期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Pollutants removal and simulation model of combined membrane process for wastewater treatment and reuse in submarine cabin for long voyage 被引量:1
1
作者 CHEN Zhaobo ZHOU Aijuan +2 位作者 REN Nanqi TIAN Yu HU Dongxue 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2009年第11期1503-1512,共10页
A laboratory scale test was conducted in a combined membrane process (CMP) with a capacity of 2.91 m3/d for 240 d to treat the mixed wastewater of humidity condensate, hygiene wastewater and urine in submarine cabin... A laboratory scale test was conducted in a combined membrane process (CMP) with a capacity of 2.91 m3/d for 240 d to treat the mixed wastewater of humidity condensate, hygiene wastewater and urine in submarine cabin during prolonged voyage. Removal performance of chemical oxygen demand (COD), ammonia nitrogen (NH4^+-N), turbidity and anionic surfactants (LAS) was investigated under different conditions. It was observed that the effluent COD, NH4^+-N, turbidity and LAS flocculated in ranges of 0.19-0.85 mg/L, 0.03-0.18 mg/L, 0.0-0.15 NTU and 0.0-0.05 mg/L, respectively in spite of considerable fluctuation in corresponding influent of 2120-5350 mg/L, 79.5-129.3 mg/L, 110-181.1NTU and 4.9-5.4 mg/L. The effluent quality of the CMP could meet the requirements of mechanical water and hygiene water according to the class I water quality standards in China (GB3838-2002). The removal rates of COD, NH4^+-N, turbidity and LAS removed in the MBR were more than 90%, which indicated that biodegradation is indispensable and plays a major role in the wastewater treatment and reuse. A model, built on the back propagation neural network (BPNN) theory, was developed for the simulation of CMP and produced high reliability. The average error of COD and NH4^+-N was 5.14% and 6.20%, respectively, and the root mean squared error of turbidity and LAS was 2.76% and 1.41%, respectively. The results indicated that the model well fitted the laboratory data, and was able to simulate the removal of COD, NH4^+-N, turbidity and LAS. It also suggested that the model proposed could reflect and manage the operation of CMP for the treatment of the mixed wastewaters in submarine. 展开更多
关键词 combined membrane process wastewater treatment and reuse back propagation neural network
下载PDF
Coking wastewater treatment for industrial reuse purpose: Combining biological processes with ultrafiltration, nanofiltration and reverse osmosis 被引量:39
2
作者 Xuewen Jin Enchao Li +2 位作者 Shuguang Lu Zhaofu Qiu Qian Sui 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2013年第8期1565-1574,共10页
A full-scale plant using anaerobic, anoxic and oxic processes (A1/A2/O), along with a pilot-scale membrane bioreactor (MBR), nanofiltration (NF) and reverse osmosis (RO) integrated system developed by Shanghai... A full-scale plant using anaerobic, anoxic and oxic processes (A1/A2/O), along with a pilot-scale membrane bioreactor (MBR), nanofiltration (NF) and reverse osmosis (RO) integrated system developed by Shanghai Baosteel Chemical Co. Ltd., was investigated to treat coking wastewater for industrial reuse over a period of one year. The removals reached 82.5% (COD), 89.6% (BOD), 99.8% (ammonium nitrogen), 99.9% (phenol), 44.6% (total cyanide (T-CN)), 99.7% (thiocyanide (SCN-)) and 8.9% (fluoride), during the A1/A2/O biological treatment stage, and all parameters were further reduced by over 96.0%, except for fluoride (86.4%), in the final discharge effluent from the currently operating plant. The pilot-scale MBR process reduced the turbidity to less than 0.65 NTU, and most of the toxic organic compounds were degraded or intercepted by the A1/A2/O followed MBR processes. In addition, parameters including COD, T-CN, total nitrogen, fluoride, chloride ion, hardness and conductivity were significantly reduced by the NF-RO system to a level suitable for industrial reuse, with a total water production ratio of 70.7%. However, the concentrates from the NF and RO units were highly polluted and should be disposed of properly or further treated before being discharged. 展开更多
关键词 coking wastewater industrial water reuse biological treatment MBR NF-RO
原文传递
Comprehensive Analysis of 9-year Running Data of A^2/O-MBR in Xi an Siyuan University 被引量:6
3
作者 Xuemei ZHANG Jingyuan HAO +3 位作者 Qinghua MA Dong LI Bo FU Baolan QIN 《Meteorological and Environmental Research》 CAS 2020年第5期139-143,共5页
Since September 2011,A 2/O-MBR wastewater treatment plant in Xi'an Siyuan University has been successfully running without replacing any of membrane modules.A total of 6.661 million m^3 of campus wastewater has be... Since September 2011,A 2/O-MBR wastewater treatment plant in Xi'an Siyuan University has been successfully running without replacing any of membrane modules.A total of 6.661 million m^3 of campus wastewater has been treated,and 4.405 million m^3 of water reaching the national urban miscellaneous water standard has been reclaimed and reused.A total of 25 km pipeline,5 pits,scenery fountains,lakes,and 12 pump stations have been constructed for flushing toilets,irrigating green grass lawn and afforest,and cleaning hardened pavement.The design and construction of 5 pits,scenery fountains,and lakes are important to meet the national urban miscellaneous water standard under occasional phosphorus and/or nitrogen exceed concentration.The unit water cost is 4.19 yuan/m^3,including membrane modules depreciation and amortization.After the A 2/O-MBR system passes the membrane modules depreciation and amortization period,the unit water cost is 2.82 yuan/m^3.The water productivity of the membrane stack rises first at the beginning of operation,reaches the maximum value,and then decreases.The average annual transmembrane pressure difference increases by 1.12 kPa.The average VMD of industrial permeability decreases annually by 0.45 m^3. 展开更多
关键词 Wastewater treatment and reuse system A 2/O-MBR system Economic feasibility Industrial permeability Membrane fouling
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部