A pilot scale modified step-feed process was lmproved to increase nutrient/N ano P) ano organic removal operations from municipal wastewater. It combined the step-feed process and a method named "University of Cape ...A pilot scale modified step-feed process was lmproved to increase nutrient/N ano P) ano organic removal operations from municipal wastewater. It combined the step-feed process and a method named "University of Cape Town (UCT)". The effect of nutrient ratios and inflow distribution ratios were studied. The highest uptake efficiency of 95% for chemical oxygen demand (COD) has been achieved at the inflow distribution ratio of 40/35/25. However, maximum removal efficiency obtained for total nitrogen (TN) and phosphorus at 93% and 78%, respectively. The average mixed liquor suspended solids (MLSS) was 5500 mg·L- 1. In addition, convenient values for dissolved oxygen (DO) concentration, and pH were obtained throughout different stages. The proposed system was identified to be an appropriate enhanced biological nutrient removal process for wastewater treatment plants owing to relatively high nutrient removal, sturdy sludge settle ability and COD removal.展开更多
To solve the problem of excavation face dust control,the theory of dust removal after collection was put forward.Through a large number of theoretical and experimental researches,a new wind screen dust-collection syst...To solve the problem of excavation face dust control,the theory of dust removal after collection was put forward.Through a large number of theoretical and experimental researches,a new wind screen dust-collection system which was applied to comprehen- sive excavation face was developed.To set a wind dam in jet stream box,achieve the function of multi-stage and multiple-level regulation,lots of experimentation was carried out to obtain higher jet stream velocity with the minimum loss of energy.Experiments show that the slit width in the exports of wind screen dust-collection system should be 10 to 15 mm.For the general excavation roadway,after wind attenuation,the velocity can be greater than 3 m/s at the roof which meets the requirements of respirable dust control.展开更多
文摘A pilot scale modified step-feed process was lmproved to increase nutrient/N ano P) ano organic removal operations from municipal wastewater. It combined the step-feed process and a method named "University of Cape Town (UCT)". The effect of nutrient ratios and inflow distribution ratios were studied. The highest uptake efficiency of 95% for chemical oxygen demand (COD) has been achieved at the inflow distribution ratio of 40/35/25. However, maximum removal efficiency obtained for total nitrogen (TN) and phosphorus at 93% and 78%, respectively. The average mixed liquor suspended solids (MLSS) was 5500 mg·L- 1. In addition, convenient values for dissolved oxygen (DO) concentration, and pH were obtained throughout different stages. The proposed system was identified to be an appropriate enhanced biological nutrient removal process for wastewater treatment plants owing to relatively high nutrient removal, sturdy sludge settle ability and COD removal.
基金the National Natural Science Foundation of China(f010206)
文摘To solve the problem of excavation face dust control,the theory of dust removal after collection was put forward.Through a large number of theoretical and experimental researches,a new wind screen dust-collection system which was applied to comprehen- sive excavation face was developed.To set a wind dam in jet stream box,achieve the function of multi-stage and multiple-level regulation,lots of experimentation was carried out to obtain higher jet stream velocity with the minimum loss of energy.Experiments show that the slit width in the exports of wind screen dust-collection system should be 10 to 15 mm.For the general excavation roadway,after wind attenuation,the velocity can be greater than 3 m/s at the roof which meets the requirements of respirable dust control.