期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Infinitesimal dividing modeling method for dual suppliers inventory model with random lead times 被引量:2
1
作者 Ji Pengcheng Song Shiji Wu Cheng 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2009年第3期527-536,共10页
As one of the basic inventory cost models, the (Q, τ)inventory cost model of dual suppliers with random procurement lead time is mostly formulated by using the concepts of "effective lead time" and "lead time de... As one of the basic inventory cost models, the (Q, τ)inventory cost model of dual suppliers with random procurement lead time is mostly formulated by using the concepts of "effective lead time" and "lead time demand", which may lead to an imprecise inventory cost. Through the real-time statistic of the inventory quantities, this paper considers the precise (Q, τ) inventory cost model of dual supplier procurement by using an infinitesimal dividing method. The traditional modeling method of the inventory cost for dual supplier procurement includes complex procedures. To reduce the complexity effectively, the presented method investigates the statistics properties in real-time of the inventory quantities with the application of the infinitesimal dividing method. It is proved that the optimal holding and shortage costs of dual supplier procurement are less than those of single supplier procurement respectively. With the assumption that both suppliers have the same distribution of lead times, the convexity of the cost function per unit time is proved. So the optimal solution can be easily obtained by applying the classical convex optimization methods. The numerical examples are given to verify the main conclusions. 展开更多
关键词 INVENTORY precise model random lead times dual supplier infinitesimal dividing method optimiza- tion.
下载PDF
PLANNED LEAD TIME OPTIMIZATION IN MATERIAL REQUIREMENT PLANNING ENVIRONMENT FOR MULTILEVEL PRODUCTION SYSTEMS 被引量:1
2
作者 Faicel HNAIEN Alexandre DOLGUI Mohamed-Aly OULD LOULY 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2008年第2期132-155,共24页
This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging co... This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging costs. The proposed approach is based on discrete time inventory control where the decision variables are integer. Two types of systems are considered: multi-level serial-production and assembly systems. For the serial production systems (one type of component at each level), a mathematical model is suggested. Then, it is proven that this model is equivalent to the well known discrete Newsboy Model. This directly provides the optimal values for the planned lead times. For multilevel assembly systems, a dedicated model is proposed and some properties of the decision variables and objective function are proven. These properties are used to calculate lower and upper limits on the decision variables and lower and upper bounds on the objective function. The obtained limits and bounds open the possibility to develop an efficient optimization algorithm using, for example, a Branch and Bound approach. The paper presents the proposed models in detail with corresponding proofs and se'~eral numerical examples. Some advantages of the suggested models and perspectives of this research are discussed. 展开更多
关键词 Multilevel assembly and production control model planned lead time optimization systems MRP random lead times discrete inventory
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部