Northern China has rich wind power and photovoltaic renewable resources. Combined Heat and Power (CHP) Units to meet the load demand and limit its peaking capacity in winter, to a certain extent, it results in structu...Northern China has rich wind power and photovoltaic renewable resources. Combined Heat and Power (CHP) Units to meet the load demand and limit its peaking capacity in winter, to a certain extent, it results in structural problems of wind-solar power and thermoelectric. To solve these problems, this paper proposes a plurality of units together to ensure supply of heat load on the premise, by building a thermoelectric power peaking considering thermal load unit group dynamic scheduling model, to achieve the potential of different thermoelectric properties peaking units of the excavation. Simulation examples show, if the unit group exists obvious relationship thermoelectric individual differences, the thermal load dynamic scheduling can be more significantly improved overall performance peaking unit group, effectively increase clean energy consumptive.展开更多
火电机组深度调峰是全面消纳新能源发电和构建新型电力系统的重要组成部分。火电机组深度调峰能力试验是验证机组是否具备相应调峰能力的重要手段。以630 MW超临界机组为例,从机组最小技术出力的安全性、CCS(Coordination Control Syst...火电机组深度调峰是全面消纳新能源发电和构建新型电力系统的重要组成部分。火电机组深度调峰能力试验是验证机组是否具备相应调峰能力的重要手段。以630 MW超临界机组为例,从机组最小技术出力的安全性、CCS(Coordination Control System,协调控制系统)变负荷和一次调频性能三方面开展验证试验。试验结果表明,机组在30%额定负荷(Pe)下,锅炉、汽机及其辅机安全稳定运行且环保指标达标;30%Pe~40%Pe下,CCS升降负荷速率分别为每分钟1.04%Pe和每分钟0.53%Pe,AGC(Automatic Generation Control,自动发电控制)和一次调频性能均满足规定的要求。展开更多
文摘Northern China has rich wind power and photovoltaic renewable resources. Combined Heat and Power (CHP) Units to meet the load demand and limit its peaking capacity in winter, to a certain extent, it results in structural problems of wind-solar power and thermoelectric. To solve these problems, this paper proposes a plurality of units together to ensure supply of heat load on the premise, by building a thermoelectric power peaking considering thermal load unit group dynamic scheduling model, to achieve the potential of different thermoelectric properties peaking units of the excavation. Simulation examples show, if the unit group exists obvious relationship thermoelectric individual differences, the thermal load dynamic scheduling can be more significantly improved overall performance peaking unit group, effectively increase clean energy consumptive.