,通过试桩和桩身质量检测,总结黄淮冲积平原地区螺杆桩关键施工工艺和质量控制措施,同时对螺杆桩承载力特性及复合地基进行工后沉降分析。结果表明:黄淮冲积平原地区粉质黏土、粉砂... 依托郑徐客运专线兰考南站路基工程螺杆桩复合地基项目,通过试桩和桩身质量检测,总结黄淮冲积平原地区螺杆桩关键施工工艺和质量控制措施,同时对螺杆桩承载力特性及复合地基进行工后沉降分析。结果表明:黄淮冲积平原地区粉质黏土、粉砂、细砂、圆砾土土层中可以形成螺杆桩螺纹段桩身,成桩质量良好;螺杆桩单桩承载力和复合地基承载力满足设计要求;该地区同等条件下,螺杆桩极限承载力较普通灌注桩提高约24%;复合地基沉降主要发生在填筑期;双曲线法预测得出三个观测断面工后沉降量均小于15mm,满足无砟轨道铺设要求。 展开更多
关键词 冲积平原 螺杆桩 复合地基 承载力试验 沉降监测 质量控制
下载PDF
鄂茶10号低氟青砖茶渥堆工艺优化
8
作者 李玉川 董晨 +5 位作者 唐海燕 余志 张德 郑时兵 倪德江 陈玉琼 《湖北农业科学》 2024年第11期95-99,共5页
选用湖北省推广面积较大的茶树品种鄂茶10号一芽四五叶为原料,对青砖茶关键工序-渥堆进行三因素(茶坯含水量、渥堆温度和湿度)三水平的正交优化试验。结果表明,茶坯含水量和渥堆湿度对青砖茶品质形成影响较大;最佳渥堆参数如下:茶坯含水... 选用湖北省推广面积较大的茶树品种鄂茶10号一芽四五叶为原料,对青砖茶关键工序-渥堆进行三因素(茶坯含水量、渥堆温度和湿度)三水平的正交优化试验。结果表明,茶坯含水量和渥堆湿度对青砖茶品质形成影响较大;最佳渥堆参数如下:茶坯含水量40%,发酵环境湿度70%,发酵环境温度45℃。 展开更多
关键词 低氟青砖茶 鄂茶10号 渥堆 品质 工艺优化
下载PDF
不同方法渥堆发酵的普洱熟茶品质比较分析 被引量:1
9
作者 罗慧 王庆华 +5 位作者 施宗运 刘春艳 杨澜 吴华强 关晓阳 周玲 《茶叶通讯》 2024年第1期60-67,共8页
为探究不同方式渥堆发酵的普洱熟茶品质差异,分别采用数控与传统两种发酵方法将茶叶加工成普洱熟茶样,分别对感官品质及主要理化成分进行相关性分析、主成分分析和聚类分析,探讨两种发酵方法普洱熟茶的品质差异。结果表明,数控设备发酵... 为探究不同方式渥堆发酵的普洱熟茶品质差异,分别采用数控与传统两种发酵方法将茶叶加工成普洱熟茶样,分别对感官品质及主要理化成分进行相关性分析、主成分分析和聚类分析,探讨两种发酵方法普洱熟茶的品质差异。结果表明,数控设备发酵的普洱熟茶样感官品质整体低于传统方式发酵的普洱熟茶样,同时两种方法发酵的普洱熟茶各品质指标存在一定差异,品质指标间存在一定的相关性。数控设备发酵的普洱熟茶样和传统方式发酵的普洱熟茶样主要理化成分含量总体差异不大,除水分、咖啡碱和酚氨比差异显著(p<0.05),其他均不显著,但存在差异;主成分分析结果表明,传统方法渥堆发酵的普洱熟茶样综合品质优于数控发酵的普洱熟茶。试验结果可为普洱熟茶发酵技术的研究及普洱熟茶的加工生产提供理论依据。 展开更多
关键词 普洱茶 普洱熟茶 渥堆 发酵方式 数控发酵 传统发酵 茶叶品质
下载PDF
西藏自治区超高海拔牧区光伏支架桩基础的施工质量控制研究 被引量:2
10
作者 金爱云 孟令坤 +1 位作者 白玛南木加 宋兴贵 《太阳能》 2024年第2期17-28,共12页
西藏自治区超高海拔牧区的气候环境、地质条件、环保要求等与内地的不同,因此在此类地区建设光伏电站时,光伏支架桩基础施工时需要考虑的因素,以及设备、材料等的选择也存在很大差异。以西藏山南曲松罗布沙850 MW牧光互补光伏发电项目... 西藏自治区超高海拔牧区的气候环境、地质条件、环保要求等与内地的不同,因此在此类地区建设光伏电站时,光伏支架桩基础施工时需要考虑的因素,以及设备、材料等的选择也存在很大差异。以西藏山南曲松罗布沙850 MW牧光互补光伏发电项目中光伏支架桩基础的施工为例,对西藏自治区超高海拔牧区光伏支架桩基础的施工质量控制开展研究。首先结合项目所在地的地质条件和环保要求,选择出最合适的桩基础类型;其次对光伏场区内3种施工设备的施工效率、经济性、稳定性、环保性进行了比较;最后通过严格落实施工工艺及采用钢丝绳定位的方式确保了桩基础的施工质量。研究结果表明:此类地区的光伏支架桩基础采用“以螺旋钢桩基础为主、微孔灌注桩基础为辅”的方案,能同时满足环境保护、施工效率和力学性能的要求;为确保施工进度,施工设备可选择240型普通挖改钻机;介绍的螺旋钢桩基础和微孔灌注桩基础的施工工艺及施工质量控制措施效率高、效果明显,能确保桩基础施工后的力学性能满足设计要求。研究结果为其他同类型光伏发电项目桩基础的施工提供了可借鉴的经验。 展开更多
关键词 光伏发电项目 光伏支架 桩基础 超高海拔牧区 施工质量 螺旋钢桩 微孔灌注桩
下载PDF
橡胶夹芯钢管灌注隔震桩施工技术研究 被引量:1
11
作者 熊宁 胡斌斌 +3 位作者 施传浩 李鹏军 王瀚 蒋序君 《建筑施工》 2024年第4期590-593,共4页
在建筑行业中,一些高精密设备厂房、车间等对建筑物减隔震要求比较高,为避免周边环境道路等对建筑物的震动影响,通常情况下会在建筑物基础设置减震支座或者在建筑物周边设置隔震沟等减隔震措施。但也存在建筑物周边场地受限等情况,无法... 在建筑行业中,一些高精密设备厂房、车间等对建筑物减隔震要求比较高,为避免周边环境道路等对建筑物的震动影响,通常情况下会在建筑物基础设置减震支座或者在建筑物周边设置隔震沟等减隔震措施。但也存在建筑物周边场地受限等情况,无法进行隔震沟等设置,因此考虑在建筑物桩基上包裹减隔震材料,进而切断或者减少周边环境道路等振动通过基础桩基对建筑物产生的影响。主要研究通过减隔震桩的设计减少周边环境对建筑物的影响,特殊环境下减隔震桩的施工,减隔震桩施工的质量保证以及减隔震桩施工过程中的安全问题等,总结的经验可供类似项目借鉴。 展开更多
关键词 设计与生产 隔震桩施工 隔震桩质量保证措施 护筒防护
下载PDF
建筑桩基预制管桩施工技术特点及质量控制要点分析 被引量:2
12
作者 沈福安 《工程技术研究》 2024年第2期184-186,共3页
预制管桩凭借其高性价比、高承载力、高成桩质量、高施工效率等优越特性,被广泛应用于各类建筑工程桩基施工中。文章基于某小学工程项目,以建筑桩基预制管桩施工技术为切入点,在简述建筑桩基预制管桩施工技术的基础上,分别从建筑桩基、... 预制管桩凭借其高性价比、高承载力、高成桩质量、高施工效率等优越特性,被广泛应用于各类建筑工程桩基施工中。文章基于某小学工程项目,以建筑桩基预制管桩施工技术为切入点,在简述建筑桩基预制管桩施工技术的基础上,分别从建筑桩基、施工流程与施工技术3个方面明确了该小学工程建筑桩基预制管桩项目质量控制要点,旨在引导相关施工单位加强对建筑桩基预制管桩施工的重视,为提升相关施工单位预制管桩施工技术水准提供借鉴。 展开更多
关键词 建筑桩基 预制管桩 静压沉桩 锤击沉桩 质量检测
下载PDF
新能源经济发展视角下公共充电桩用户特征调查分析 被引量:2
13
作者 于嘉慧 白玉兰 +2 位作者 郭哲涵 邢莹莹 章志荣 《能源与节能》 2024年第2期8-13,共6页
“十四五”期间,中国新能源汽车产业飞速发展,充电换电作为一种更高效、更集约、更低碳的补能模式,相比化石燃料具有更高的能源转换效率,且公共充电桩的智能管理功能也能带来节能效益。结合国家政策,对新能源汽车车主使用公共充电桩满... “十四五”期间,中国新能源汽车产业飞速发展,充电换电作为一种更高效、更集约、更低碳的补能模式,相比化石燃料具有更高的能源转换效率,且公共充电桩的智能管理功能也能带来节能效益。结合国家政策,对新能源汽车车主使用公共充电桩满意度进行调查,将对充电桩的满意度分为整体、质量、便捷、价格和体验5个维度,建立结构方程分析各维度对公共充电桩整体满意度的影响。结果显示,影响居民对公共充电桩满意度的直接因素是质量、价格、便捷和体验,其中体验对公共充电桩满意度的影响最大。最后提出应从充电桩安全质量、用户需求及车主建议入手,建立政府和运营平台协同的合作机制,为新能源充电桩的发展提供支持。 展开更多
关键词 公共充电桩 用户特征 满意度 安全质量 用户需求
下载PDF
旋挖成孔桩基础施工质量监控的信息化技术 被引量:1
14
作者 谷业皓 《建筑技术开发》 2024年第4期63-65,共3页
通过在旋挖钻机上安装深度和倾角传感器,配合5G网络传输,将传感器收集到的数据自动传输到信息化管理平台的处理软件上,可实现在机载终端、电脑端、手机端上,实时查看当前施工现场各个钻机钻具的中心平面偏差、深度、斜度三项主控质量数... 通过在旋挖钻机上安装深度和倾角传感器,配合5G网络传输,将传感器收集到的数据自动传输到信息化管理平台的处理软件上,可实现在机载终端、电脑端、手机端上,实时查看当前施工现场各个钻机钻具的中心平面偏差、深度、斜度三项主控质量数据,实现旋挖成孔灌注桩质量监管的智能化、信息化。此技术减少人为因素对施工质量的影响,降低因质量问题造成的经济损失,降低监管强度,减少管理人员需求,节约人力成本。 展开更多
关键词 信息化 质量监控 旋挖桩
下载PDF
不良地质中粗砂层钻孔灌注桩施工质量的控制研究 被引量:1
15
作者 梁文杰 《工程建设与设计》 2024年第6期191-193,共3页
结合城市人行天桥工程项目实例,着重分析不良地质中粗砂层钻孔灌注桩施工质量的控制,主要包括双层钢护筒设计、特殊桩位钢护筒加长、钢护筒埋深、钢护筒拔出等质量控制措施。根据现场实际地质情况,编制合理的施工方案,结合EPC项目特点,... 结合城市人行天桥工程项目实例,着重分析不良地质中粗砂层钻孔灌注桩施工质量的控制,主要包括双层钢护筒设计、特殊桩位钢护筒加长、钢护筒埋深、钢护筒拔出等质量控制措施。根据现场实际地质情况,编制合理的施工方案,结合EPC项目特点,确保施工费用有效控制,施工质量管控到位以及合同按期履约。 展开更多
关键词 不良地质 钻孔灌注桩 施工 质量控制
下载PDF
无损检测在管桩焊缝质量控制中的应用 被引量:1
16
作者 蒋发岭 《石油化工技术与经济》 CAS 2024年第2期45-47,62,共4页
介绍了几种常用的无损检测方法的检测原理,结合某项目管桩对接焊缝的无损检测结果,探讨了无损检测方法在管桩焊缝质量控制中的应用情况,并对后续管桩对接焊缝无损检测提出建议。
关键词 管桩焊缝 无损检测 质量控制
下载PDF
生活垃圾填埋场反渗透膜浓缩液回灌垃圾堆体对渗沥液水质影响
17
作者 齐海浪 原效凯 +1 位作者 李璐菡 徐永彬 《净水技术》 CAS 2024年第10期144-153,195,共11页
文章以东莞市3座已临时封场的生活垃圾填埋场为研究对象,跟踪、收集和分析了时间跨度为1年的渗沥液原水水质中COD_(Cr)、BOD_(5)、氨氮、TN、TP、电导率、SS主要污染物浓度随反渗透膜浓缩液回灌垃圾堆体的浓缩液量变化的数据。研究发现... 文章以东莞市3座已临时封场的生活垃圾填埋场为研究对象,跟踪、收集和分析了时间跨度为1年的渗沥液原水水质中COD_(Cr)、BOD_(5)、氨氮、TN、TP、电导率、SS主要污染物浓度随反渗透膜浓缩液回灌垃圾堆体的浓缩液量变化的数据。研究发现,当浓缩液回灌量大于临界量后,渗沥液污染物中的SS、BOD5、电导率浓度与浓缩液回灌量的平方均呈现较为明显正相关性,而浓缩液回灌临界量与填埋场存量垃圾量和渗沥液产生量也呈正相关。浓缩液回灌会造成垃圾堆体渗沥液的各污染物浓度的升高,其中对电导率影响最大,其次是有机污染物,然后是TN、氨氮,最后是SS和TP,其中对TP影响最小。浓缩液回灌会导致渗沥液水质中电导率和总溶解性固体急剧增加并超过处理设施的进水水质浓度限制,将严重影响采用以蝶管式反渗透(DTRO)为主体的渗沥液处理设备的正常运行。因此,文章建议不应采用浓缩液回灌垃圾堆体的方式对浓缩液实施处理。 展开更多
关键词 生活垃圾填埋场 反渗透膜浓缩液 回灌垃圾堆体 垃圾渗沥液水质 电导率 渗沥液处理
下载PDF
高速公路路基工程PHC预应力管桩施工技术 被引量:1
18
作者 侯德宝 《工程建设与设计》 2024年第4期187-189,共3页
依托实际工程,详细阐述了PHC预应力管桩的工程特性,重点从施工准备、桩位放样、管桩存放、管桩吊装、接桩、终压等方面研究了PHC预应力管桩的施工技术要点,并强调要及时对施工质量进行检测,以保证软土地基处理效果。
关键词 高速公路 路基工程 PHC预应力管桩 质量检测
下载PDF
大直径桩配合锚索结构在山体永久抗滑支护中的施工技术 被引量:1
19
作者 梁川 王梦莹 《建筑技术》 2024年第8期955-959,共5页
山体建筑中永久抗滑边坡支护桩和预应力锚索的施工质量与边坡支护结构的支护性能具有密不可分的关系,同时边坡支护工程存在比较强的隐蔽性及地质的不确定性,此时需要在施工中制订科学的施工技术方案,为边坡支护的施工质量提供有力的技... 山体建筑中永久抗滑边坡支护桩和预应力锚索的施工质量与边坡支护结构的支护性能具有密不可分的关系,同时边坡支护工程存在比较强的隐蔽性及地质的不确定性,此时需要在施工中制订科学的施工技术方案,为边坡支护的施工质量提供有力的技术保障。基于大直径旋挖桩及预应力锚索施工中大型偏芯钢筋笼的制作、大直径桩旋挖成孔、钢筋笼下放、水下混凝土灌注、预应力锚索制作施工、土方开挖等方面的具体内容及施工难点技术措施,对山体永久抗滑支护结构施工技术进行了研究与分析,旨在为行业相关的技术人员提供施工参考。 展开更多
关键词 永久抗滑边坡支护 大直径桩 施工质量 施工难点
下载PDF
公路软土路基加固补强施工技术 被引量:1
20
作者 张宏杰 《科学技术创新》 2024年第9期151-154,共4页
公路工程施工中,往往会穿越软土段,如穿越鱼塘、农田等区域。软土路基加固补强技术有很多,如注浆、换填、水泥搅拌桩等,各自的适用范围和条件均不相同。文中以某公路项目为背景,简单介绍水泥搅拌桩的原理、施工工艺、质量检测等内容。
关键词 水泥搅拌桩 软土路基 单轴抗压强度 质量检测
下载PDF
上一页 1 2 145 下一页 到第
使用帮助 返回顶部