期刊文献+
共找到179篇文章
< 1 2 9 >
每页显示 20 50 100
Limiting Nuisance for Traffic during the Refurbishment of the Heinenoord Tunnel in The Netherlands:In Search of Resilience Possibilities
1
作者 Ronald W.Mante 《Journal of Traffic and Transportation Engineering》 2024年第6期276-290,共15页
The Heinenoord Tunnel in The Netherlands connects the Hoeksche Waard Island with the city of Rotterdam.The tunnel is 614 m long,consists of two unidirectional tubes(3 lanes each)and has an average daily traffic load o... The Heinenoord Tunnel in The Netherlands connects the Hoeksche Waard Island with the city of Rotterdam.The tunnel is 614 m long,consists of two unidirectional tubes(3 lanes each)and has an average daily traffic load of 92,100 vehicles.The tunnel was opened for traffic in 1969.The structure is basically still sound,but a full refurbishment of the installations and systems is required,because they are end of life.A long closure of the tunnel(or even one tube)is not possible,because alternative routes are scarce and require significant extra travel time,not suitable for the high traffic load.Thus,various scenarios were considered to assure the accessibility of the Hoeksche Waard during the works,scheduled for 2023-2024.Multi-criteria analyses were performed for each scenario,taking into account the total project cost,societal cost(due to extra travel time)and the total required time span for the works.Refurbishment through“parallel assembly”proved to be optimal.This concept means that the new installations and systems are installed next to the current ones,that will remain in service until the end phase of the refurbishment.The existing installations and systems are only dismantled after integral testing has shown that the completed new ones work properly.This approach allows most of the works to be carried out during a series of night and weekend closures of just one tube.This limits nuisance,because one driving direction is always left undisturbed,while the closure for the other driving direction takes place in low-traffic periods.This paper describes the applied method to select the optimal refurbishment approach,as well as the(partly unconventional)measures that are implemented to enhance the resilience of the tunnel system to assure as much availability for traffic as possible,also during future maintenance works. 展开更多
关键词 Road tunnel safety refurbishMENT RESILIENCE traffic nuisance social interests
下载PDF
A Study on the Impact of Urban River Refurbishment to the Thermal Environment of Surrounding Residential Area 被引量:1
2
作者 Daewuk Kim Jae-Gyu Cha Eung-Ho Jung 《Journal of Environmental Protection》 2014年第5期454-465,共12页
In this study, a simulation was conducted targeting Beomeo stream of Daegu, for the purpose of the quantitative determination of the changes in thermal environment of surrounding residential areas according to the urb... In this study, a simulation was conducted targeting Beomeo stream of Daegu, for the purpose of the quantitative determination of the changes in thermal environment of surrounding residential areas according to the urban river refurbishment. For the study method, the reviews of literature and model verification were conducted, and then the results were derived through the process of comparing and analyzing the thermal environment resulting from the river refurbishment of the target area. As a result of the model verification, the accuracy of modeling was 95%. As a result of a simulation of the target area, in respect of the fluctuation of temperature, the temperature decreased by 1.33°C more in the daytime than in the night time, due to the river refurbishment. In respect of the positions, the decrease of the temperature was 1.33°C at 2 pm at position 1, the position of river refurbishment, and the highest in the entire time slots. Also, the changes in temperature increasingly decreased from position 1 to position 4. It seemed that it was because there was the highest radiant heat at position 1 with the biggest gap between artificial mulching and natural mulching, and the effect of the gap in the radiant heat influenced successively over position 2, 3 and 4. Lastly, in respect of the effect of river refurbishment on the surrounding area, the effect reached to position 3, in other word, 60 meters from the river. 展开更多
关键词 RESIDENTIAL Area URBAN Heat ISLAND URBAN Micro CLIMATE River refurbishMENT Thermal Environment
下载PDF
Refurbishment of Significant Timber Structures in Slovakia
3
作者 Jaroslav Sandanus Kristian Sogel 《Journal of Civil Engineering and Architecture》 2014年第8期1009-1016,共8页
The paper presents an analysis and a subsequent refurbishment of significant buildings in Slovakia. The analysis focuses on the load-bearing timber roof-structures. There are three sacral objects and one long-span spo... The paper presents an analysis and a subsequent refurbishment of significant buildings in Slovakia. The analysis focuses on the load-bearing timber roof-structures. There are three sacral objects and one long-span sporting hall presented. The paper tries to introduce the background of difficult refurbishment process. Before the refurbishment, a thorough process of investigation is required This process includes four basic steps. General information about the load-bearing structure is obtained from the geodetic survey that foregoes the process of diagnostic inspection. The diagnostic survey focuses on the defects of the structure, their degree and possible origin. Modem methods of computer modelling help to understand the structural operation and help to find reserves of carrying capacity. Structural analysis should take into account all detected defects and the joint types, which can influence the transfer of forces. The refurbishment project is usually a brief, but clear summary for fulfilling the needs of Monument Board and building process. All the steps require knowledge from different fields and require professional approach. 展开更多
关键词 Timber DIAGNOSIS refurbishMENT sacral architecture
下载PDF
The Economic Effect of the Housing Refurbishment in Urban Regeneration
4
作者 LAI Pi-ying 《Journal of Modern Accounting and Auditing》 2011年第1期31-37,共7页
With the increasing ratio of self-owned housing, the demand for new building as gradually reduced. In other words, the demand of refurbishment becomes more urgent. The major objective of this paper is to explore and i... With the increasing ratio of self-owned housing, the demand for new building as gradually reduced. In other words, the demand of refurbishment becomes more urgent. The major objective of this paper is to explore and investigate the consumer behavior of housing renovation. We plan to explore the direct effects of housing refurbishment or restoration on the housing prices, and then the indirect effects of an externality spilled over to the neighbor. We will understand the overall effects to provide a preliminary estimate of the changing in the economic value resulting from the change in the housing refurbishment or restoration of buildings. This research also dig into how the effects in the housing refurbishment or restoration in Taipei city & Kaohsiung city. The purpose is to investigate the driving force on the housing restoration. This study will be the empirical study on the economic values by using hedonic price model. The result will be useful on the decision-making on the urban regeneration by the way of housing restoration and suggests that property owners of a housing estate will benefit from participating on refurbishment in Taiwan. 展开更多
关键词 urban regeneration housing refurbishment economic effects housing price
下载PDF
Energy Saving Potential Due to Refurbishment of Federal Public Housing in the UAE
5
作者 Wafa AlAwadhi Athari AlNaqbi +2 位作者 Abeer Manneh Ayoub Kazim Bassam Abu-Hijleh 《Engineering(科研)》 2013年第1期132-136,共5页
This paper, computer energy modeling is used to estimate the potential energy savings of refurbishing existing public federal housing in the United Arab Emirates. Such houses are built by the UAE Ministry of Public Wo... This paper, computer energy modeling is used to estimate the potential energy savings of refurbishing existing public federal housing in the United Arab Emirates. Such houses are built by the UAE Ministry of Public Works (MoPW) in five of the seven emirates that make up the UAE federation. The energy modeling was performed using the Integrated Environmental Solutions-Virtual Environment (IES-VE) commercial software. The study covered representative MoPW houses built in the period of 1974-2012. The results indicate potential energy savings upto 30.8% for the case of model 717 when refurbished to 2 Pearls standards compared to the as built configuration. The results showed little benefit in going from 1 Pearl to 2 Pearls refurbishment level. Thus 1 Pearl seems to be the most practical. This shows the high potential for energy, and thus environmental, savings should refurbishment be carried out on the homes built by the MoPW. 展开更多
关键词 ENERGY MODELING ENERGY SAVINGS refurbishMENT UAE
下载PDF
Refurbishing Faestningens Materialgard: A Heritage Complex
6
作者 Torben Valdbjom Rasmussen 《Journal of Civil Engineering and Architecture》 2014年第7期888-897,共10页
F estningens Materialgard is a listed complex located in downtown Copenhagen. The refurbishment of the listed complex was studied to provide knowledge on how a process for refurbishing heritage buildings can be carri... F estningens Materialgard is a listed complex located in downtown Copenhagen. The refurbishment of the listed complex was studied to provide knowledge on how a process for refurbishing heritage buildings can be carried out successfully, as refurbishment of heritage buildings is often a complicated process. The process shows how to choose, evaluate and implement measures creating synergy between the interests of preserving heritage values and to develop affordable refurbishment that meets the requirements for the future use of the building. The refurbishment followed included restoration, energy upgrading and refurbishment of the individual buildings that make up the listed complex. The process focuses on the cooperation and dialogue between the parties involved. F estningens Materialgard is a case study where the Heritage Agency, the Danish Working Environment Authority and the owner as a team cooperated in identifying feasible refurbishment measures. Through the process the owner was supported by architects and engineers. Focus is put on how, to identify potential energy savings and, to decide on energy upgrading measures when refurbishing and restoring listed buildings. The refurbished Faestningens Materialgard is visualized in photos. 展开更多
关键词 BUILDING HERITAGE refurbishment.
下载PDF
Inter-Organizational Conflict (IOC) in Building Refurbishment Projects;an Exploratory Factor Analysis (EFA) approach
7
作者 Adel Noori Nazanin Nafisi +1 位作者 Mohamadreza Mokariantabari 《Journal of Construction Research》 2020年第1期29-36,共8页
Over the past years,there has been an expanding intrigued in building refurbishment projects because of the alter in financial conditions and the accentuation on sustainable development.Increasing demand for building ... Over the past years,there has been an expanding intrigued in building refurbishment projects because of the alter in financial conditions and the accentuation on sustainable development.Increasing demand for building refurbishment projects will lead to an increase in organizational interactions in the construction works as building refurbishment works involve interactions among many different organizations and it can cause Inter-Organizational conflict(IOC)among organizations involved in projects.This paper adopted an Exploratory Factor Analysis(EFA)approach to analyses IOC in building refurbishment projects.For this study,a fivepoint Likert Scale was adopted to ensure the instruments of the study are reliable.The researcher ultimately sent questionnaires as a web-link and email invitation to 1050 construction firms and 733 architectural firms.The questionnaire sent to managers and professionals from construction and architectural firms in Malaysia.Finally,one-hundred-seventy-nine(179)refurbishment projects formed a database for this paper.The finding of this paper shows the IOC factors that contribute to the improve the performance of building refurbishment project can be conflict during the construction stage,conflict between the client and the consultant,task expectations,basic responsibilities,final duration,project’s goals,conflict between the client and the contractor,final cost,final quality,standards of behaviors,conflict between the contractor and the consultant,interference and conflict during the design stage. 展开更多
关键词 Building refurbishment project Inter-Organizational Conflict(IOC) UNCERTAINTY Exploratory Factor Analysis(EFA) Existing building
下载PDF
Resilience analysis of road tunnels subject to refurbishment work
8
作者 Ciro Caliendo Isidoro Russo Gianluca Genovese 《Digital Transportation and Safety》 2023年第3期190-199,共10页
After some tragic fire events,Directive 2004/54/EC was issued to ensure a minimum safety level for tunnels belonging to the Trans-European Road Network longer than 500 m.Nowadays,most of the Italian road tunnels are s... After some tragic fire events,Directive 2004/54/EC was issued to ensure a minimum safety level for tunnels belonging to the Trans-European Road Network longer than 500 m.Nowadays,most of the Italian road tunnels are still not in compliance with the minimum safety requirements,thus refurbishment works are often planned.By developing a traffic macro-simulation model,this paper aims at assessing the resilience of an existing twin-tube motorway tunnel when one of its tubes is partially or completely closed due to planned activities.Several scenarios were investigated,also considering the availability or not of an alternative itinerary in the surrounding transportation network.The average vehicles’speed was used as a functionality parameter,while the resilience metrics were the resilience loss,the recovery speed,and the resilience index.The findings showed higher resilience losses for complete closure rather than partial closure of the tube under planned refurbishment works.The implementation of digital technologies,such as variable message signs,might reduce the resilience loss of the tunnel system.This research might represent a reference for tunnel management agencies in the choice of the most appropriate traffic control strategy to improve tunnel resilience in the event of planned activities. 展开更多
关键词 Road tunnels RESILIENCE refurbishment works Traffic simulation Digital technologies
下载PDF
Architecture as a Means of Developing Social Exchange:Learning from a Danish Case Study of Refurbishment and Urban Transformation in a Disadvantaged Housing Area
9
作者 Claus Bech-Danielsen Marie Stender 《Journal of Civil Engineering and Architecture》 2023年第6期265-285,共21页
Disadvantaged housing areas from the postwar period typically consist of relatively monotonous and monofunctional multi-storey blocks and have a separate traffic system rendering the areas isolated enclaves in the urb... Disadvantaged housing areas from the postwar period typically consist of relatively monotonous and monofunctional multi-storey blocks and have a separate traffic system rendering the areas isolated enclaves in the urban fabric.It is argued that this spatial isolation contributes to social isolation,and current refurbishments are therefore aimed at linking the housing areas with the surrounding neighbourhoods to enable social exchange between the residents and people from the surrounding areas.Based on a case study in a Danish social housing area,this paper discusses to what extent architectural development and urban strategic transformations can contribute to enabling social exchange in disadvantaged housing areas.Do neighbours enter the disadvantaged housing area as intended?If so,how does this influence their perception of the housing area?The analysis shows that architectural development and urban transformations are interdependent in establishing a social mix in disadvantaged housing areas.It is argued that refurbishments can reduce the stigma surrounding the housing area and its residents.However,the applicability of such strategies is highly dependent on the local context of the housing area. 展开更多
关键词 Disadvantaged housing areas social housing postwar housing areas TRANSFORMATION refurbishMENT urban renewal
下载PDF
Blockchain-based refurbishment certification system for enhancing the circular economy
10
作者 Cristina Regueiro Aitor Gómez-Goiri +3 位作者 Nuno Pedrosa Christos Semertzidis Eider Iturbe Jason Mansell 《Blockchain(Research and Applications)》 EI 2024年第1期85-96,共12页
As the global population continues to grow,the enormous stress on our environment and resources is becoming impossible to ignore.A focus on producing and consuming as cheaply as possible has created an economy in whic... As the global population continues to grow,the enormous stress on our environment and resources is becoming impossible to ignore.A focus on producing and consuming as cheaply as possible has created an economy in which objects are briefly used and then discarded as waste,featuring a linear lifecycle that creates an enormous amount of waste.The alternative to the linear economy“take-make-waste”is called the“circular economy”.Under this paradigm,materials are recycled to build new products or components that are designed and built to promote their reuse and refurbishment.This assures the continuous(re-)exploitation of existing resources,reducing the extraction of new raw materials.However,customers often reject these reused or refurbished products under the suspicion that they do not meet the same usability,safety,or performance levels of new products.In this sense,trustworthy records of historical details of refurbished products could increase consumers’confidence in products and components of the“circular economy”,prioritizing trustworthiness,reliability,and transparency.This work presents a new certification tool based on blockchain technology to guarantee trusted,accurate,transparent,and traceable lifecycle information of products and their components and to generate trustworthy certificates to probe refurbished product historical details.This tool aims to enhance refurbished product visibility by creating the basis for making the circular economy a reality in any domain. 展开更多
关键词 Blockchain TRACEABILITY Lifecycle Product lifecycle management(PLM) refurbishMENT CERTIFICATION Circular economy
原文传递
Performance evaluation of operational energy use in refurbishment, reuse, and conservation of heritage buildings for optimum sustainability 被引量:1
11
作者 O.K. Akande D. Odeleye, A. Coday C.Jimenez Bescos 《Frontiers of Architectural Research》 CSCD 2016年第3期371-382,共12页
The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs),... The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs), the operational energy use aspects are less considered, and a systematic way of analyzing their energy performance following project delivery is often lacking, The aim of this study is to evaluate the operational performance of refurbishment and reuse of UK listed church projects. The objective is to assess the operational energy use with a view to optimizing their sustafnabie performance. The methodology includes eight selected case study buildings refurbished and converted for multipurpose use. The case study approach provided qualitative insights into how the study contributes to a more structured requirements for energy management in HBPs with specific attention to energy-efficient building operations. The findings show the need to focus on fundamental areas of operational management (i.e. by developing and implementing more focused policy on operational energy performance of heritage buildings) to minimize the energy required to operate them. The challenges of implementing changes in operational energy performance improvement of heritage buildings are addressed in the form of recommendations that could Lead to real results. The study concludes that leveraging these areas requires commitment from all heritage building stakeholders because they all have substantial roles in harmonizing the requirement for the project's sustainability and not just the building operators. Meanwhile, baseline project planning, periodic updating, monitoring, and managing the energy use pattern are suggested as measures that could greatly facilitate better energy performance to optimizing their sustainable reuse compared with the traditional approach of trying to improve their thermal performance. 展开更多
关键词 Heritage buildings Listed churches Operational energy Performance refurbishMENT Sustainabitity
原文传递
Metamodeling and multicriteria analysis for sustainable and passive residential building refurbishment: A case study of French housing stock 被引量:1
12
作者 Zaid Romani Abdeslam Draoui Francis Allard 《Building Simulation》 SCIE EI CSCD 2022年第3期453-472,共20页
For the energy-related issues that the world is facing nowadays,the renovation of the building stock is one of the major challenges.The objective of this study is to present an approach that helps to develop a multi-c... For the energy-related issues that the world is facing nowadays,the renovation of the building stock is one of the major challenges.The objective of this study is to present an approach that helps to develop a multi-criteria decision support tool dedicated to the rehabilitation of sustainable and passive energy housing by integrating heating energy needs,economic,social and environmental criteria throughout the life cycle stages of the building.The methodology consists of developing metamodels to predict heating energy needs from polynomial regression,design of experiments method and thermo-aeraulic simulations of building behavior.This metamodel is used to carry out a combinatorial study of real technical solutions.The methodology was applied to a real-life existing building located in La Rochelle city(France)based on an in-situ energy diagnosis.Three multicriteria analysis methods were studied and compared:weighted sum,Min-Max and Pareto concept.Furthermore,technical constraints as well as owner preferences and performance constraints have been studied.Optimal technical solutions have been obtained in order to meet the various criteria studied.In addition,window shading and natural ventilation have been proposed to reduce the thermal discomfort rate in summer.This study was extended to all French regions.Finally,this method can be transformed into a decision support tool which will be useful for architects,engineers and stockholders. 展开更多
关键词 METAMODELING building refurbishment multi-criteria decision support sustainable building passive building
原文传递
Comparative study on microstructure evolution and failure mechanisms of ordinary and refurbished EB-PVD TBC under cyclic oxidation 被引量:1
13
作者 Pan Li Xiaochao Jin +3 位作者 Pin Lu Delin Liu Rende Mou Xueling Fan 《Journal of Advanced Ceramics》 SCIE EI CAS CSCD 2023年第9期1805-1820,共16页
Refurbishment of thermal barrier coating(TBC)has become a valuable technique to prolong the service life of high-temperature components.This study investigates the effect of the refurbishment process(coating removal a... Refurbishment of thermal barrier coating(TBC)has become a valuable technique to prolong the service life of high-temperature components.This study investigates the effect of the refurbishment process(coating removal and recoating)on the microstructure evolution and physical properties of TBC,including oxidation characteristics,element diffusion behavior,and crack failure mechanisms.The results showed that a certain amount of interdiffusion zone(IDZ)with Cr-rich would be retained in DD6 superalloy substrate after coating removal.The microstructure of the refurbished specimens showed equiaxedβ-NiAl phases,while the ordinary specimens have elongated grain shapes with a high aspect ratio.Moreover,mixed oxides in the refurbished TBC specimens were earlier observed during cyclic oxidation,with a greater thickness compared to ordinary TBC,due to the influence of BC layer phase sizes.The growth mechanism of thermally grown oxide(TGO-Al_(2)O_(3)layer)in the refurbished TBC specimens was also different,resulting from the different mechanisms of mixed oxides growth.Furthermore,under cyclic oxidation with water quenching at 1100℃,the cracks in the refurbished specimen tend to occur in the mixed oxides layer,while the cracks in the ordinary specimen occur in the top coat(TC)layer,attributing to the earlier and thicker mixed oxides layer formed in refurbished specimens. 展开更多
关键词 thermal barrier coating(TBC)systems coating removal refurbishMENT cyclic oxidation microstructure evolution failure mechanism
原文传递
大跨度铁路钢桥腐蚀维护技术研究进展
14
作者 娄松 吴芳 魏魁 《世界桥梁》 北大核心 2025年第1期116-124,共9页
我国现有铁路钢桥腐蚀维护技术主要包括维护性施工平台、除锈和涂层体系。施工平台多采用检查小车和简易脚手平台,局部配合“蜘蛛人”高空作业方式,或借助桥梁大修改造搭设防护棚架;钢桥杆件除锈主要采用喷砂技术;涂层体系多以环氧富锌... 我国现有铁路钢桥腐蚀维护技术主要包括维护性施工平台、除锈和涂层体系。施工平台多采用检查小车和简易脚手平台,局部配合“蜘蛛人”高空作业方式,或借助桥梁大修改造搭设防护棚架;钢桥杆件除锈主要采用喷砂技术;涂层体系多以环氧富锌底漆作为防锈底漆。现有维护性涂装施工平台技术和喷砂除锈技术应用于高铁钢桥天窗点施工存在诸多问题及难点;且传统涂料难以适用于海洋环境下的高铁钢桥涂装。针对现有技术和施工难点,提出临时性装配式操作平台、永久性铝合金检修通道和多功能机械臂3种轻型操作平台,以解决铁路安全防护和施工作业平台双重需求;对绿色环保除锈方式--激光除锈技术进行了探索;通过涂装试验选用防腐性能优异、表干时间短的重防腐涂料和涂层体系,以解决传统涂料在海洋环境下耐久性及天窗点作业时间不足的问题。 展开更多
关键词 铁路桥 高速铁路桥 跨海铁路桥 钢结构防腐 维护性涂装 施工平台 除锈 涂层体系
下载PDF
An optimisation process to motivate effective adoption of BIM for refurbishment of complex buildings in New Zealand
15
作者 Anthony Okakpu Ali GhaffarianHoseini +2 位作者 John Tookey Jarrod Haar Amirhosein Ghaffarian Hoseini 《Frontiers of Architectural Research》 CSCD 2019年第4期646-661,共16页
Despite the multidisciplinary networks involved in refurbishment of complex building projects,the lack of BIM adoption signifies lack of real BIM benefits towards acceptance of BIM within Architecture,Engineering and ... Despite the multidisciplinary networks involved in refurbishment of complex building projects,the lack of BIM adoption signifies lack of real BIM benefits towards acceptance of BIM within Architecture,Engineering and Construction(AEC).To this end,this study empirically examines the potential real benefits between traditional network and BIM network for a real-time refurbishment case study project,through agentbased simulation modelling.A social network analysis theory is adapted to model the project interaction networks and a BIM prototype network.An assessment of the main stakeholders for BIM perception is carried out.We offered three prototype interaction networks for comparison of real BIM benefit.An agent-based Bayesian network model is used to simulate the propagation of design error within the project networks.The result of the analysis show that BIM project diffuses error efficiently,while stakeholders recovers faster and nearly at the same time than traditional network.The optimised network shows better performance to the traditional network,when there is early involvement of subcontractors.The main contribution of this study is providing a novel approach to compare real benefits for traditional method to BIM method for refurbishment project and to provide avenue for project stakeholders to optimise their interaction through adoption of BIM. 展开更多
关键词 Building information modelling Stakeholders interaction Optimisation process Simulation modelling refurbishment project New Zealand
原文传递
ENVIRONMENTAL CONSEQUENCES OF REFURBISHMENT VERSUS DEMOLITION AND RECONSTRUCTION:A COMPARATIVE LIFE CYCLE ASSESSMENT OF AN ITALIAN CASE STUDY
16
作者 Francesco Pittau Dayana Giacomel +1 位作者 Giuliana Iannaccone Laura Malighetti 《Journal of Green Building》 2020年第4期155-172,共18页
In the building sector,new standards for energy efficiency are reducing the energy consumption and the carbon emissions for building operation to nearly zero.As a result,the greenhouse gas emissions and related enviro... In the building sector,new standards for energy efficiency are reducing the energy consumption and the carbon emissions for building operation to nearly zero.As a result,the greenhouse gas emissions and related environmental impacts from mate-rials production,and especially insulation,are becoming key factors.In the near future,most of the building stock is expected to be refurbished and a great amount of construction materials will be consequently required.A relevant share of waste is generated from building construction and demolition and limiting the volume is a priority of the EU community.In this work the renovation of industrial buildings in a dismissed area located in Lecco,Italy,was considered as a case study.Five alterna-tive construction systems(EPS,WOOD,ROCK,PU,HEMP)for renovating the building envelopes were assumed,and a life cycle assessment(LCA)adopted in order to measure the environmental impact of each alternative.The results were compared with a scenario which included demolition and reconstruction of a similar building with the same net volume and thermal resistance.The results showed that timber and concrete are the most environmentally friendly materials to rebuild the structures in case of demolition,contrary to steel which leads generally to higher environmental impacts,except land use.In general,EPS,WOOD and HEMP technological alter-natives accounted for the highest scores,both in terms of burdens on the ecosystems and on depletion of resources,while ROCK accounted for the lowest scores.Finally,refurbishment scenarios generally accounted for a lower global warming potential(GWP)even if demolition,waste treatment and the benefit from recycling/reuse are taken into account. 展开更多
关键词 refurbishMENT DEMOLITION RECONSTRUCTION LCA construction materials
原文传递
SCALABLE AND QUANTITATIVE DECISION SUPPORT FOR THE INITIAL BUILDING DESIGN STAGES OF REFURBISHMENT
17
作者 Sarah C.Andersen Kathrine L.Moller +2 位作者 Simon W.Jorgensen Lotte B.Jensen Morten Birkved 《Journal of Green Building》 2019年第4期35-56,共22页
Decision-making within the building industry often involves various criteria of very different natures.Some are qualitative,others quantitative,some are objective,others subjective,but ultimately,they should all be ag... Decision-making within the building industry often involves various criteria of very different natures.Some are qualitative,others quantitative,some are objective,others subjective,but ultimately,they should all be aggregated and handled holistically in order to support decision-making.This process can also be referred to as multi-criteria decision-making(MCDM).Some aspects of MCDM are often conducted unconsciously and non-transparently.By implementing mathematical methods that have been proved applicable for MCDM,multi-criteria decision-making processes can be handled more consciously and transparently and thus be made reproducible.The calculation method presented allows quantitative sustainability and qualitative indicator values to be accounted for with the level of importance desired.The MCDM method used is Technique for Order of Preference by Similarity to Ideal Solution(TOPSIS).As the model has already been described well in the scientific literature and is used frequently,the aim is to illustrate how TOPSIS can be applied for transparent decision-making within the building industry in the context of urban renewal and refurbishment schemes through case studies of various scales and descriptions.The case studies focused on in this paper incorporate a variety of specific pre-chosen criteria,including environmental performance,functional parameters and technical parameters.The case studies cover different parameters of refurbishment in a major hospital compound in Denmark due to be taken out of operation.One central design decision is whether to refurbish or demolish the old hospital buildings.The results reveal that decision support is first of all dependent on how the decision-making tool is applied and what choices are made in relation to the actual calculations.However,by implementing a mathematically based MCDM method like that being assessed in the case studies presented,the decisions and their argu-ments become transparent and are easily communicated within a project group.As a result,the tool is considered to be universally applicable across most decision-making contexts within the building industry. 展开更多
关键词 Multi-Criteria Decision Making(MCDM) mathematical decision support building design transparent decision making refurbishMENT urban renewal
原文传递
Indoor decorating and refurbishing materials and furniture volatile organic compounds emission labeling systems:A review 被引量:7
18
作者 LIU WeiWei ZHANG YinPing +1 位作者 YAO Yuan LI JingGuang 《Chinese Science Bulletin》 SCIE CAS 2012年第20期2533-2543,共11页
The volatile organic compounds (VOC) emitted from indoor decorating and refurbishing materials and furniture is recognized as one of the main causes of bad indoor air quality,which has resulted in serious economic los... The volatile organic compounds (VOC) emitted from indoor decorating and refurbishing materials and furniture is recognized as one of the main causes of bad indoor air quality,which has resulted in serious economic losses.In European countries and the U.S.,labeling systems for indoor decorating and refurbishing materials and furniture were established to address this issue with good effect.This paper is a review of these existing labeling systems.The basic principle of the labeling systems is introduced.The technical,policy and operational parts of the labeling systems are then discussed.The research concentrates on target pollutants,their threshold values and the testing methods employed.Some problems were uncovered in these labeling systems:too many VOCs were targeted;the method to determine the threshold values was not very rigorous;the testing time was too long (7-28 d).Some China's special features in developing such system are stated.Therefore,as the world's largest national producer and consumer of wood based panels and furniture,China should learn from foreign experience of establishing labeling systems as much as it can.However China should not simply copy the foreign approaches but develop its own scientific labeling system for indoor decorating and refurbishing materials and furniture. 展开更多
关键词 室内装饰装修材料 挥发性有机化合物 标签制度 家具生产 排放 室内空气质量 标签系统 经济损失
原文传递
考虑品牌优势的回收商生产模式研究:再制造或翻新
19
作者 郭强 张聪聪 聂佳佳 《工业工程》 2024年第3期130-137,158,共9页
研究品牌优势对回收商生产模式选择的影响机制,并基于三方博弈模型,运用KKT条件等方法分析不同品牌优势下,回收商选择再制造或翻新的决策条件和利益分配结果。结果表明,在品牌优势较低的情况下,回收商的生产模式选择会依赖回收成本。当... 研究品牌优势对回收商生产模式选择的影响机制,并基于三方博弈模型,运用KKT条件等方法分析不同品牌优势下,回收商选择再制造或翻新的决策条件和利益分配结果。结果表明,在品牌优势较低的情况下,回收商的生产模式选择会依赖回收成本。当回收成本较低时,全部翻新是回收商最优策略,但这会损害品牌制造商和品牌零售商的利益;当回收成本适中时,回收商倾向于部分翻新,此时品牌零售商可以从中获益,但品牌制造商会受到冲击;当回收成本较高时,回收商翻新威胁小,品牌制造商和品牌零售商都会默认接受这一结果。在品牌优势较高的情况下,回收商和品牌制造商有动机达成再制造协议,实现双方的共赢,但品牌零售商会极力反对这一协议。此外,合作再制造模式并不一定能带来更高的消费者剩余,在一定条件下,翻新竞争模式下消费者剩余可能会超过合作再制造模式下的水平。 展开更多
关键词 闭环供应链 品牌优势 再制造 翻新
下载PDF
我国城市轨道交通既有线改造路径探讨 被引量:1
20
作者 魏运 楚柏青 光志瑞 《都市快轨交通》 北大核心 2024年第1期17-21,62,共6页
随着城镇化进程的加快,城市轨道交通既有线改造在促进城轨高质量发展和城市可持续发展方面具有重要的战略意义。既有线改造涉及专业面广、待解决问题复杂,过去以解决安全问题为主要目标的消隐改造、以部分专业为对象的专项改造已难以满... 随着城镇化进程的加快,城市轨道交通既有线改造在促进城轨高质量发展和城市可持续发展方面具有重要的战略意义。既有线改造涉及专业面广、待解决问题复杂,过去以解决安全问题为主要目标的消隐改造、以部分专业为对象的专项改造已难以满足新时代既有线改造需求。因此,面对城市轨道交通高质量发展要求,亟须深入探讨我国城市轨道交通既有线改造发展路径。本文在梳理北京既有线改造历程的基础上,从面临的问题与实现的愿景两方面展开了对城市轨道交通既有线改造需求的分析,提出了既有线改造的整体思路,同时从城轨可持续发展方面创新地提出了既有线改造中的投融资思路,并从制度建设、要素活力、投融资机制、科技赋能、技术攻关、相关标准6个方面给出既有线改造工作建议,以期为我国城市轨道交通既有线改造提供思路。 展开更多
关键词 城市轨道交通 既有线改造 需求分析 改造建议
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部