Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT proje...Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT projects such as concessionaire selection criteria and risk factors. But the project execution becomes complicated such as the escalated quality supervision organization and procedure at the construction stage. This extra supervision may have constituted hidden redundancies as waste to economic sustainability. This paper investigated construction quality supervision of BOT projects to pinpoint adequate degree of supervision and detect redundant organization and procedures. The study adopted ten subway construction projects as cases in which five were from the traditional design-bid-build (DBB) and five from the BOT methods. Thirty six project participants including owners, contractors, designers, and concessionaire managers of the ten projects were interviewed to tell their views on these issues. The quality supervision measures of the DBB projects were used as the baseline and compared with those of the BOT projects. The research results show that the construction quality seems no difference for the DBB and BOT projects. Construction quality comes out of supervision but excessive supervision organization and procedures do not necessarily improve quality. This finding indicates that adequate degree of supervision is enough to achieve required quality to save immense paperwork for large construction projects.展开更多
With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themsel...With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering,then its enterprise benefits and future development prospects will be excellent.However,there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management.This is exactly what we must pay attention to.This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.展开更多
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ...In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.展开更多
The accurate assessment of the quality can materially affect the safety and life of the prefabricated construction.In this paper,we studied the overall module of concealed water supply pipeline,and a new complex seque...The accurate assessment of the quality can materially affect the safety and life of the prefabricated construction.In this paper,we studied the overall module of concealed water supply pipeline,and a new complex sequence quality evaluation model was established.By analyzing the small evaluation index elements of the model,the weight of the larger evaluation index could be deduced.The total quality evaluation score of the overall module could be obtained by calculating the weight value of the evaluation index,and then the quality standard of the overall module could be obtained.展开更多
Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platf...Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.展开更多
The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is ...The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.展开更多
Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construc...Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area.展开更多
文摘Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT projects such as concessionaire selection criteria and risk factors. But the project execution becomes complicated such as the escalated quality supervision organization and procedure at the construction stage. This extra supervision may have constituted hidden redundancies as waste to economic sustainability. This paper investigated construction quality supervision of BOT projects to pinpoint adequate degree of supervision and detect redundant organization and procedures. The study adopted ten subway construction projects as cases in which five were from the traditional design-bid-build (DBB) and five from the BOT methods. Thirty six project participants including owners, contractors, designers, and concessionaire managers of the ten projects were interviewed to tell their views on these issues. The quality supervision measures of the DBB projects were used as the baseline and compared with those of the BOT projects. The research results show that the construction quality seems no difference for the DBB and BOT projects. Construction quality comes out of supervision but excessive supervision organization and procedures do not necessarily improve quality. This finding indicates that adequate degree of supervision is enough to achieve required quality to save immense paperwork for large construction projects.
文摘With the continuous advancement of China's urbanization process,the demand for construction projects is increasing,which is both an opportunity and a challenge for construction companies.If the enterprises themselves can grasp the background and policy conditions to maintain a high level of construction engineering,then its enterprise benefits and future development prospects will be excellent.However,there are also many companies whose own reputation and actual benefits have been affected for poor engineering quality caused by poor construction management.This is exactly what we must pay attention to.This article will analyse and explore the relevant work to improve the engineering quality of different phases of engineering construction and to guide the management of the construction unit in the future from the perspective of the construction unit to strengthen the project quality supervision.
基金Key Subject of Ministry of Railway Technology Research and Development Program(No.2011G010-D)Central University Funds for Basic Research(No.SWJTU12ZT12)
文摘In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.
基金National Natural Science Foundation of China(No.71403052)Educational Commission of Fujian Province,China(Nos.JAS170304,JAS170303)+1 种基金Youth Foundation of Fujian University of Technology,China(No.GY-S17101)Education Research Foundation of Fujian University of Technology,China(Nos.GB-K-17-28,GB-J-16-12)
文摘The accurate assessment of the quality can materially affect the safety and life of the prefabricated construction.In this paper,we studied the overall module of concealed water supply pipeline,and a new complex sequence quality evaluation model was established.By analyzing the small evaluation index elements of the model,the weight of the larger evaluation index could be deduced.The total quality evaluation score of the overall module could be obtained by calculating the weight value of the evaluation index,and then the quality standard of the overall module could be obtained.
基金funded by Ministry of Industry and Information Technology of the People’s Republic of China[Grant No.2018473].
文摘Quality traceability plays an essential role in assembling and welding offshore platform blocks.The improvement of the welding quality traceability system is conducive to improving the durability of the offshore platform and the process level of the offshore industry.Currently,qualitymanagement remains in the era of primary information,and there is a lack of effective tracking and recording of welding quality data.When welding defects are encountered,it is difficult to rapidly and accurately determine the root cause of the problem from various complexities and scattered quality data.In this paper,a composite welding quality traceability model for offshore platform block construction process is proposed,it contains the quality early-warning method based on long short-term memory and quality data backtracking query optimization algorithm.By fulfilling the training of the early-warning model and the implementation of the query optimization algorithm,the quality traceability model has the ability to assist enterprises in realizing the rapid identification and positioning of quality problems.Furthermore,the model and the quality traceability algorithm are checked by cases in actual working conditions.Verification analyses suggest that the proposed early-warningmodel for welding quality and the algorithmfor optimizing backtracking requests are effective and can be applied to the actual construction process.
基金National Key Technology R&D Program in the 12th Five Year Plan of China (No. 2011BAB10B06)Independent Innovation Foundation of Tianjin University (No. 1102119)
文摘The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.
文摘Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area.