The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment ...The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment projects and the traditional risk evaluation method of agricultural projects. We think that the applications of the sensitivity analysis and probability are defective. Therefore, this article introduces a structural model to evaluate the risks of the agricultural high-tech investment projects and the system of the concrete evaluation indexes.展开更多
Vietnam has become a major market for construction enterprises from East Asian countries, especially from China, to participate in international project contracting, but serious schedule delays have important adverse ...Vietnam has become a major market for construction enterprises from East Asian countries, especially from China, to participate in international project contracting, but serious schedule delays have important adverse effects on local government and foreign investment companies. Based on international engineering contracting mode of Vietnam highway BOT construction projects, we discussed the drive financial factors of schedule delays, using the methods of exploratory factor analysis and questionnaire survey, and evaluated the effects of various factors which are through regression analysis. The empirical results show that the five categories of financial factors, including the policy change, slow payment, financial mismanagement, financial market changes and lack of fiscal, have significant effects on schedule delay. Furtherly, we suggested that strengthening policy research and improving financial management ability should be used to reduce the influence of relevant financial factors on schedule delay, to improve the profitability of international businesses and the motivation of foreign enterprises to participate in Vietnam highway project.展开更多
The proposed hydroelectric project on the Yangtze Gorges will be one of the largest power stations in the world.The problem of induced seismicity to the project has attracted much attention throughout China and the wo...The proposed hydroelectric project on the Yangtze Gorges will be one of the largest power stations in the world.The problem of induced seismicity to the project has attracted much attention throughout China and the world.A research program has been carried out by the State Seismological Bureau of China.Based on the size of the reservoir and the lithology,geological structure,permeability,stress state,and previous seismicity in the region,the potential risk of reservoir-induced seismicity has been estimated.The results suggest that,after impoundment in the reservoir area,the possibility of induced seismicity cannot be completely ruled out.The areas with potential risk may be in some gorges composed of karstified carbonate and plutonic granite around the dam site.However,the magnitude is expected to be limited owing to the small dimension of the induced seismogenic faults.展开更多
Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped w...Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.展开更多
Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. I...Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved.展开更多
Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of ...Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of the projects. The muhilayer evaluation index system for the international engineering project risk assessment is proposed and constructed, which consists of 8 I-grade indexes and 24 II-grade indexes as policy risk, market risk, resource risk, and technical scheme risk, schedule risk, funding risk, personnel risk and management risk. And then the self-evaluation and benchmarking evaluation methods are applied to evaluate the international engineering project risk, and established the corresponding mathematical models. Finally, a project evaluation example is given to illustrate the applicability and effectiveness of the mathematical models.展开更多
The risk evaluation of power transmission and transformation projects is a complex and comprehensive evaluation process influenced by many factors and involves many indicators.In order to solve the uncertainty and fuz...The risk evaluation of power transmission and transformation projects is a complex and comprehensive evaluation process influenced by many factors and involves many indicators.In order to solve the uncertainty and fuzziness problems in the process of the multilevel fuzzy risk evaluation of power transmission and transformation projects,this paper introduces the cloud theory,which is specialized in the study of uncertainty problems and constructs the multilevel fuzzy comprehensive risk-evaluation model of power transmission and transformation projects based on the improved multilevel fuzzy-thought weighting based on the cloud model.Finally,the risk of the Beijing 220-kV Tangyu power transmission and transformation project is evaluated and the feasibility of the evaluation model is verified.The results of the evaluation and the evaluation layer cloud model are combined with MATLAB simulation to show that the risk level of the project is between large risk and general risk.展开更多
文摘The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment projects and the traditional risk evaluation method of agricultural projects. We think that the applications of the sensitivity analysis and probability are defective. Therefore, this article introduces a structural model to evaluate the risks of the agricultural high-tech investment projects and the system of the concrete evaluation indexes.
文摘Vietnam has become a major market for construction enterprises from East Asian countries, especially from China, to participate in international project contracting, but serious schedule delays have important adverse effects on local government and foreign investment companies. Based on international engineering contracting mode of Vietnam highway BOT construction projects, we discussed the drive financial factors of schedule delays, using the methods of exploratory factor analysis and questionnaire survey, and evaluated the effects of various factors which are through regression analysis. The empirical results show that the five categories of financial factors, including the policy change, slow payment, financial mismanagement, financial market changes and lack of fiscal, have significant effects on schedule delay. Furtherly, we suggested that strengthening policy research and improving financial management ability should be used to reduce the influence of relevant financial factors on schedule delay, to improve the profitability of international businesses and the motivation of foreign enterprises to participate in Vietnam highway project.
文摘The proposed hydroelectric project on the Yangtze Gorges will be one of the largest power stations in the world.The problem of induced seismicity to the project has attracted much attention throughout China and the world.A research program has been carried out by the State Seismological Bureau of China.Based on the size of the reservoir and the lithology,geological structure,permeability,stress state,and previous seismicity in the region,the potential risk of reservoir-induced seismicity has been estimated.The results suggest that,after impoundment in the reservoir area,the possibility of induced seismicity cannot be completely ruled out.The areas with potential risk may be in some gorges composed of karstified carbonate and plutonic granite around the dam site.However,the magnitude is expected to be limited owing to the small dimension of the induced seismogenic faults.
文摘Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved.
文摘Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved.
基金supported by National Natural Science Foundation of China under Grant No.71172123Aviation Science Fund under Grant No.2012ZG53083humanities and social science research special task project of Chinese Ministry of education under Grant No.10JDSZ1010
文摘Risk evaluation is one of the important elements of international engineering project management. The risk factors of international engineering projects are systematically analyzed from multiple dimension features of the projects. The muhilayer evaluation index system for the international engineering project risk assessment is proposed and constructed, which consists of 8 I-grade indexes and 24 II-grade indexes as policy risk, market risk, resource risk, and technical scheme risk, schedule risk, funding risk, personnel risk and management risk. And then the self-evaluation and benchmarking evaluation methods are applied to evaluate the international engineering project risk, and established the corresponding mathematical models. Finally, a project evaluation example is given to illustrate the applicability and effectiveness of the mathematical models.
文摘The risk evaluation of power transmission and transformation projects is a complex and comprehensive evaluation process influenced by many factors and involves many indicators.In order to solve the uncertainty and fuzziness problems in the process of the multilevel fuzzy risk evaluation of power transmission and transformation projects,this paper introduces the cloud theory,which is specialized in the study of uncertainty problems and constructs the multilevel fuzzy comprehensive risk-evaluation model of power transmission and transformation projects based on the improved multilevel fuzzy-thought weighting based on the cloud model.Finally,the risk of the Beijing 220-kV Tangyu power transmission and transformation project is evaluated and the feasibility of the evaluation model is verified.The results of the evaluation and the evaluation layer cloud model are combined with MATLAB simulation to show that the risk level of the project is between large risk and general risk.