Mental workload is considered to be strongly linked to human performance,and the ability to measure it accurately is key for balancing human health and work.In this study,brain signals were elicited by mental arithmet...Mental workload is considered to be strongly linked to human performance,and the ability to measure it accurately is key for balancing human health and work.In this study,brain signals were elicited by mental arithmetic tasks of varying difficulty to stimulate different levels of mental workload.In addition,a finite impulse response(FIR)filter,independent component analysis(ICA),and multiple artifact rejection algorithms(MARAs)were used to filter event-related potentials(ERPs).Then,the data consisting of ERPs,subjective ratings of mental workload,and task performance,were analyzed through the use of variance and Spearman’s correlation during a simulated computer task.We found that participants responded faster and performed better in the easy task condition,followed by the medium and high-difficulty conditions,which verifies the validity of the ERP filtering.Moreover,larger P2 and P3 waveforms were evoked as the task difficulty increased,and a higher task difficulty elicited a more enhanced N300.Correlation analysis revealed a negative relationship between the amplitude of P3 and the subjective ratings,and a positive relationship between the P3 amplitude and accuracy.The results presented in this paper demonstrate that a combination of FIR,ICA,and MARA methods can filter ERPs in the non-invasive real-time measurement of workload.Additionally,frontocentral P2,N3,and parietal P3 components showed differences between genders.The proposed measurement of mental workload can be useful for real-time identification of mental states and can be applied to human-computer interaction in the future.展开更多
The conventional Markov chain Monte Carlo (MCMC) method is limited to the selected shape and size of proposal distribution and is not easy to start when the initial proposal distribution is far away from the target ...The conventional Markov chain Monte Carlo (MCMC) method is limited to the selected shape and size of proposal distribution and is not easy to start when the initial proposal distribution is far away from the target distribution. To overcome these drawbacks of the conventional MCMC method, two useful improvements in MCMC method, adaptive Metropolis (AM) algorithm and delayed rejection (DR) algorithm, are attempted to be combined. The AM algorithm aims at adapting the proposal distribution by using the generated estimators, and the DR algorithm aims at enhancing the efficiency of the improved MCMC method. Based on the improved MCMC method, a Bayesian amplitude versus offset (AVO) inversion method on the basis of the exact Zoeppritz equation has been developed, with which the P- and S-wave velocities and the density can be obtained directly, and the uncertainty of AVO inversion results has been estimated as well. The study based on the logging data and the seismic data demonstrates the feasibility and robustness of the method and shows that all three parameters are well retrieved. So the exact Zoeppritz-based nonlinear inversion method by using the improved MCMC is not only suitable for reservoirs with strong-contrast interfaces and longoffset ranges but also it is more stable, accurate and antinoise.展开更多
A new dual-actuator fatigue loading system of wind turbine blades was designed.Compared with the traditional pendulum loading mode,the masses in this system only moved linearly along the loading direction to increase ...A new dual-actuator fatigue loading system of wind turbine blades was designed.Compared with the traditional pendulum loading mode,the masses in this system only moved linearly along the loading direction to increase the exciting force.However,the two actuators and the blade constituted a complicated non-linear energy transferring system,which led to the non-synchronization of actuators.On-site test results showed that the virtual spindle synchronous strategy commonly used in synchronous control was undesirable and caused the instability of the blade’s amplitude eventually.A cross-coupled control strategy based on the active disturbance rejection algorithm was proposed.Firstly,a control system model was built according to the synchronization error and tracking error.Furthermore,based on arranging the transition process,estimating the system state and error feedback,and compensating disturbance,an active disturbance rejection controller was designed by adopting the optimal control function.Finally,on-site test results showed that the cross-coupled control strategy based on the active disturbance rejection algorithm could ensure the synchronization of two actuators.The maximum speed synchronization error of the two motors was less than 16 RPM,the displacement synchronization error of the two actuators was less than 0.25 mm and approaching zero after 4 seconds,and the peak value of vibration of the blade was less than 5 mm,which satisfied the fatigue test requirement.展开更多
基金supported by the National Natural Science Foundation of China(Nos.71801002,71701003)the Humanities and Social Science Fund of the Ministry of Education of China(No.18YJC630023)+1 种基金the Natural Science Foundation of Anhui Province(No.1808085QG228)the Postdoctoral Program of Liaoning Province.
文摘Mental workload is considered to be strongly linked to human performance,and the ability to measure it accurately is key for balancing human health and work.In this study,brain signals were elicited by mental arithmetic tasks of varying difficulty to stimulate different levels of mental workload.In addition,a finite impulse response(FIR)filter,independent component analysis(ICA),and multiple artifact rejection algorithms(MARAs)were used to filter event-related potentials(ERPs).Then,the data consisting of ERPs,subjective ratings of mental workload,and task performance,were analyzed through the use of variance and Spearman’s correlation during a simulated computer task.We found that participants responded faster and performed better in the easy task condition,followed by the medium and high-difficulty conditions,which verifies the validity of the ERP filtering.Moreover,larger P2 and P3 waveforms were evoked as the task difficulty increased,and a higher task difficulty elicited a more enhanced N300.Correlation analysis revealed a negative relationship between the amplitude of P3 and the subjective ratings,and a positive relationship between the P3 amplitude and accuracy.The results presented in this paper demonstrate that a combination of FIR,ICA,and MARA methods can filter ERPs in the non-invasive real-time measurement of workload.Additionally,frontocentral P2,N3,and parietal P3 components showed differences between genders.The proposed measurement of mental workload can be useful for real-time identification of mental states and can be applied to human-computer interaction in the future.
基金sponsorship of the National Natural Science Foundation of China (41674130, 41404088)the National Basic Research Program of China (973 Program, 2013CB228604, 2014CB239201)+1 种基金the National Oil and Gas Major Projects of China (2016ZX05027004-001, 2016ZX05002005-09HZ)the Fundamental Research Funds for the Central Universities (14CX02113A, 15CX08002A) for their funding in this research
文摘The conventional Markov chain Monte Carlo (MCMC) method is limited to the selected shape and size of proposal distribution and is not easy to start when the initial proposal distribution is far away from the target distribution. To overcome these drawbacks of the conventional MCMC method, two useful improvements in MCMC method, adaptive Metropolis (AM) algorithm and delayed rejection (DR) algorithm, are attempted to be combined. The AM algorithm aims at adapting the proposal distribution by using the generated estimators, and the DR algorithm aims at enhancing the efficiency of the improved MCMC method. Based on the improved MCMC method, a Bayesian amplitude versus offset (AVO) inversion method on the basis of the exact Zoeppritz equation has been developed, with which the P- and S-wave velocities and the density can be obtained directly, and the uncertainty of AVO inversion results has been estimated as well. The study based on the logging data and the seismic data demonstrates the feasibility and robustness of the method and shows that all three parameters are well retrieved. So the exact Zoeppritz-based nonlinear inversion method by using the improved MCMC is not only suitable for reservoirs with strong-contrast interfaces and longoffset ranges but also it is more stable, accurate and antinoise.
基金the National Key R&D Program of China,Grant No.2018YFB1501203Meanwhile,this research was funded by the Natural Science Foundation of Shandong,Grant No.ZR2019MEE076And the work in this paper has partly received funding from the National Key R&D Program of Shandong,Grant No.2019GGX104001.
文摘A new dual-actuator fatigue loading system of wind turbine blades was designed.Compared with the traditional pendulum loading mode,the masses in this system only moved linearly along the loading direction to increase the exciting force.However,the two actuators and the blade constituted a complicated non-linear energy transferring system,which led to the non-synchronization of actuators.On-site test results showed that the virtual spindle synchronous strategy commonly used in synchronous control was undesirable and caused the instability of the blade’s amplitude eventually.A cross-coupled control strategy based on the active disturbance rejection algorithm was proposed.Firstly,a control system model was built according to the synchronization error and tracking error.Furthermore,based on arranging the transition process,estimating the system state and error feedback,and compensating disturbance,an active disturbance rejection controller was designed by adopting the optimal control function.Finally,on-site test results showed that the cross-coupled control strategy based on the active disturbance rejection algorithm could ensure the synchronization of two actuators.The maximum speed synchronization error of the two motors was less than 16 RPM,the displacement synchronization error of the two actuators was less than 0.25 mm and approaching zero after 4 seconds,and the peak value of vibration of the blade was less than 5 mm,which satisfied the fatigue test requirement.