期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Efficiency and mechanism of pretreatment on water supply in reservoirs of Yellow River by subsurface constructed wetlands 被引量:1
1
作者 杨旭 于水利 +3 位作者 赵焱 严晓菊 修春海 王冬光 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2009年第5期652-655,共4页
In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the w... In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the water supply in the reservoirs of Yellow River. Resuhs show that under the hydraulic loading rate of 4 m^3/( m^2 · d), the average removal rates of chemical oxygen demand (COD), total nitrogen (TN), ammonium nitrogen ( NH4 ^+ - N), nitrate nitrogen ( NO3 ^- - N), nitrite - nitrogen ( NO2^ - - N) and total phosphorus (TP) in the horizontal flow constructed wetlands are 49. 68% , 53.01%, 48.48%, 53.61% , 62. 57% and 49. 56%, re- spectively. The study on purifying mechanism of the constructed wetlands indicates that the disposal of contamination by subsurface wetlands is the combined actions of physical chemistry, plants and microorganism. 展开更多
关键词 constructed wetland water supply in reservoirs of Yellow river PRETREATMENT efficiency and mechanism
下载PDF
Site Selection of Waste Slag Yard and Design of Protective Measures in Water Supply Project of Drawing from the Songhua River in Central Cities of Jilin
2
作者 Hongchao LIU Jun LV 《Meteorological and Environmental Research》 CAS 2021年第4期49-51,共3页
Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection... Water supply project of drawing from the Songhua River in central cities of Jilin is taken as research object.On the basis of analyzing project characteristics and natural conditions of the project area,site selection of waste slag yard of water diversion project and design of water and soil conservation measures are discussed.Rationality of site selection of waste slag yard and pertinence of prevention and control measures of water and soil loss in waste slag yard are analyzed,and comprehensive utilization of waste slag in large-scale production and construction projects is explored. 展开更多
关键词 Waste slag yard Layout principle Prevention and control measures Comprehensive utilization of waste slag Water supply project of drawing from the Songhua river Jilin
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部