In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the w...In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the water supply in the reservoirs of Yellow River. Resuhs show that under the hydraulic loading rate of 4 m^3/( m^2 · d), the average removal rates of chemical oxygen demand (COD), total nitrogen (TN), ammonium nitrogen ( NH4 ^+ - N), nitrate nitrogen ( NO3 ^- - N), nitrite - nitrogen ( NO2^ - - N) and total phosphorus (TP) in the horizontal flow constructed wetlands are 49. 68% , 53.01%, 48.48%, 53.61% , 62. 57% and 49. 56%, re- spectively. The study on purifying mechanism of the constructed wetlands indicates that the disposal of contamination by subsurface wetlands is the combined actions of physical chemistry, plants and microorganism.展开更多
Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection...Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection of waste slag yard of water diversion project and design of water and soil conservation measures are discussed.Rationality of site selection of waste slag yard and pertinence of prevention and control measures of water and soil loss in waste slag yard are analyzed,and comprehensive utilization of waste slag in large-scale production and construction projects is explored.展开更多
基金Sponsored by the National High Technology Research and Development Program (863) of China (Grant No.2006AA06Z303)the National Natural Sci-ence Foundation of China(Grant No.40671004)the Program for Young Academic Backbone of Harbin Normal University(Grant No.KGB200821)
文摘In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the water supply in the reservoirs of Yellow River. Resuhs show that under the hydraulic loading rate of 4 m^3/( m^2 · d), the average removal rates of chemical oxygen demand (COD), total nitrogen (TN), ammonium nitrogen ( NH4 ^+ - N), nitrate nitrogen ( NO3 ^- - N), nitrite - nitrogen ( NO2^ - - N) and total phosphorus (TP) in the horizontal flow constructed wetlands are 49. 68% , 53.01%, 48.48%, 53.61% , 62. 57% and 49. 56%, re- spectively. The study on purifying mechanism of the constructed wetlands indicates that the disposal of contamination by subsurface wetlands is the combined actions of physical chemistry, plants and microorganism.
文摘Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection of waste slag yard of water diversion project and design of water and soil conservation measures are discussed.Rationality of site selection of waste slag yard and pertinence of prevention and control measures of water and soil loss in waste slag yard are analyzed,and comprehensive utilization of waste slag in large-scale production and construction projects is explored.