期刊文献+
共找到8,893篇文章
< 1 2 250 >
每页显示 20 50 100
Numerical Analysis of the Settlement of Composite Foundation Reinforced with Crushed Stone Grouting Pile and Rigid Bearing Plate 被引量:1
1
作者 邱红胜 陈建妹 李梅 《Journal of Southwest Jiaotong University(English Edition)》 2010年第2期99-106,共8页
This paper deals with a new type of crushed stone grouting pile with a rigid bearing plate. The load transfer characteristics were analyzed, and a settlement model of the composite foundation reinforced with crushed s... This paper deals with a new type of crushed stone grouting pile with a rigid bearing plate. The load transfer characteristics were analyzed, and a settlement model of the composite foundation reinforced with crushed stone grouting pile and rigid bearing plate was built by FEM program. The effects of replacement ratio of capping plate, replacement ratio of pile, replacement ratio of grout diffusion zone, pile-soil modulus ratio, and serous-soil modulus ratio, on the composite foundation settlement were discussed. It is concluded that the proposed crushed stone grouting pile with a rigid bearing plate is effective in decreasing the settlement of composite foundation. 展开更多
关键词 Crushed stone grouting pile Composite foundation settlement Finite element analysis
下载PDF
A Model Study on Accelerated Consolidation of Coir Reinforced Lateritic Lithomarge Soil Blends with Vertical Sand Drains for Pavement Foundations 被引量:2
2
作者 George Varghese Hegde Ramakrishna +2 位作者 A.G. Nirmal Kumar L. Durga Prashanth G. Santosh 《Open Journal of Soil Science》 2012年第3期320-332,共13页
Sub-grade soils of lateritic origin encountered in the construction of highway embankments in various regions of India, often comprise intrusions of soft lithomargic soils that result in large settlements during const... Sub-grade soils of lateritic origin encountered in the construction of highway embankments in various regions of India, often comprise intrusions of soft lithomargic soils that result in large settlements during constructions, and differential settlements at later stages. This necessitates the use of appropriate soil improvement techniques to improve the load-carrying capacity of pavements. This work deals with accelerated consolidation of un-reinforced and coir-rein- forced lateritic lithomargic soil blends, provided with three vertical sand drains. The load-settlement characteristics were studied for various preloads ranging from 50 kg (0.0013 N/mm2) to 500 kg (0.013N/mm2) on soil specimens prepared in circular ferro-cement moulds. It was observed that at lower preloads up to 200kg, across the blends, the relative increase in consolidation (Rct) for randomly reinforced soil with vertical drains was sig-nificantly higher than that of un-reinforced soil without vertical drains, with an average value of 124.8%. Also, the Rct for un-reinforced soil with vertical drains was quite higher than that of un-reinforced soil without vertical drains, with an average value of 103.9%. In the case of higher preloads, the Rct values for randomly reinforced soil with vertical drains were moderate with an average value of 30.88%, while the same for un-reinforced soil with vertical drains was about 20.4%. The aspect-ratio of coir fibers used was 1:275. 展开更多
关键词 VERTICAL Sand DRAINS ACCELERATED CONSOLIDATION settlement COIR reinforcement LATERITE Shedi Lithomarge
下载PDF
Working mechanism of two-direction reinforced composite foundation 被引量:10
3
作者 张玲 赵明华 贺炜 《Journal of Central South University of Technology》 EI 2007年第4期589-594,共6页
Based on the discussion about working mechanism of horizontal reinforcement and that of vertical reinforcement,respectively,the working mechanism of two-direction reinforced composite foundation was studied.The enhanc... Based on the discussion about working mechanism of horizontal reinforcement and that of vertical reinforcement,respectively,the working mechanism of two-direction reinforced composite foundation was studied.The enhancing effect of horizontal reinforcement on vertical reinforced composite foundation was analyzed.A simplified calculation method for such two-direction reinforced working system was presented.A model experiment was carried out to validate the proposed method.In the experiment,geocell reinforcement worked as the horizontal reinforcement,while gravel pile composite foundation worked as the vertical reinforcement.The results show that the calculated curve is close to the measured one.The installation of geosynthetic reinforcement can increase the bearing capacity of composite foundation by nearly 68% at normal foundation settlement,which suggests that the enhancing effect by geosynthetic reinforcement should be taken into account in current design/analysis methods. 展开更多
关键词 复合地基 轴承 容量 力量增强
下载PDF
Bearing Capacity of Reinforced Foundation Beds on Soft Non-Homogeneous Ground
4
作者 K. Rajyalakshmi Madhira R. Madhav K. Ramu 《Journal of Civil Engineering and Architecture》 2011年第8期759-764,共6页
关键词 承载能力 非均质 钢筋 软地基 基金会 病床 颗粒填充 不排水强度
下载PDF
Ground movement patterns and shallow foundation performance in Iskenderun coastline during the 2023 Kahramanmaras earthquake sequence
5
作者 Tugce Baser Kamran Nawaz +2 位作者 Albert Chung Seikh Faysal Ozgun Alp Numanoglu 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2023年第4期867-881,共15页
This study focuses on the field reconnaissance efforts for investigating ground deformation behavior and building foundation performance in Iskenderun.Many structures experienced significant damage or collapsed due to... This study focuses on the field reconnaissance efforts for investigating ground deformation behavior and building foundation performance in Iskenderun.Many structures experienced significant damage or collapsed due to strong ground shaking in the coastal Iskenderun district of Hatay during the 2023 Kahramanmaras earthquake sequence.Many buildings were also impacted by ground failure due to liquefaction of deposits in the area.Preliminary information regarding the general subsurface profile and post-earthquake data collected during the reconnaissance was used to perform simplified liquefaction and lateral spreading analyses.The empirical methods provide first order estimations of settlements and lateral spreading but are not sufficient when the nature of the structure-soil-structure interaction and earthquake sequence is considered.Measurements of vertical displacements and building tilt,liquefaction manifestations,and structural and foundation parameters potentially affecting foundation settlements including foundation geometry,building contact pressure,and building elastic period were used to evaluate seismic response of the ground and the structures through empirical procedures.Most of the buildings exhibited poor to mediocre foundation performance due to liquefaction-prone subsurface profiles,especially on the coastline.Ongoing field and numerical research will reveal the cause of significant ground failure in the area as well as refined estimates for the seismic deformations. 展开更多
关键词 Turkiye earthquake Iskenderun settlement geo-structures LIQUEFACTION lateral spreading foundation performance building settlements seismic settlements
下载PDF
Wireless remote spatiotemporal monitoring of high-fill foundation deformation
6
作者 YANG Xiao-hui LI Zhi-qian +1 位作者 ZHU Yan-peng GUO Nan 《Journal of Mountain Science》 SCIE CSCD 2023年第6期1620-1638,共19页
The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comp... The spatial and temporal deformation patterns and deformation control indicators of highfill foundations directly affect the design,construction and operational safety of high-fill projects.In situ monitoring can comprehensively reflect the deformation of high-fill during and after construction.In this paper,we have first designed and installed an integrated wireless remote monitoring system for high-fill to achieve real-time dynamic monitoring of settlement,pore water pressure and soil pressure of the fill foundation.Based on the monitoring results of nearly one year of the construction period and two years after construction,it was found that the deformation amount and deformation rate of the high-fill foundation showed a non-linear growth relationship with the filling rate and filling height.The settlement deformation of the high-fill foundation during the loading period was mainly dominated by the original foundation soil,accounting for 54.4%of the total settlement on average;the settlement deformation during the post-construction period was mainly dominated by the filling body,accounting for 77.04%of the total settlement on average,and the settlement deformation during the post-construction period mainly occurred in the first year after construction.The analysis of the deformation mechanism suggests that the deformation of the filling body is dominated by exhaust consolidation during the loading period and drainage consolidation during the post-construction period;the deformation of the original foundation soil is dominated by drainage consolidation during the loading period and drainage consolidation develops slowly during the post-construction period.It is recommended that the original foundation should be reinforced before the large area filling construction,and that the filling rate should be strictly controlled during construction.The research results can provide a scientific basis for deformation calculation and stability assessment of high-fill foundations. 展开更多
关键词 High-fill engineering Wireless remote monitoring foundation deformation Spatiotemporal law settlement after construction
下载PDF
Experimental study on repeatedly loaded foundation soil strengthened by wraparound geosynthetic reinforcement technique 被引量:2
7
作者 Muhammad Nouman Amjad Raja Sanjay Kumar Shukla 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2021年第4期899-911,共13页
In the recent past,the potential benefits of wraparound geosynthetic reinforcement technique for constructing the reinforced soil foundations have been reported.This paper presents the experimental study on the behavi... In the recent past,the potential benefits of wraparound geosynthetic reinforcement technique for constructing the reinforced soil foundations have been reported.This paper presents the experimental study on the behaviour of model strip footing resting on sandy soil bed reinforced with geosynthetic in wraparound and planar forms under monotonic and repeated loadings.The geosynthetic layers were laid according to the reinforcement ratio to minimise the scale effect.It is found that for the same amount of reinforcement material,the wraparound reinforced model resulted in less settlement in comparison to planar reinforced models.The efficiency of wraparound reinforced model increased with the increase in load amplitude and the rate of total cumulative settlement substantially decreased with the increase in number of load cycles.The wraparound reinforced model has shown about 45% lower average total settlement in comparison to unreinforced model,while the double-layer reinforced model has about 41% lower average total settlement at the cost of approximately twice the material and 1.5 times the occupied land width ratio.Moreover,wraparound models have shown much greater stability in comparison to their counterpart models when subjected to incremental repeated loading. 展开更多
关键词 GEOSYNTHETICS Repeated loads Wraparound reinforcement technique Model tests Footing settlement Bearing capacity reinforcement ratio Strip footing
下载PDF
Reinforcement of Soft Foundation with Geotextile and Observation for Sea Dike Project of Zhapu Port 被引量:1
8
作者 章香雅 郑祖祯 《海洋工程:英文版》 2003年第2期295-306,共12页
The design method of reinforcement of soft foundation with geotextile for the sea dike of the Zhapu Port is discussed in this paper. The prototype behaviours such as pore water pressure, settlement and so on were obse... The design method of reinforcement of soft foundation with geotextile for the sea dike of the Zhapu Port is discussed in this paper. The prototype behaviours such as pore water pressure, settlement and so on were observed. The degree of consolidation is found out from observed pore water pressure and observed settlement respectively, then the strength increment of soil is calculated and compared with that obtained from vane shear tests. For the use of observed pore water pressure, the consolidation coefficient of soil is deduced approximately with a method named experimental exponential interpolation. The degree of consolidation of the ground is deduced theoretically from the dissipation of pore water pressure. Besides, the logarithmic curve and hyperbola are used to fit the observed time-settlement curve, and the degree of consolidation of soil is obtained according to the definition of the consolidation degree. After preliminary verification with observed prototype data, the method to reinforce the low dike with geotextile is considered to be simple and rational, and it can also reduce the construction cost. 展开更多
关键词 GEOTEXTILE reinforcEMENT soft foundation design prototype observation analysis
下载PDF
LS-SVM and Monte Carlo methods based reliability analysis for settlement of soft clayey foundation 被引量:5
9
作者 Yinghe Wang Xinyi Zhao Baotian Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第4期312-317,共6页
A method which adopts the combination of least squares support vector machine(LS-SVM) and Monte Carlo(MC) simulation is used to calculate the foundation settlement reliability.When using LS-SVM,choosing the traini... A method which adopts the combination of least squares support vector machine(LS-SVM) and Monte Carlo(MC) simulation is used to calculate the foundation settlement reliability.When using LS-SVM,choosing the training dataset and the values for LS-SVM parameters is the key.In a representative sense,the orthogonal experimental design with four factors and five levels is used to choose the inputs of the training dataset,and the outputs are calculated by using fast Lagrangian analysis continua(FLAC).The decimal ant colony algorithm(DACA) is also used to determine the parameters.Calculation results show that the values of the two parameters,and δ2 have great effect on the performance of LS-SVM.After the training of LS-SVM,the inputs are sampled according to the probabilistic distribution,and the outputs are predicted with the trained LS-SVM,thus the reliability analysis can be performed by the MC method.A program compiled by Matlab is employed to calculate its reliability.Results show that the method of combining LS-SVM and MC simulation is applicable to the reliability analysis of soft foundation settlement. 展开更多
关键词 foundation settlement Reliability analysis Least squares support vector machine(LS-SVM) Monte Carlo(MC) simulation Decimal ant colony algorithm(DACA)
下载PDF
Probabilistic Analysis of Shallow Foundation Settlement considering Soil Parameters Uncertainty Effects 被引量:1
10
作者 Mahmoud Nazarzadeh Soheil Sarbishe-ee 《Open Journal of Geology》 2017年第5期731-743,共13页
One of the most important challenges in the design of the foundation of the Earth layer below the surface is the Summit Foundation, which can be a very large impact on the sustainability and the structure of the desir... One of the most important challenges in the design of the foundation of the Earth layer below the surface is the Summit Foundation, which can be a very large impact on the sustainability and the structure of the desired user. Based on this analysis and design criteria of two successive ruptures (load bearing) and settlement, due to the nature of non-homogeneous soil and its parameters uncertainty, relying on one number as the amount of foundation settlement doesn’t seem logical. This is while in the methods of the probability distribution function by taking the probability for each of the input parameters, or the characteristics of each parameter, the parameter values are likely to have the chance of occurrence. In this research, effort is made using the method of probabilistic Monte Carlo simulation, the effect of the uncertainty of parameters influencing the mechanical behavior following the successive layers of earth and examined. In the event that non-deterministic model input variables for describing, not non-deterministic model output as well. So the output of each method to analysis of the concept of the probability distribution function for the input variables is a function of the probability distribution for the target function. In this study, the reliability of the settlement for the three modes of settlement center, corner of rigid foundation is fitted with two types of normal probability distribution and the log-normal distributions. For this purpose, the parameters of the effect of the transition on the analysis of soil modulus of elasticity of foundation, such as settlement and the coefficient of Poisson ratio distribution in probability using probabilistic log-normal and normal have been considered. Analysis indicated that the settlement in the center of the wake is flexible critical than the other two and has a higher probability of occurrence of the settlement in this part of the foundation. In the case of the normal distribution and the normal distribution graph of the log was used, the probability density function of the normal distribution is related to the log has a greater dispersion. 展开更多
关键词 settlement foundation Reliability UNCERTAINTY The Log-Normal DISTRIBUTION NORMAL DISTRIBUTION
下载PDF
The Effect of Alluvial Foundation on the Earth Dams Settlement 被引量:1
11
作者 Masoud Ghaemi Kaveh Ahangari +1 位作者 Ali Noorzad Kamran Goshtasbi 《Open Journal of Geology》 2017年第3期360-373,共14页
Careful monitoring in the earth dams, to measure deformation caused by settlement and movement has always been a concern for engineers in the field. In order to measure settlement and deformation of earth dams, usuall... Careful monitoring in the earth dams, to measure deformation caused by settlement and movement has always been a concern for engineers in the field. In order to measure settlement and deformation of earth dams, usually the precision instruments of settlement set and combined Inclinometer that is commonly referred to IS instrument, will be used. In some dams, because the thickness of alluvium is high and there is no possibility of alluvium removal (technically and economically and in terms of performance), there is no possibility to place the end of IS instrument (precision instruments of Inclinometer-settlement set) in the rock foundation. Inevitably, have to accept installing pipes in the weak and the deformable alluvial foundation that this leads to errors in the calculation of the actual settlement (absolute settlement) in different parts of the dam body. The purpose of this paper is to present new and refine criteria for predicting settlement and deformation in earth dams. The study is based on conditions in three dams with a deformation quite alluvial (Agh Chai, Narmashir and Gilan-e Gharb) to provide settlement criteria affected by alluvial foundation. To achieve this goal, the settlement of dams was simulated by using finite difference method with FLAC3D software and then the modeling results were compared with reading IS instrument. In the end, the caliber of the model and validate the results, by using regression analysis techniques and scrutinized modeling parameters with real situations and then by using MATLAB software and Curve Fitting Toolbox, a new criteria for the settlement based on elasticity modulus, cohesion, friction angle, density of earth dam and alluvial foundation was obtained. The results of these studies show that, by using the new criteria measures, the amount of settlement and deformation for the dams with alluvial foundation can be corrected after instrument readings and the error rate in reading IS instrument can be greatly reduced. 展开更多
关键词 Earth DAM ALLUVIAL foundation settlement Finite Difference FLAC3D MATLAB CURVE FITTING Refine Criteria IS Instrument
下载PDF
A computational method for post-construction settlement of high-speed railway bridge pile foundation considering soil creep effect 被引量:11
12
作者 冯胜洋 魏丽敏 +1 位作者 何重阳 何群 《Journal of Central South University》 SCIE EI CAS 2014年第7期2921-2927,共7页
Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using th... Based on reasonable assumptions that simplified the calculational model,a simple and practical method was proposed to calculate the post-construction settlement of high-speed railway bridge pile foundation by using the Mesri creep model to describe the soil characteristics and the Mindlin-Geddes method considering pile diameter to calculate the vertical additional stress of pile bottom.A program named CPPS was designed for this method to calculate the post-construction settlement of a high-speed railway bridge pile foundation.The result indicates that the post-construction settlement in 100 years meets the requirements of the engineering specifications,and in the first two decades,the post-construction settlement is about 80% of its total settlement,while the settlement in the rest eighty years tends to be stable.Compared with the measured settlement after laying railway tracks,the calculational result is closed to that of the measured,and the results are conservative with a high computational accuracy.It is noted that the method can be used to calculate the post-construction settlement for the preliminary design of high-speed railway bridge pile foundation. 展开更多
关键词 高速铁路桥 工后沉降 计算结果 桥梁桩基 蠕变效应 Mesri蠕变模型 桩基础 测算模型
下载PDF
Settlement Prediction for Buildings Surrounding Foundation Pits Based on a Stationary Auto-regression Model 被引量:3
13
作者 TIAN Lin-ya HUA Xi-sheng 《Journal of China University of Mining and Technology》 EI 2007年第1期78-81,共4页
To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitori... To ensure the safety of buildings surrounding foundation pits, a study was made on a settlement monitoring and trend prediction method. A statistical testing method for analyzing the stability of a settlement monitoring datum has been discussed. According to a comprehensive survey, data of 16 stages at operating control point, were verified by a standard t test to determine the stability of the operating control point. A stationary auto-regression model, AR(p), used for the observation point settlement prediction has been investigated. Given the 16 stages of the settlement data at an observation point, the applicability of this model was analyzed. Settlement of last four stages was predicted using the stationary auto-regression model AR (1); the maximum difference between predicted and measured values was 0.6 mm, indicating good prediction results of the model. Hence, this model can be applied to settlement predictions for buildings surrounding foundation pits. 展开更多
关键词 回归模型 建筑测量 安全性 沉降监测
下载PDF
Long-term settlement prediction of high-speed railway bridge pile foundation 被引量:4
14
作者 杨奇 冷伍明 +4 位作者 张升 聂如松 魏丽敏 赵春彦 刘维正 《Journal of Central South University》 SCIE EI CAS 2014年第6期2415-2424,共10页
The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensiona... The process and characteristics of loading on high-speed railway bridge pile foundation were firstly obtained by means of field research and analysis,and the corresponding loading function was presented.One-dimensional consolidation equation of elastic multilayered soils was then established with single drainage or double drainages under multilevel loading.Moreover,the formulas for calculating effective stress and settlement were derived from the Laplace numerical inversion transform.The three-dimensional composite analysis method of bridge pile group was improved,where the actual load conditions of pile foundation could be simulated,and the consolidation characteristics of soil layers beneath pile were also taken into account.Eventually,a corresponding program named LTPGS was developed to improve the calculation efficiency.The comparison between long-term settlement obtained from the proposed method and the in-situ measurements of pile foundation was illustrated,and a close agreement is obtained.The error between computed and measured results is less than 1 mm,and it gradually reduces with time.It is shown that the proposed method can effectively simulate the long-term settlement of pile foundation and program LTPGS can provide a reliable estimation. 展开更多
关键词 高速铁路桥梁 桥梁桩基 沉降预测 计算效率 现场测量 沉降桩基础 基础特性 固结方程
下载PDF
Settlement calculation for long-short composite piled raft foundation 被引量:4
15
作者 赵明华 张玲 杨明辉 《Journal of Central South University of Technology》 EI 2006年第6期749-754,共6页
The mechanism of long-short composite piled raft foundation was discussed. Assuming the relationship between shear stress and shear strain of the surrounding soil was elasto-plastic, shear displacement method was empl... The mechanism of long-short composite piled raft foundation was discussed. Assuming the relationship between shear stress and shear strain of the surrounding soil was elasto-plastic, shear displacement method was employed to establish the different explicit relational equations between the load and the displacement at the top of pile in either elastic or elasto-plastic period. Then Mylonakis & Gazetas model was introduced to simulate the interaction between two piles or between piles and soil. Considering the effect of cushion, the flexible coefficients of interaction were provided. With the addition of a relevant program, the settlement calculation for long-short composite piled raft foundation was developed which could be used to account for the interaction of piles, soil and cushion. Finally, the calculation method was used to analyze an engineering example. The calculated value of settlement is 10.2 mm, which is close to the observed value 8.8 mm. 展开更多
关键词 长短复合桩筏基础 剪切位移法 沉降计算 桩基
下载PDF
Settlement of composite foundation with discrete material pile considering modulus change
16
作者 曹文贵 刘海涛 +1 位作者 李翔 张永杰 《Journal of Central South University》 SCIE EI CAS 2008年第S2期8-14,共7页
Based on deeply discussing the deformation mechanism of composite foundation with discrete material pile, firstly, the settlement of composite foundation in rigid foundation conditions was assumed to consist of two pa... Based on deeply discussing the deformation mechanism of composite foundation with discrete material pile, firstly, the settlement of composite foundation in rigid foundation conditions was assumed to consist of two parts, an expanding part and an un-expanding part. Then, in view of the differences of deformation properties between the expanding part and the un-expanding part, the relationships between the pile modulus and the applied load in these two parts were respectively developed. Thirdly, by introducing the above relationships into settlement analysis, a new method to calculate displacement of composite foundation with discrete material pile was proposed by using the multi-stage loading theory and the layer-wise summation approach. This method is effective not only for accounting for the effect of variations of pores on deformation modulus of the pile body in different depths, but also for describing the characteristics of different deformation mechanisms of the pile body with varying depth. Finally, the proposed method was used to a practical composite foundation problem, whose theoretical results were presented and compared to those of other methods. The rationality and feasibility of this method are identified through comparative analysis. 展开更多
关键词 DISCRETE material PILE composite foundation settlement calculation pores DEFORMATION MODULUS
下载PDF
Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure
17
作者 Gu Linlin Ye Guanlin +2 位作者 Wang Zhen Ling Xianzhang Zhang Feng 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2017年第3期499-511,共13页
In this paper, numerical simulation with soil-water coupling finite element-finite difference(FE-FD) analysis is conducted to investigate the settlement and the excess pore water pressure(EPWP) of a piled-raft fou... In this paper, numerical simulation with soil-water coupling finite element-finite difference(FE-FD) analysis is conducted to investigate the settlement and the excess pore water pressure(EPWP) of a piled-raft foundation due to cyclic high-speed(speed: 300km/h) train loading. To demonstrate the performance of this numerical simulation, the settlement and EPWP in the ground under the train loading within one month was calculated and confirmed by monitoring data, which shows that the change of the settlement and EPWP can be simulated well on the whole. In order to ensure the safety of train operation, countermeasure by the fracturing grouting is proposed. Two cases are analyzed, namely, grouting in No-4 softest layer and No-9 pile bearing layer respectively. It is found that fracturing grouting in the pile bearing layer(No-9 layer) has better effect on reducing the settlement. 展开更多
关键词 high-speed train piled-raft foundation FEM settlement soil-pile interaction fracturing grouting.
下载PDF
Simulation Studies on the Settlement of Composite Foundation with Contact Element of Zero Thickness
18
作者 DongBichang WangJingtao ChengTao 《Journal of China University of Geosciences》 SCIE CSCD 2005年第1期89-94,共6页
The various factors influencing the settlement of composite foundation have been more completely studied through numerical simulation. The influence on the settlement of composite foundation of the geometry and mechan... The various factors influencing the settlement of composite foundation have been more completely studied through numerical simulation. The influence on the settlement of composite foundation of the geometry and mechanical properties of the pile, soil, cushion, and the interface between pile and soil have been investigated through computer simulation, in which the contact elements with zero thickness are used. Some valuable conclusions for the settlement of composite foundation have been obtained: (1) The method using the contact element of zero thickness is successful when used in the simulation of the settlement of composite foundation; (2) Among the factors influencing the settlement of composite foundation, the compression modulus of the soil is the largest, and the cohesion of the soil is the second largest; (3) The effects on settlement of the internal friction angle of the soil, the elastic modulus, the radius, and the length of the pile, and the elestic modulus of the cushion are also more obvious. 展开更多
关键词 settlement of composite foundation computer simulation contact element with zero thickness.
下载PDF
Settlement Characteristics of Cement Fly-Ash GravelPile-Plate Composite Foundation of High-Speed Railway
19
作者 朱明 冷旷代 马建林 《Journal of Southwest Jiaotong University(English Edition)》 2010年第1期13-18,共6页
Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the ... Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the piles and the soil between pries were measured and analyzed. The results show that the settlement-time dependency experienced three phases: rapid development phase, stable development phase and stable phase. Therefore, surcharge preloading was necessary to reduce the settlement after construction. The finite element software Plaxis was used to calculate the deformations of the pile top and the soil between piles at the embankment center, as well as the settlements of CFG pile reinforcement area and the underlying stratum under surcharge preloading. The calculation results and the field test results were compared and analyzed. Both the results show that the settlement of the composite foundation mainly occured in underlying stratum. The settlement characteristics of pile-plate composite foundation under high embankment are also concluded. 展开更多
关键词 High-speed railway CFG pile-plate composite foundation settlement characteristics Field test
下载PDF
Estimation of Settlement under Shallow Foundation for Different Regions in Iraq Using SAFE Software
20
作者 Entidhar Al-Taie Nadhir Al-Ansari Sven Knutsson 《Engineering(科研)》 2015年第7期379-386,共8页
Foundation design must satisfy limited values of settlement. Settlement is an essential criterion in the design process of shallow foundations. To calculate the settlement under different types of shallow foundations,... Foundation design must satisfy limited values of settlement. Settlement is an essential criterion in the design process of shallow foundations. To calculate the settlement under different types of shallow foundations, 79 samples were taken from twenty-three sites distributed in three regions: Mosul, Baghdad and Basrah in the northern, central and southern parts of Iraq. Field and laboratory tests were performed to obtain the strength parameters to calculate the bearing capacity. The results obtained for the bearing capacity were used in SAFE software. The software was used to design and analyze the foundation and to calculate the settlements under two types of foundations (raft and continuous) for the three regions. Average and minimum values of bearing capacity were used. The software used subgrade reaction modules values for the design and analysis. According to the results, the suitable, safe and economical type of foundation to be used in Mosul, Baghdad and Basrah regions for the average value of bearing capacity is the continuous type for the first two regions while the raft type is recommended for Basrah region. In case that the minimum bearing capacity values are used, raft foundation is recommended for Mosul and Baghdad. While deep foundation is the suitable type of foundation for Basrah region. 展开更多
关键词 RAFT foundation SILT CLAY settlement SAFE
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部