期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
双约束品位计算机法配矿的研究
1
作者 邓如平 汪锦璋 《有色金属》 CSCD 1989年第1期1-10,共10页
本文主要阐明矿山的矿产资源是一种非再生的耗竭性资源,如何最大限度、最优利用这些矿资源,对提高矿山企业的经济效益和社会效益都具有重要意义。借助于单目标系统线性规划的管理决策方法,提出用单、双约束品位计算法配矿(煤)来求解,使... 本文主要阐明矿山的矿产资源是一种非再生的耗竭性资源,如何最大限度、最优利用这些矿资源,对提高矿山企业的经济效益和社会效益都具有重要意义。借助于单目标系统线性规划的管理决策方法,提出用单、双约束品位计算法配矿(煤)来求解,使入选矿石贫富兼容,实现配矿(煤)的最优策略。 展开更多
关键词 non-regenerative and exhaustible resource ore blending computed curve behaviour “DCG”---double constrained grade
下载PDF
The Optimal Depletion of Exhaustible Resource under Different Commitment 被引量:1
2
作者 Zhou Wei Wu Kangping 《Chinese Journal of Population,Resources and Environment》 2012年第2期60-66,共7页
There are few papers in the literature focusing on the issue of the optimal depletion of exhaustible resources in the framework of variable time preference. This paper attempts to analyze the pure consumption of exhau... There are few papers in the literature focusing on the issue of the optimal depletion of exhaustible resources in the framework of variable time preference. This paper attempts to analyze the pure consumption of exhaustible resource under hy- perbolic time preference, and to discuss the optimal depletion rate and the effect of the protection of the exhaustible resource under different commitment abilities. The results of model show that the case of the hyperbolic discount with the full commitment of the govemment is equivalent to the case of constant discount of the social planner problem. In that case, the optimal depletion rate and the initial consumption of exhaustible resource are the slowest. On the contrary, they are the highest and the myopic behaviors lead to excessive consumption of exhaustible resources inevitably without commitment. Otherwise, in the case of partial commit- ment, the results are between the cases of full commitment and of no commitment. Therefore, with the hyperbolic time preference, the optimal depletion rate of resource depends on the commitment ability. Higher commitment ability leads to lower effective rate of time preference, and consequently, lower depletion rate and lower initial depletion value. The improvement of commitment ability can decrease the impatience and myopia behaviors, and contribute to the protection of the exhaustible resources. 展开更多
关键词 exhaustible resource time preference hyperbolic dis-counting commitment ability
下载PDF
The research of economic development law in resourceful city
3
作者 路世昌 《Journal of Coal Science & Engineering(China)》 2001年第2期103-107,共5页
The resource advantage of resourceful region has made the region develop very fast. However because the resource is of exhausting character, this means that the region has hidden troubles of economic depression. The p... The resource advantage of resourceful region has made the region develop very fast. However because the resource is of exhausting character, this means that the region has hidden troubles of economic depression. The paper analyzes the formation of resourceful region and the law of resourceful regions economic development, and then the paper brings forward that the resourceful region has a potential danger of economic depression. Considering Chinas economic development practice, the paper puts forward a basic way of thinking. That is: we must attach importance to the problem of industrial structure when we pay attention to existing resource advantage in order to avoid the simplification of regional industrial structure and to avoid entering a vicious cycle. 展开更多
关键词 resourceful region exhausting of resource regional depression economic law
下载PDF
OPTIMAL MAINTENANCE AND REPLACEMENT OF EXTRACTION MACHINERY 被引量:1
4
作者 Suresh P. SETHI Hong-Mo YEH +1 位作者 Rong ZHANG Andrew K.S. JARDINE 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2008年第4期416-431,共16页
This paper considers a problem of optimal preventive maintenance and replacement schedule of equipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most o... This paper considers a problem of optimal preventive maintenance and replacement schedule of equipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most one replacement of the existing machinery by a new one is allowed. The problem is formulated as an optimal control problem subject to the state constraint that the remaining deposit at any given time is nonnegative. We show that the optimal preventive maintenance, production rates, and the replacement and salvage times of the existing machinery and the new one, if required, can be obtained by solving sequentially a series of free-end-point optimal control problems. Moreover, an algorithm based on this result is developed and used to solve two illustrative examples. 展开更多
关键词 Maintenance and replacement optimal control the maximum principle extraction machinery exhaustible resource
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部