Large goods transported in railway are kinds of special goods and they are very important in national construction. In order to transport safely, loading and reinforcing schemes must be made first. How to design a rea...Large goods transported in railway are kinds of special goods and they are very important in national construction. In order to transport safely, loading and reinforcing schemes must be made first. How to design a reasonable scheme will be affected by many factors. This paper presents the characteristic of the large goods, summarizes the process of designing a loading and reinforcing scheme of large good, then probes the factors of affecting the loading and reinforcing scheme and gives a detail analysis. It’s considered that those out-of-gauge and overweight degree of goods, center-of- gravity height of a loaded wagon, position of center-of-gravity of goods, type of wagon for using, reinforcement material and reinforcement method, transport expense and transport organization could affect a scheme in the aspects of safety, economy, rapidity and convenience. This conclusion will instruct and help to make a good scheme.展开更多
Reinforced concrete(RC) load bearing wall is widely used in high-rise and mid-rise buildings. Due to the number of walls in plan and reduction in lateral force portion, this system is not only stronger against earthqu...Reinforced concrete(RC) load bearing wall is widely used in high-rise and mid-rise buildings. Due to the number of walls in plan and reduction in lateral force portion, this system is not only stronger against earthquakes, but also more economical. The effect of progressive collapse caused by removal of load bearing elements, in various positions in plan and stories of the RC load bearing wall system was evaluated by nonlinear dynamic and static analyses. For this purpose, three-dimensional model of 10-story structure was selected. The analysis results indicated stability, strength and stiffness of the RC load-bearing wall system against progressive collapse. It was observed that the most critical condition for removal of load bearing walls was the instantaneous removal of the surrounding walls located at the corners of the building where the sections of the load bearing elements were changed. In this case, the maximum vertical displacement was limited to 6.3 mm and the structure failed after applying the load of 10 times the axial load bored by removed elements. Comparison between the results of the nonlinear dynamic and static analyses demonstrated that the "load factor" parameter was a reasonable criterion to evaluate the progressive collapse potential of the structure.展开更多
文摘Large goods transported in railway are kinds of special goods and they are very important in national construction. In order to transport safely, loading and reinforcing schemes must be made first. How to design a reasonable scheme will be affected by many factors. This paper presents the characteristic of the large goods, summarizes the process of designing a loading and reinforcing scheme of large good, then probes the factors of affecting the loading and reinforcing scheme and gives a detail analysis. It’s considered that those out-of-gauge and overweight degree of goods, center-of- gravity height of a loaded wagon, position of center-of-gravity of goods, type of wagon for using, reinforcement material and reinforcement method, transport expense and transport organization could affect a scheme in the aspects of safety, economy, rapidity and convenience. This conclusion will instruct and help to make a good scheme.
文摘Reinforced concrete(RC) load bearing wall is widely used in high-rise and mid-rise buildings. Due to the number of walls in plan and reduction in lateral force portion, this system is not only stronger against earthquakes, but also more economical. The effect of progressive collapse caused by removal of load bearing elements, in various positions in plan and stories of the RC load bearing wall system was evaluated by nonlinear dynamic and static analyses. For this purpose, three-dimensional model of 10-story structure was selected. The analysis results indicated stability, strength and stiffness of the RC load-bearing wall system against progressive collapse. It was observed that the most critical condition for removal of load bearing walls was the instantaneous removal of the surrounding walls located at the corners of the building where the sections of the load bearing elements were changed. In this case, the maximum vertical displacement was limited to 6.3 mm and the structure failed after applying the load of 10 times the axial load bored by removed elements. Comparison between the results of the nonlinear dynamic and static analyses demonstrated that the "load factor" parameter was a reasonable criterion to evaluate the progressive collapse potential of the structure.