Capacity allocation and energy management strategies for energy storage are critical to the safety and economical operation of microgrids.In this paper,an improved energymanagement strategy based on real-time electric...Capacity allocation and energy management strategies for energy storage are critical to the safety and economical operation of microgrids.In this paper,an improved energymanagement strategy based on real-time electricity price combined with state of charge is proposed to optimize the economic operation of wind and solar microgrids,and the optimal allocation of energy storage capacity is carried out by using this strategy.Firstly,the structure and model of microgrid are analyzed,and the outputmodel of wind power,photovoltaic and energy storage is established.Then,considering the interactive power cost between the microgrid and the main grid and the charge-discharge penalty cost of energy storage,an optimization objective function is established,and an improved energy management strategy is proposed on this basis.Finally,a physicalmodel is built inMATLAB/Simulink for simulation verification,and the energy management strategy is compared and analyzed on sunny and rainy days.The initial configuration cost function of energy storage is added to optimize the allocation of energy storage capacity.The simulation results show that the improved energy management strategy can make the battery charge-discharge response to real-time electricity price and state of charge better than the traditional strategy on sunny or rainy days,reduce the interactive power cost between the microgrid system and the power grid.After analyzing the change of energy storage power with cost,we obtain the best energy storage capacity and energy storage power.展开更多
The interleaving/multiplexing technique was used to realize a 200?MHz real time data acquisition system. Two 100?MHz ADC modules worked parallelly and every ADC plays out data in ping pang fashion. The design improv...The interleaving/multiplexing technique was used to realize a 200?MHz real time data acquisition system. Two 100?MHz ADC modules worked parallelly and every ADC plays out data in ping pang fashion. The design improved the system conversion rata to 200?MHz and reduced the speed of data transporting and storing to 50?MHz. The high speed HDPLD and ECL logic parts were used to control system timing and the memory address. The multi layer print board and the shield were used to decrease interference produced by the high speed circuit. The system timing was designed carefully. The interleaving/multiplexing technique could improve the system conversion rata greatly while reducing the speed of external digital interfaces greatly. The design resolved the difficulties in high speed system effectively. The experiment proved the data acquisition system is stable and accurate.展开更多
<div style="text-align:justify;"> In view of the shallow buried depth of the target layer and it is difficult to obtain high-quality seismic data of HCX gas storage project, based on the acquisition pa...<div style="text-align:justify;"> In view of the shallow buried depth of the target layer and it is difficult to obtain high-quality seismic data of HCX gas storage project, based on the acquisition parameters of the adjacent area, the 3D acquisition technical scheme is designed for focusing on the imaging of the top of HCX high-steep anticline. By optimizing the acquisition parameters and the excitation and receiving conditions, the acquisition of high-resolution and high signal-to-noise ratio seismic data is guaranteed to meet the demand of fracture prediction and reservoir prediction. </div>展开更多
Variable curvature friction pendulum bearings(VCFPB)effectively reduce the dynamic response of storage tanks induced by earthquakes.Shaking table testing is used to assess the seismic performance of VCFPB isolated sto...Variable curvature friction pendulum bearings(VCFPB)effectively reduce the dynamic response of storage tanks induced by earthquakes.Shaking table testing is used to assess the seismic performance of VCFPB isolated storage tanks.However,the vertical pressure and friction coefficient of the scaled VCFPB in the shaking table tests cannot match the equivalent values of these parameters in the prototype.To avoid this drawback,a real-time hybrid simulation(RTHS)test was developed.Using RTHS testing,a 1/8 scaled tank isolated by VCFPB was tested.The experimental results showed that the displacement dynamic magnification factor of VCFPB,peak reduction factors of the acceleration,shear force,and overturning moment at bottom of the tank,were negative exponential functions of the ratio of peak ground acceleration(PGA)and friction coefficient.The peak reduction factors of displacement,acceleration,force and overturning moment,which were obtained from the experimental results,are compared with those calculated by the Housner model.It can be concluded that the Housner model is applicable in estimation of the acceleration,shear force,and overturning moment of liquid storage tank,but not for the sliding displacement of VCFPBs.展开更多
A new system called alternate data acquisition and real-time monitoring system has been developed for long-time discharge in tokamak operation. It can support continuous on-line data acquisition at a high sampling rat...A new system called alternate data acquisition and real-time monitoring system has been developed for long-time discharge in tokamak operation. It can support continuous on-line data acquisition at a high sampling rate and a graphic display of the plasma parameters during the discharge. Thus operators can monitor and control the plasma state in real time. An application of this system has been demonstrated on the HT-7 tokamak.展开更多
The device is used for the test on the fuze detonating time according to the initial velocity of the projectile and the altitude and speed of enemy aircraft flight. For the special requirements of the high-speed signa...The device is used for the test on the fuze detonating time according to the initial velocity of the projectile and the altitude and speed of enemy aircraft flight. For the special requirements of the high-speed signal acquisition in the process, the characteristics of the measured signal are analyzed. The system is investigated in chip selection, signal transmission, signal processing, signal storage, post-production PCB design, etc. The appropriate measures and solutions which affect the integrity and accuracy of the signal in each process are proposed. The rules for the layout of the device and wiring are made. The result show that the measurement values are accurate without loss of data.展开更多
Finite element(FE) is a powerful tool and has been applied by investigators to real-time hybrid simulations(RTHSs). This study focuses on the computational efficiency, including the computational time and accuracy...Finite element(FE) is a powerful tool and has been applied by investigators to real-time hybrid simulations(RTHSs). This study focuses on the computational efficiency, including the computational time and accuracy, of numerical integrations in solving FE numerical substructure in RTHSs. First, sparse matrix storage schemes are adopted to decrease the computational time of FE numerical substructure. In this way, the task execution time(TET) decreases such that the scale of the numerical substructure model increases. Subsequently, several commonly used explicit numerical integration algorithms, including the central difference method(CDM), the Newmark explicit method, the Chang method and the Gui-λ method, are comprehensively compared to evaluate their computational time in solving FE numerical substructure. CDM is better than the other explicit integration algorithms when the damping matrix is diagonal, while the Gui-λ(λ = 4) method is advantageous when the damping matrix is non-diagonal. Finally, the effect of time delay on the computational accuracy of RTHSs is investigated by simulating structure-foundation systems. Simulation results show that the influences of time delay on the displacement response become obvious with the mass ratio increasing, and delay compensation methods may reduce the relative error of the displacement peak value to less than 5% even under the large time-step and large time delay.展开更多
This paper designs and develops a framework on a distributed computing platform for massive multi-source spatial data using a column-oriented database(HBase).This platform consists of four layers including ETL(extract...This paper designs and develops a framework on a distributed computing platform for massive multi-source spatial data using a column-oriented database(HBase).This platform consists of four layers including ETL(extraction transformation loading) tier,data processing tier,data storage tier and data display tier,achieving long-term store,real-time analysis and inquiry for massive data.Finally,a real dataset cluster is simulated,which are made up of 39 nodes including 2 master nodes and 37 data nodes,and performing function tests of data importing module and real-time query module,and performance tests of HDFS's I/O,the MapReduce cluster,batch-loading and real-time query of massive data.The test results indicate that this platform achieves high performance in terms of response time and linear scalability.展开更多
Among hybrid energy storage systems(HESSs),battery-ultracapacitor systems in active topology use DC/DC power converters for their operations.HESSs are part of the solutions designed to improve the operation of power s...Among hybrid energy storage systems(HESSs),battery-ultracapacitor systems in active topology use DC/DC power converters for their operations.HESSs are part of the solutions designed to improve the operation of power systems in different applications.In the residential microgrid applications,a multilevel control system is required to manage the available energy and interactions among the microgrid components.For this purpose,a rule-based power management system is designed,whose operation is validated in the simulation,and the performances of different controllers are compared to select the best strategy for the DC/DC converters.The average current control with internal model control and real-time frequency decoupling is proposed as the most suitable controller according to the contemplated performance parameters,allowing voltage regulation values close to 1%.The results are validated using real-time hardware-in-the-loop(HIL).These systems can be easily adjusted for other applications such as electric vehicles.展开更多
Because of the complex nature of the changes in the current and movement of the riverbeds by bridge scouring, it is impossible to understand or predict these changes. In order to have a reliable data, it is critical t...Because of the complex nature of the changes in the current and movement of the riverbeds by bridge scouring, it is impossible to understand or predict these changes. In order to have a reliable data, it is critical to have the current methods and equipment for measuring bridge scouring replaced with technology that could acquire real-time bridge scouring data. Despite the critical need for real-time data acquisition, the harsh environmental conditions have prevented the scientific community from acquiring real-time data. Harsh environmental conditions were addressed by the developmental of an automated, remote data collection system, allowing real-time data such as scour movement, scour depth, and scour trend to be viewed in a safe location. As a result, accurate sea-floor movements were seen for the first time, aiding the direction and future of bridge scour research, ultimately contributing greatly to the safety of bridges.展开更多
基金a phased achievement of Gansu Province’s Major Science and Technology Project(W22KJ2722005)“Research on Optimal Configuration and Operation Strategy of Energy Storage under“New Energy+Energy Storage”Mode”.
文摘Capacity allocation and energy management strategies for energy storage are critical to the safety and economical operation of microgrids.In this paper,an improved energymanagement strategy based on real-time electricity price combined with state of charge is proposed to optimize the economic operation of wind and solar microgrids,and the optimal allocation of energy storage capacity is carried out by using this strategy.Firstly,the structure and model of microgrid are analyzed,and the outputmodel of wind power,photovoltaic and energy storage is established.Then,considering the interactive power cost between the microgrid and the main grid and the charge-discharge penalty cost of energy storage,an optimization objective function is established,and an improved energy management strategy is proposed on this basis.Finally,a physicalmodel is built inMATLAB/Simulink for simulation verification,and the energy management strategy is compared and analyzed on sunny and rainy days.The initial configuration cost function of energy storage is added to optimize the allocation of energy storage capacity.The simulation results show that the improved energy management strategy can make the battery charge-discharge response to real-time electricity price and state of charge better than the traditional strategy on sunny or rainy days,reduce the interactive power cost between the microgrid system and the power grid.After analyzing the change of energy storage power with cost,we obtain the best energy storage capacity and energy storage power.
文摘The interleaving/multiplexing technique was used to realize a 200?MHz real time data acquisition system. Two 100?MHz ADC modules worked parallelly and every ADC plays out data in ping pang fashion. The design improved the system conversion rata to 200?MHz and reduced the speed of data transporting and storing to 50?MHz. The high speed HDPLD and ECL logic parts were used to control system timing and the memory address. The multi layer print board and the shield were used to decrease interference produced by the high speed circuit. The system timing was designed carefully. The interleaving/multiplexing technique could improve the system conversion rata greatly while reducing the speed of external digital interfaces greatly. The design resolved the difficulties in high speed system effectively. The experiment proved the data acquisition system is stable and accurate.
文摘<div style="text-align:justify;"> In view of the shallow buried depth of the target layer and it is difficult to obtain high-quality seismic data of HCX gas storage project, based on the acquisition parameters of the adjacent area, the 3D acquisition technical scheme is designed for focusing on the imaging of the top of HCX high-steep anticline. By optimizing the acquisition parameters and the excitation and receiving conditions, the acquisition of high-resolution and high signal-to-noise ratio seismic data is guaranteed to meet the demand of fracture prediction and reservoir prediction. </div>
基金Scientific Research Fund of Institute of Engineering Mechanics,China Earthquake Administration under Grant No.2018D03the National Natural Science Foundation of China under Grant Nos.51608016 and 51421005。
文摘Variable curvature friction pendulum bearings(VCFPB)effectively reduce the dynamic response of storage tanks induced by earthquakes.Shaking table testing is used to assess the seismic performance of VCFPB isolated storage tanks.However,the vertical pressure and friction coefficient of the scaled VCFPB in the shaking table tests cannot match the equivalent values of these parameters in the prototype.To avoid this drawback,a real-time hybrid simulation(RTHS)test was developed.Using RTHS testing,a 1/8 scaled tank isolated by VCFPB was tested.The experimental results showed that the displacement dynamic magnification factor of VCFPB,peak reduction factors of the acceleration,shear force,and overturning moment at bottom of the tank,were negative exponential functions of the ratio of peak ground acceleration(PGA)and friction coefficient.The peak reduction factors of displacement,acceleration,force and overturning moment,which were obtained from the experimental results,are compared with those calculated by the Housner model.It can be concluded that the Housner model is applicable in estimation of the acceleration,shear force,and overturning moment of liquid storage tank,but not for the sliding displacement of VCFPBs.
基金Meg-science Program of the Chinese Academy of Sciences (No. 19981303)
文摘A new system called alternate data acquisition and real-time monitoring system has been developed for long-time discharge in tokamak operation. It can support continuous on-line data acquisition at a high sampling rate and a graphic display of the plasma parameters during the discharge. Thus operators can monitor and control the plasma state in real time. An application of this system has been demonstrated on the HT-7 tokamak.
文摘The device is used for the test on the fuze detonating time according to the initial velocity of the projectile and the altitude and speed of enemy aircraft flight. For the special requirements of the high-speed signal acquisition in the process, the characteristics of the measured signal are analyzed. The system is investigated in chip selection, signal transmission, signal processing, signal storage, post-production PCB design, etc. The appropriate measures and solutions which affect the integrity and accuracy of the signal in each process are proposed. The rules for the layout of the device and wiring are made. The result show that the measurement values are accurate without loss of data.
基金National Natural Science Foundation of China under Grant Nos.51639006 and 51725901
文摘Finite element(FE) is a powerful tool and has been applied by investigators to real-time hybrid simulations(RTHSs). This study focuses on the computational efficiency, including the computational time and accuracy, of numerical integrations in solving FE numerical substructure in RTHSs. First, sparse matrix storage schemes are adopted to decrease the computational time of FE numerical substructure. In this way, the task execution time(TET) decreases such that the scale of the numerical substructure model increases. Subsequently, several commonly used explicit numerical integration algorithms, including the central difference method(CDM), the Newmark explicit method, the Chang method and the Gui-λ method, are comprehensively compared to evaluate their computational time in solving FE numerical substructure. CDM is better than the other explicit integration algorithms when the damping matrix is diagonal, while the Gui-λ(λ = 4) method is advantageous when the damping matrix is non-diagonal. Finally, the effect of time delay on the computational accuracy of RTHSs is investigated by simulating structure-foundation systems. Simulation results show that the influences of time delay on the displacement response become obvious with the mass ratio increasing, and delay compensation methods may reduce the relative error of the displacement peak value to less than 5% even under the large time-step and large time delay.
基金Supported by the National Science and Technology Support Project(No.2012BAH01F02)from Ministry of Science and Technology of Chinathe Director Fund(No.IS201116002)from Institute of Seismology,CEA
文摘This paper designs and develops a framework on a distributed computing platform for massive multi-source spatial data using a column-oriented database(HBase).This platform consists of four layers including ETL(extraction transformation loading) tier,data processing tier,data storage tier and data display tier,achieving long-term store,real-time analysis and inquiry for massive data.Finally,a real dataset cluster is simulated,which are made up of 39 nodes including 2 master nodes and 37 data nodes,and performing function tests of data importing module and real-time query module,and performance tests of HDFS's I/O,the MapReduce cluster,batch-loading and real-time query of massive data.The test results indicate that this platform achieves high performance in terms of response time and linear scalability.
基金the EMC-UN Lab,the LIFAE-UD Lab and the EnergyVille Institute with support from Universidad Nacional de Colombia。
文摘Among hybrid energy storage systems(HESSs),battery-ultracapacitor systems in active topology use DC/DC power converters for their operations.HESSs are part of the solutions designed to improve the operation of power systems in different applications.In the residential microgrid applications,a multilevel control system is required to manage the available energy and interactions among the microgrid components.For this purpose,a rule-based power management system is designed,whose operation is validated in the simulation,and the performances of different controllers are compared to select the best strategy for the DC/DC converters.The average current control with internal model control and real-time frequency decoupling is proposed as the most suitable controller according to the contemplated performance parameters,allowing voltage regulation values close to 1%.The results are validated using real-time hardware-in-the-loop(HIL).These systems can be easily adjusted for other applications such as electric vehicles.
文摘Because of the complex nature of the changes in the current and movement of the riverbeds by bridge scouring, it is impossible to understand or predict these changes. In order to have a reliable data, it is critical to have the current methods and equipment for measuring bridge scouring replaced with technology that could acquire real-time bridge scouring data. Despite the critical need for real-time data acquisition, the harsh environmental conditions have prevented the scientific community from acquiring real-time data. Harsh environmental conditions were addressed by the developmental of an automated, remote data collection system, allowing real-time data such as scour movement, scour depth, and scour trend to be viewed in a safe location. As a result, accurate sea-floor movements were seen for the first time, aiding the direction and future of bridge scour research, ultimately contributing greatly to the safety of bridges.